Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations

The commercial nuclear sector faces unprecedented financial challenges driven by low natural gas prices and subsidized renewables in a marketplace that does not reward carbon-free baseload capacity. These circumstances, along with increasingly antiquated labor-centric operating models and analog technology, have forced the premature closure of multiple nuclear facilities and placed a much larger population of nuclear power stations at risk. Nuclear plant economic survival in current and forecasted market conditions requires an efficient and technology-centric operating model that harvests the native efficiencies of advanced technology. This is analogous to transformations in nearly every other industry. In light of previous industry experience in modernizing safety Instrumentation and Controls (I&C) systems, nuclear utilities are reluctant to pursue these upgrades due to uncertainty in licensing and cost.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations

This LWRS research seeks to assist in breaking the impasse which has precluded digital safety system upgrades by generating and demonstrating a process and related business case tool to enable a Business Case Analysis (BCA). The purpose of a BCA is to show such upgrades can be economically justified. This BCA methodology first systematically establishes a forecast of expected lifecycle costs for I&C identified for upgrade by: • Definitively bounding the scope of current I&C systems envisioned for upgrade. • Collecting historical labor and material usage data that bound cost contributors related to the systems to be upgraded. • Synthesizing and analyzing the data to establish lifecycle cost forecasts for the current systems. In collaboration with engineers familiar with the attributes of the digital equipment to be used in the upgrade and how it is envisioned to be applied, cost savings categories and expected savings in those categories are then identified and applied using the analysis tools developed for this purpose. The result is an estimate NPV of savings enabled by the upgrade. This includes both direct cost savings (e.g., surveillance labor costs) as well as cost avoidance items (e.g., inventory carrying costs). Finally, when utility-provided digital upgrade costs estimates are included, the resultant BCA provides an NPV for the upgrade project. Development of a useful BCA methodology requires a real-world basis. With the cooperation of Exelon Generation (“Owner”), an Exelon-owned 2-Unit BWR Station (“Station”) was used as the foundation for this research. Exelon is pursuing a digital upgrade of current, first-echelon, safety-related I&C systems at these units, including the following: • Reactor Protection System (RPS) • Nuclear Steam Supply Shutoff System (N4S) • Emergency Core Cooling Systems (ECCS) • Anticipated Transient Without Scram (ATWS) Mitigation System

22 GENERAL STUDIES OF NUCLEAR REACTORS↗