Abstract

Non-powered dams (NPDs) are dams that do not include hydraulic turbine (hydropower) equipment. Currently, there are more than 80,000 such dams in the United States, which provide a variety of non-energy benefits, including flood control, water supply, navigation, and recreation. Approximately 500 of these NPDs are identified as having the potential to add hydropower generation (totaling up to a capacity of more than 8200 MW). A large share of investment costs and environmental impacts of dam construction have already been incurred at these NPDs. Hence, adding power to the existing dam structure is hypothesized to be achieved at a lower cost, with less risk, and a shorter timeframe than the development required for new dam construction. The abundance of NPDs, the associated environmental favorability, and cost advantages, combined with the reliability, predictability, and dispatchability of hydropower, make NPDs a strong candidate in the nation’s renewable energy portfolio. To assess the NPD to hydropower conversion potential, in this study, we developed a GIS-based multi-criterial decision analysis tool, which allows users to rank these NPDs based on the grid, community, industry, and environmental impacts (i.e., GCIE impacts). This web-based interactive tool (developed using open-source Python and JavaScript) lets the user choose from a wide range of features to define each of the GCIE impact scores through a user-friendly graphical user interface. These features are related to dam operation, hydropower generation opportunity, power market economy, social vulnerability and risk, proximity to critical infrastructure and energy generating facilities, environmental concerns (air, water, and critical habitat), and exposure to natural hazards. The overall priority score of NPDs is calculated based on user-defined weights for each of the GCIE impact scores. Besides ranking NPDs, the tool can also be used to estimate the energy-storage feasibility (battery, hydrogen, and pump-storage hydropower) at each of the potential sites.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Tamaddun, Kazi, Usman, Muhammad Usama, Powell, Devyn, King, Abigail, Meng, Jakob P, Woodruff, Nathan Lee, Mosier, Thomas M. 2023-05-18. Hydropower Potential at Non-Powered Dams: A Multi-Criteria Decision Analysis Tool based on Grid, Community, Industry, and Environmental Impacts. https://doi.org/10.1061/9780784484852.003

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Validation of the NLR Pumped Storage Hydropower Cost Model

The National Laboratory of the Rockies (NLR) first released its pumped storage hydropower (PSH) cost model in 2023 as the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The PSH cost model cannot replace detailed site-level studies and design, but it is important to validate it against other industry PSH cost estimates. The initial model methodology report validated the cost model for a single proposed site, the Eagle Mountain Project in California. This slide deck documents an expanded validation exercise using cost data from six other sites: Goldendale (Washington), Seminoe (Wyoming), Gordon Butte (Montana), Swan Lake (Oregon), White Pine (Oregon), and Lewis Ridge (Kentucky). It compares itemized costs from Federal Energy Regulatory Commission (FERC) applications and other reported costs with NLR PSH cost model outputs after customizing inputs for each site. The validation exercise finds that the NLR model's conservative indirect cost assumptions often drive overall cost overestimation, with direct cost comparisons typically agreeing more closely. All cost model estimates are well within an Association for the Advancement of Cost Engineering (AACE) Class 5 estimation range (-50% to +100%), with five within the AACE Class 4 range (-30% to +50%) and four being within 15%. This result is considered reasonable performance for a parametric model applied at a preliminary design stage.

13 HYDRO ENERGY↗

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY↗

Staying Current: A Community Readiness Framework for Marine Energy Applied to River Current Energy in Alaska

Marine energy-including wave, tidal, and river current energy-can provide a local energy source for rural and remote communities. Marine energy has the potential to bolster self-sufficiency and create economic opportunities while preserving ecological integrity. Communities may be interested in deploying, testing, and advancing these early-stage technologies to meet their needs. However, limited capacity, workforce constraints, and other barriers can challenge development. To better understand a community's interest in and preparedness for marine energy, we developed a suite of 150 'metrics of readiness.' Organized across seven categories-technical, social, environmental, strategic, governance, economic, financial-and 29 subcategories, the metrics provide a holistic perspective beyond the technical aspects of an energy device. We conducted a desktop application of the metrics of readiness for Igiugig, Alaska. The metrics were applied retrospectively for two points in time: before (2009) and after (2018) in-stream testing of a river current energy device. By documenting changes among categories and subcategories of the metrics, our results show the evolving nature of community readiness for river current energy. They also illustrate how our interdisciplinary framework captures the investment in environmental effects research and commitment to strategic planning that occurred in Igiugig. In future applications, we envision the framework could be used to foster public engagement in marine energy, collaborate with communities in project development, shape capacity building activities, prioritize investments, and inform research needs. While our study focuses on enabling river current energy in Alaska, the metrics of readiness have the potential to inform implementation of other renewable technologies with communities in new geographies.

13 HYDRO ENERGY↗