Flaherty, Julia E.

Publications and source records attributed to Flaherty, Julia E..

Hanford Waste Treatment Plant Low Activity Waste Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation (Rev.1)

The Hanford Tank Waste Treatment and Immobilization Plant Low Activity Waste (LAW) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of discovering that sampling locations do not meet the qualification criteria on the full-scale stacks. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAW stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing, determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. For this analysis, the range of qualified flow rates listed is conservatively based on the average DV through 6 DV for LV-S1, LV-S2, and LV-C2, and 1/3 DV to 3 DV for LV-S3. Table S1 lists the operating flow rates along with the conservative lower and upper qualified stack flow rates for each of the LAW facility stacks. For each stack, the operating flow is below the upper qualified stack.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing, determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rates along with the average and maximum qualified stack flow rates for each of the LAB facility stacks. For each stack, the operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10°, except for the LB-C2 Fan A results, which were an average of 13.7°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 4.1% COV, which were all within the range of the target percent coefficient of variation values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ARM FY2024 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility’s radar capability aims to provide high-quality radar observations to the scientific community, advancing the understanding of clouds and precipitation processes and ultimately improving climate models. ARM operates radars across a spectrum of frequencies with diverse scanning capacities (Table 1) to meet these scientific goals. The maintenance, operations, and management of these distributed radars at sites in various climate regimes require a substantial staffing commitment. However, the existing staffing resources are constrained, making it impractical to sustain the consistent high-quality operations that are expected by the ARM user community. In response, ARM needs to develop priorities for the radar team each year. This report lays out the forthcoming priorities for Financial Year 2024 (FY24), aiming to establish a structure for the ongoing management of radar operations and data processing.

54 ENVIRONMENTAL SCIENCES↗

Assessment of the 3430 Building Filtered Exhaust Stack Sampling Probe Location: Stack Verification Following Fan and Air Blender Additions

The velocity uniformity and flow angle results from the 3430 stack verification tests, performed in April 2023, demonstrated that the CFD model results may be used to support the qualification of the stack sampling location. The measured velocity uniformity verification test result was 2.1 %COV. This value is well within the uniformity criterion, which is that the velocity uniformity be =20 %COV. Additionally, this value is well within the criterion that the actual stack measurement must be within 5% of the surrogate stack (i.e., CFD modeled stack); in this case the CFD modeled average result of 2.85 %COV for the nominal operating range of 22,800 cfm to 62,400 cfm. Additionally, the measured average flow angle at the 3430 stack monitor location was 5.6 degrees. The result is =20 degrees, so the criterion is met.

3430 Building↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management Facility (EMF) stack monitor location was qualified using a combination of scale model stacks to mitigate the risk of identifying that the sampling location does not meet the qualification criteria on the full-scale stack. The LV-S1 scale model stack was used as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling locations were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. The LV-S1, LB-S1, and LV-S2 scale model stack tests have met the criteria of the ANSI/HPS N13.1-1999 standard to demonstrate the stack sampling locations are well mixed. Verification tests of the EMF stack were performed at normal operating conditions. The minimum 1/6 DV value and the maximum 6 DV value from the scale model testing determine the range of stack flow rates for which the full-scale stack may be operated while remaining in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rate along with the average and maximum qualified stack flow rate based on the LV-S1 scale model DV values. The operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were <5°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, all of which were within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all planned fan operating configurations. This includes each combination of ACV fans with DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Low Activity Waste Facility Stack Effluent Monitoring - Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant low activity waste (LAW) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAW stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAW stacks are 815–55,758 scfm for LV-S1, 980–112,078 scfm for LV-S2, 264–22,901 scfm for LV-S3, and 981–79,832 scfm for LV-C2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAW facility. Flow angle results were primarily less than 10°, except for one LV-S2 Fan A result, which was 13.2°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 1.5 COV and 9.2% COV, which were all within the range of the target % COV values from the scale model tests. Based on these stack verification test results, the four LAW filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan operating conditions for LV-S1 and LV-S2, dual-fan operations for LV-S3 at both the continuous air monitor and record sampler locations, and both the single-fan as well as the dual-fan operations for LV-C2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management facility (EMF) stack monitor location was qualified using the LV-S1 scale model stack as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale models and its sampling locations were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the EMF stack was performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on the LV-S1 scale model test DV values, the corresponding stack flow rates for the EMF stack are as listed in Table S1. Table S1. Effluent Management Facility Stack Qualified Flow Range. Stack Parameter EM-1 Minimum Qualified Stack Flow (scfm) 781 Maximum Qualified Stack Flow (scfm) 53,432 The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were less than 5°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, which were all within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes each combination of ACV fan with the DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Validation of wind resource and energy production simulations for small wind turbines in the United States

Abstract. Due to financial and temporal limitations, the small wind community relies upon simplified wind speed models and energy production simulation tools to assess site suitability and produce energy generation expectations. While efficient and user-friendly, these models and tools are subject to errors that have been insufficiently quantified at small wind turbine heights. This study leverages observations from meteorological towers and sodars across the United States to validate wind speed estimates from the Wind Integration National Dataset (WIND) Toolkit, the European Centre for Medium-Range Weather Forecasts (ECMWF) Reanalysis v5 (ERA5), and the Modern-Era Retrospective Analysis for Research and Applications, version 2 (MERRA-2), revealing average biases within ±0.5 m s−1 at small wind hub heights. Observations from small wind turbines across the United States provide references for validating energy production estimates from the System Advisor Model (SAM), Wind Report, MyWindTurbine.com, and Global Wind Atlas 3 (GWA3), which are seen to overestimate actual annual capacity factors by 2.5, 4.2, 11.5, and 7.3 percentage points, respectively. In addition to quantifying the error metrics, this paper identifies sources of model and tool discrepancies, noting that interannual fluctuation in the wind resource, wind speed class, and loss assumptions produces more variability in estimates than different horizontal and vertical interpolation techniques. The results of this study provide small wind installers and owners with information about these challenges to consider when making performance estimates and thus possible adjustments accordingly. Looking to the future, recognizing these error metrics and sources of discrepancies provides model and tool researchers and developers with opportunities for product improvement that could positively impact small wind customer confidence and the ability to finance small wind projects.

17 WIND ENERGY↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAB stacks are 625 to 47,237 scfm for LB-C2, 1,704 to 103,131 scfm for LB-S1, and 467 to 18,088 scfm for LB-S2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10 degrees, except for the LB-C2 Fan A results, which were an average of 17.6 degrees; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 3.5% COV, which were all within the range of the target %COV values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Size dependent infectivity of SARS-CoV-2 via respiratory droplets spread through central ventilation systems

In this work, we evaluate the transport of respiratory droplets that carry SARS-CoV-2 through central air handling systems in multiroom buildings. Respiratory droplet size modes arise from the bronchioles representing the lungs and lower respiratory tract, the larynx representing the upper respiratory tract including vocal cords, or the oral cavity. The size distribution of each mode remains largely conserved, although the magnitude of each droplet mode changes as infected individuals breathe, speak, sing, laugh, cough, and sneeze. Here we evaluate how each type of respiratory droplet transits through central ventilation systems and the implications thereof for infectivity of COVID-19. We find that while larger oral droplets can transmit through the air handling systems, their size and concentration are greatly reduced with but few oral droplets leaving the source room. In contrast, the smaller droplets that originate from the bronchioles and larynx are much more effective in transiting through the air handling system into connected rooms. This suggests that the ratio of lower respiratory or deep lung infections may increase relative to upper respiratory infections in rooms connected by central air handling systems. Also, increasing the temperature and humidity in the range considered after the droplets have achieved an “equilibrium” size reduces the probability of infection.

60 APPLIED LIFE SCIENCES↗

Experimental evaluation of respiratory droplet spread to rooms connected by a central ventilation system

This article presents results from an experimental study to ascertain the transmissibility of the SARS-CoV-2 virus between rooms in a building that are connected by a central ventilation system. Respiratory droplet surrogates made of mucus and virus mimics were released in one room in a test building and measurements of concentration levels were made in other rooms connected via the ventilation system. The paper presents experimental results for different ventilation system configurations, including ventilation rate, filtration level (up to MERV-13), and fractional outdoor air intake. The most important finding is that respiratory droplets can and do transit through central ventilation systems, suggesting a mechanism for viral transmission (and COVID-19 specifically) within the built environment in reasonable agreement with well-mixed models. We also find the deposition of these droplets on room walls to be negligibly small. Furthermore, the energy use impact of the different configuration settings is also quantified to help inform intelligent building operation that can simultaneously address energy use and occupant health.

60 APPLIED LIFE SCIENCES↗

A missing layer in COVID-19 studies: Transmission of enveloped viruses in mucus-rich droplets

Here we evaluate the influence of mucus layers on the evaporation time and transport of enveloped viruses, including SARS-CoV-2. Enveloped viruses must remain moist to be fully infective. Yet, the Wells model based on water droplets divides respiratory droplets into either quickly evaporated aerosolized particles termed droplet nuclei (<10 s) or liquid droplets that fall to the nearest surface, leaving no physical mechanism for airborne transmission of fully infective enveloped viruses over large distances (greater than a few meters). Yet, the role of mucus layers on evaporation times has not been considered even though the formation of mucus shells around liquid cores of respiratory droplets has been shown experimentally. Here we show that mucus shells increase the drying time by orders of magnitude so that enveloped virions may remain well hydrated and, thus, fully infective at substantial distances. Further, this provides a mechanism by which infective enveloped virus particles can transmit as aerosols within buildings and between buildings over extended distances. This analysis is important because public health agencies typically follow the Wells model to establish health policies including social/physical distancing guidelines.

60 APPLIED LIFE SCIENCES↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The WTP LAB stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the ANSI/HPS N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the DV of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The maximum 6 DV value from the scale model testing determines the maximum conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be = 20°. Second, the velocity uniformity at the full-scale stack must be = 20% COV. Finally, the velocity uniformity results for the actual and scale model stacks must agree within 5% COV. In general, these criteria were met through the full-scale stack tests at the LAB facility. Some specific items for each scale model and full-scale stack comparison should be noted in assessing the validity of the verification tests. The LB-C2 scale model stacks were performed with single fan operations at then-minimum flow conditions. These conditions resulted in DV values that were too low to meet the DV range criterion, and therefore are unable to be used in qualifying single fan operations on the full-scale stack. However, the single fan operations demonstrated COV values for velocity uniformity as well as flow angles that were comparable to the dual-fan operations at high flows. Overall, the test conditions and test results were within the range of acceptable values based on current design flow rates. Single fan operations are expected to only occur infrequently for maintenance needs and is therefore not a planned operating condition at this time. The LB-S1 scale model stacks were performed at three fan combinations, and in each combination, at least one test was performed at the then-minimum flow conditions as well as at then-maximum flow conditions. While the then-minimum flow conditions result in a DV range that is lower than the verification test DV value, and therefore does not meet the criterion, these tests are un-necessary for the verification test acceptance. The normal and maximum flow conditions from the scale model stack tests meet the DV range criterion, and the velocity uniformity test results compare favorably with the full-scale stack results. The LB-S2 scale model stacks were performed at nominally the same maximum flow condition; however, the 6 DV value for Fan A operation was slightly lower than the full-scale stack test DV. The COV values from the scale model stacks were comparable between the Fan A and Fan B results, and the overall test conditions are within the range of acceptable values. The stack verification is therefore considered acceptable for both Fan A and Fan B operations. The verification tests were performed at flows that were appreciably higher than the design conditions, and further elevated flow rates would be beyond the range of acceptable DV. Based on these stack verification test results, the three LAB filtered exhaust stacks meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the scale model test reports (Glissmeyer, Flaherty, and Piepel (2001), Glissmeyer and Geeting (2013)) may require additional tests and additional analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of potential aerosol transmission and infectivity of SARS-CoV-2 through central ventilation systems

Here we evaluate the concentrations and probabilities of infection for both building interior and exterior exposure sources using a well-mixed model in a connected multizone building. As a central hub of many community and economic activities, buildings provide social connectivity, but the COVID-19 pandemic has reduced social connectivity due to concerns of viral spread within buildings. Although single zone models of infectious spread are well studied, the impact of aerosolized spread of SARS-CoV-2 via air handling systems in multizone buildings remains unexplored. Here we evaluate the influence of filtration, air exchange rates, and the fraction of outdoor air on the probability of infection using the well-known well-mixed modeling approach for a multizone. We find filtration lowers the concentration and probability of infection in both source and connected rooms provided at least some air is recirculated, but that probability is not zero. Filtration has no influence without recirculation or unless the outdoor air contains virus. We find that increasing the air exchange rate removes virus from the source room faster but also increases the rate of exposure to connected rooms. Therefore, slower air exchange rates reduce infectivity in connected rooms at shorter durations, but higher air exchange rates reduce infectivity at longer durations. We further find that when outdoor air is virus free, increasing the fraction of outdoor air is helpful, but, when outdoor air is infective, pathogen exposure inside can persist for hours after a short-term release.

60 APPLIED LIFE SCIENCES↗

Assessment of the 3420 Building Filtered Exhaust Stack Sampling Probe Location: Stack Verification Following Fan and Air Blender Additions

The Pacific Northwest National Laboratory (PNNL) 3420 Building, which is part of the Physical Sciences Facility (PSF), houses radiological capabilities that results in the requirement that emissions monitoring must be conducted for potential radionuclides in the exhaust air discharge of this building. The air monitoring system is required to conform to Title 40 of the Code of Federal Regulations part 61 (40 CFR 61) Subpart H, which in turns requires a sampling probe in the exhaust stream to conform to the criteria of American National Standards Institute / Health Physics Society (ANSI/HPS) N13.1-2011, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. To support the air emissions permit for the 3420 Building on the PNNL campus, stack testing that used computational fluid dynamics (CFD) modeling as a surrogate stack and verification tests of velocity uniformity and flow angle on the retrofitted facility stack was performed. The ANSI/HPS N13.1-2011 criteria for the air monitoring probe location are that velocity uniformity, gaseous tracer uniformity, and particulate tracer uniformity must be less than or equal to 20%COV. Furthermore, no point in the sampling location may have a gaseous tracer concentration that varies from the mean concentration by more than 30%. Additionally, the flow angle at the sampling location must not be more than 20°. The CFD modeling of the stack, as reported by Recknagle et al. (2018) demonstrated that the stack meets the criteria at the probe location. The velocity uniformity and flow angle results from the 3420 stack verification tests, performed in October 2020, demonstrated that the CFD model results may be used to support the qualification of the stack sampling location. The measured velocity uniformity verification test result was 1.4%COV. This value is well within the uniformity criterion, which is that the velocity uniformity be =20%COV. Additionally, this value is well within the criterion that the actual stack measurement must be within 5% of the surrogate stack result of 2.1%COV when all four fans were operating. Additionally, the measured average flow angle at the 3420 stack monitor location was 15.5 degrees. Although this is higher than expected based on the CFD model, the result is =20 degrees, so the criterion is met. Based on these stack verification test results, the reconfigured 3420 Building filtered exhaust stack meets the qualification criteria given in the ANSI/HPS N13.1-2011 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the CFD report (Recknagle et al., 2018) may require additional tests and additional analysis to determine compliance with the standard.

3420 Building↗