Cost details from front-end engineering design of piperazine with the advanced stripper

This Front-End Engineering Design (FEED) was funded by the U.S. Department of Energy (DOE) to estimate the cost to capture and compress 90% of the CO 2 from an existing natural gas combined cycle (NGCC) in Denver City, Texas, USA. The FEED used the PZAS (Piperazine with the Advanced Stripper) 2G amine scrubbing technology developed and modeled by The University of Texas at Austin. This FEED is unique in providing more public cost details than other FEEDs funded by DOE. The primary objective of the FEED was to provide a comprehensive estimate for the total installed cost of the capture plant. The estimated capital cost of NGCC at the Mustang Station is $\$727$ million for a capacity of 460 MW and 1.6 million tonnes CO 2 /yr. This includes a contingency of $\$104.6$ million and a contractor’s profit of $\$60.1$ million. The total direct field cost is $\$384.1$ million. With an optimistic fuel value of $\$3$/MMBtu, the estimated cost of capture varies from $\$85$/t at 4% IRR/85% load to $\$170$/t at 10% IRR/52% load. Air cooling is technically feasible but expensive. The air cooling systems for the water wash and pump-around intercooling account for 23.4% of the direct cost. The gas-fired boilers represent only 4% of the direct costs, but steam extraction would reduce energy cost, free up cooling water, and reduce the direct costs of processing additional flue gas and CO 2 from the boilers. The absorbers represent 9.6% of the direct cost in this FEED with no direct contact cooler and only 7.6 m of packing. Furthermore, the solvent cross exchangers are less expensive than expected (2.5% of direct costs). Doubling the number of these exchangers could reduce the heat duty from 3.0 to 2.5 GJ/t CO 2 .

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Creative absorber design and optimization for CO 2 capture with aqueous piperazine

The Texas Carbon Management Program is preparing a Front-End Engineering Design (FEED) of the PZASTM (Piperazine with the Advanced Stripper TM ) for CO 2 capture at a natural gas combined cycle power plant in West Texas. This paper develops the absorber design for the capture system and studies the operational strategies of the absorber in response to ambient temperature swing. The design uses 2 absorber trains, and each train integrates absorption and a water-wash section in one column. Each column has a cross-section area of 174 m 2 and consists of 3 sections of MellapakPlus® 252Y structured packing. Packing heights for each section are 3, 4.9, and 2.7 m from top to bottom. A pump-around intercooler applied at the bottom bed circulates solvent and eliminates the direct contact cooler. The baseline CO 2 removal rate is 90% and will vary between 78% and 90% with ambient temperature. The system uses air cooling to eliminate cooling water usage. The water balance in the system will be managed by operating the water wash at a high circulation rate (1300 kg/h) to condense water during the night and make up for water loss during the day. Finally, the proposed design reduces the capital cost of the absorber column by minimizing the packing height and eliminating the direct contact cooler (DCC), and improves the energy cost by lowering the pump-around intercooling temperature and increasing the pump-around rate.

03 NATURAL GAS↗