Search NASA⌕ Search

Engineering topics

King, Abigail

Publications and source records attributed to King, Abigail.

Assessing the Resource Adequacy and Community Impacts of an Evolving Grid: Considerations for State Regulators

As U.S. power systems continue to decarbonize, state regulators must be able to broadly assess the cost and reliability implications of proposed fossil retirements and the corresponding resources that are coming online to replace them. Specifically, regulators must evaluate whether proposed infrastructure investments are sufficient to ensure the long-term reliability of the system, while also protecting rate payers by ensuring that such investments are necessary and not excessive. Broadly speaking, this objective is typically framed in terms of maintaining long-term resource adequacy at the lowest cost, while also ensuring that other social and/or environmental objectives are satisfied. System planners currently have a host of sophisticated analytical tools at their disposal to evaluate the cost-benefit trade-offs of different approaches to ensuring resource adequacy. However, most of these tools and associated metrics were designed with traditional power systems in mind. Over the past decade, it has become increasingly clear that the metrics and models that have reliably assessed resource adequacy in systems dominated by large thermal and hydropower resources will be insufficient for systems with significant contributions from emerging technologies such as wind, solar and storage. Therefore, in recent years many new metrics and modeling approaches have been developed, and are increasingly being implemented, to meet the needs of the clean energy transition.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Non-Powered Dam Hydropower Development and Ranking Opportunity Tool

In pursuit of a net-zero-carbon emissions economy in the United States, non-powered dams (NPDs) represent a large opportunity to develop hydropower while leveraging existing infrastructure. With almost 600 NPD sites in the United States identified as having over 1 megawatt (MW) of potential capacity, only a small portion of the total potential capacity at these sites has been developed in recent years. , Conventional NPD retrofit feasibility analysis primarily focuses on the developer’s perspective but fails to consider the broader impacts of developing a dam, including on the neighboring communities. This tool, the Non-Powered Dam Hydropower Development and Ranking Opportunity Tool (NPD HYDRO), allows users to prioritize or rank NPD sites for future development based on user-defined priorities. Benefits can be evaluated in several categories: the grid, community, industry, and environment (referred to as the four impact scores in the tool as discussed in Section 2.2). In addition, the tool provides the user with a qualitative measure for the feasibility of adding energy storage during NPD conversion, specifically battery, hydrogen electrolysis, and pumped-storage hydropower (PSH). By taking a holistic approach to the potential range of benefits provided by NPD conversions with results tailored to the user’s priorities, NPD HYDRO provides the opportunity for national-level screening and enables users to focus on the sites that are most closely aligned with their interests.

13 HYDRO ENERGY↗

Hydropower Potential at Non-Powered Dams: A Multi-Criteria Decision Analysis Tool based on Grid, Community, Industry, and Environmental Impacts

Non-powered dams (NPDs) are dams that do not include hydraulic turbine (hydropower) equipment. Currently, there are more than 80,000 such dams in the United States, which provide a variety of non-energy benefits, including flood control, water supply, navigation, and recreation. Approximately 500 of these NPDs are identified as having the potential to add hydropower generation (totaling up to a capacity of more than 8200 MW). A large share of investment costs and environmental impacts of dam construction have already been incurred at these NPDs. Hence, adding power to the existing dam structure is hypothesized to be achieved at a lower cost, with less risk, and a shorter timeframe than the development required for new dam construction. The abundance of NPDs, the associated environmental favorability, and cost advantages, combined with the reliability, predictability, and dispatchability of hydropower, make NPDs a strong candidate in the nation’s renewable energy portfolio. To assess the NPD to hydropower conversion potential, in this study, we developed a GIS-based multi-criterial decision analysis tool, which allows users to rank these NPDs based on the grid, community, industry, and environmental impacts (i.e., GCIE impacts). This web-based interactive tool (developed using open-source Python and JavaScript) lets the user choose from a wide range of features to define each of the GCIE impact scores through a user-friendly graphical user interface. These features are related to dam operation, hydropower generation opportunity, power market economy, social vulnerability and risk, proximity to critical infrastructure and energy generating facilities, environmental concerns (air, water, and critical habitat), and exposure to natural hazards. The overall priority score of NPDs is calculated based on user-defined weights for each of the GCIE impact scores. Besides ranking NPDs, the tool can also be used to estimate the energy-storage feasibility (battery, hydrogen, and pump-storage hydropower) at each of the potential sites.

13 HYDRO ENERGY↗