Creative absorber design and optimization for CO 2 capture with aqueous piperazine

Abstract

The Texas Carbon Management Program is preparing a Front-End Engineering Design (FEED) of the PZASTM (Piperazine with the Advanced Stripper TM ) for CO 2 capture at a natural gas combined cycle power plant in West Texas. This paper develops the absorber design for the capture system and studies the operational strategies of the absorber in response to ambient temperature swing. The design uses 2 absorber trains, and each train integrates absorption and a water-wash section in one column. Each column has a cross-section area of 174 m 2 and consists of 3 sections of MellapakPlus® 252Y structured packing. Packing heights for each section are 3, 4.9, and 2.7 m from top to bottom. A pump-around intercooler applied at the bottom bed circulates solvent and eliminates the direct contact cooler. The baseline CO 2 removal rate is 90% and will vary between 78% and 90% with ambient temperature. The system uses air cooling to eliminate cooling water usage. The water balance in the system will be managed by operating the water wash at a high circulation rate (1300 kg/h) to condense water during the night and make up for water loss during the day. Finally, the proposed design reduces the capital cost of the absorber column by minimizing the packing height and eliminating the direct contact cooler (DCC), and improves the energy cost by lowering the pump-around intercooling temperature and increasing the pump-around rate.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Gao, Tianyu, Rochelle, Gary T.. 2022-11-29. Creative absorber design and optimization for CO 2 capture with aqueous piperazine. https://doi.org/10.1016/j.ijggc.2021.103534

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Green Era Anaerobic Digester

Green Era Educational NFP constructed and commissioned the Green Era Renewable Energy & Urban Farming Campus in Chicago’s Auburn Gresham neighborhood. The project transformed a long-vacant brownfield site into a commercial-scale anaerobic digestion facility that converts food waste into renewable natural gas and nutrient-rich material for agricultural use. The facility can process up to 80,000 wet tons of food waste annually and supports approximately 15 permanent jobs while advancing food waste diversion, renewable energy production, nutrient recovery and community revitalization.

03 NATURAL GAS↗

Circumventing thermodynamic limitations in converting carbon dioxide into carbon nanotubes via tandem catalysis

Carbon nanotubes (CNTs) are important materials for electronics and structural composites, but their production still relies on hydrocarbon-based chemical vapor deposition, an energy-intensive and fossil-dependent process, limited by rapid catalyst deactivation. Using CO2 as a carbon feedstock offers a sustainable route for CNT synthesis, yet direct CO2 conversion to CNTs is thermodynamically unfavorable and existing CO2-to-carbon pathways mainly yield amorphous or weakly graphitized solids. Here, we demonstrate a tandem electrochemical–thermochemical (EC-TC) strategy that overcomes these limitations. CO2 is first electrochemically reduced to a tunable mixture of C2H4 and CO, which is directly fed into a thermochemical reactor and converted into CNTs with controllable morphology and high CNT-to-metal mass ratios (~200) over NiFe catalysts at 750 °C. In situ synchrotron-based characterization and density functional theory calculations reveal that CO dissociation and C2H4 decomposition on NiFe alloys cooperatively promote CNT nucleation and sustained growth. This EC-TC strategy establishes a modular route for converting CO2 into value-added carbon nanomaterials.

03 NATURAL GAS↗

Coordinated Natural Gas and Electric Planning: Case Studies of Current Approaches and Practices

This paper examines how natural gas and electric utilities across eight U.S. states and two Canadian provinces are beginning to coordinate historically separate planning processes in response to growing system interdependencies, policy mandates, aging infrastructure, and changing customer energy choices. Electricity planning has long relied on robust integrated resource planning frameworks that weigh numerous objectives, risks, and costs. Natural gas planning, on the other hand, is typically less transparent and more narrowly focused on safety and system integrity. As economic, reliability, and policy drivers place new and shared demands on both systems, jurisdictions and utilities are experimenting with approaches such as coordinated forecasting, non pipeline alternatives, and combined planning pilots. A few have issued regulatory or statutory directives for greater data sharing and methodological alignment. Case studies from British Columbia, California, Colorado, Illinois, Massachusetts, Minnesota, New York, Québec, Rhode Island, and Washington illustrate a wide range of approaches to rethinking siloed planning. The paper identifies several common themes across the jurisdictions examined. It provides observations on the methods, processes, and organizational steps that may be needed in the future to address the challenges being faced by states and utilities. Lastly, it identifies some initial steps that states and utilities can consider if they would like to pursue more integrated, cost-effective, policy-aligned energy system planning.

03 NATURAL GAS↗