Active Reservoir Management Engineering and Evaluation Summary – Brine Extraction and Storage Test Phase II Final Report – Volumes 1-3

The Energy & Environmental Research Center (EERC) conducted a multiyear program over two phases to perform a field study of the potential efficacy of formation water extraction during carbon dioxide (CO 2 ) injection for CO 2 storage as a means of improving efficiency and/or effectiveness. Phase I was a 2-year study on potential methodologies for a field study of pressure management, culminating in site selection and experimental and site design. Phase II was a 7-year effort that involved constructing site facilities, conducting experiments, and evaluating collected field data. The experimental portion was split into two collaborative components, one for the active reservoir management (ARM) experiment and a second component to host and demonstrate potential water treatment technologies appropriate for high-saline brine at the project site. The results of the overall project are expected to benefit future saline storage projects through validation of techniques that may reduce stress on sealing formations, increase storage capacity, and reduce area of review. The following report focuses on the Phase II ARM experimental implementation and results. A second companion report summarizes the results of the high-saline brine demonstrations.

54 ENVIRONMENTAL SCIENCES↗

Quantifying the effects of pressure management for the Williston basin Brine Extraction and Storage Test (BEST) site using machine learning

Active reservoir management (ARM) through brine extraction can reduce pressure buildup during large-scale implementation of carbon capture and storage (CCS) projects. This study used machine learning (ML)-assisted approaches to analyze bottomhole pressure (BHP) responses to various brine injection and extraction scenarios. Field monitoring data were collected over a 2-year operation period at two injection wells and one extraction well (about 400 meters away) as part of a Brine Extraction and Storage Test (BEST) in the North Dakota portion of the Williston Basin. Injection activities increased the BHPs at the injection wells by around 0.70 MPa (~100 psi) during the operation period. Extraction activities demonstrated the capability to decrease the BHPs at the injection wells by approximately 0.21–0.34 MPa (30–50 psi) depending on the ratio of the extraction and injection well flow rates (the “extraction ratio” – a normalization procedure used in the analysis). The pressure reduction provided by the extraction well equated to 30%–50% of the pressure buildup at the injection well. Furthermore, this work shows how ML analytics can play a key role in estimating reservoir pressure responses for complex injection and extraction activities during pressure management practices of CCS projects.

58 GEOSCIENCES↗

Application of Electromagnetic Methods for Reservoir Monitoring with Emphasis on Carbon Capture, Utilization, and Storage

The Controlled-Source ElectroMagnetic (CSEM) method provides crucial information about reservoir fluids and their spatial distribution. Carbon dioxide (CO2) storage, enhanced oil recovery (EOR), geothermal exploration, and lithium exploration are ideal applications for the CSEM method. The versatility of CSEM permits its customization to specific reservoir objectives by selecting the appropriate components of a multi-component system. To effectively tailor the CSEM approach, it is essential to determine whether the primary target reservoir is resistive or conductive. This task is relatively straightforward in CO2 monitoring, where the injected fluid is resistive. However, for scenarios involving brine-saturated (water-wet) or oil-wet (carbon capture, utilization, and storage—CCUS) reservoirs, consideration must also be given to conductive reservoir components. The optimization of data acquisition before the survey involves analyzing target parameters and the sensitivity of multi-component CSEM. This optimization process typically includes on-site noise measurements and 3D anisotropic modeling. Based on our experience, subsequent surveys tend to proceed smoothly, yielding robust measurements that align with scientific objectives. Other critical aspects to be considered are using magnetotelluric (MT) measurements to define the overall background resistivities and integrating real-time quality assurance during data acquisition with 3D modeling. This integration allows the fine tuning of acquisition parameters such as acquisition time and necessary repeats. As a result, data can be examined in real-time to assess subsurface information content while the acquisition is ongoing. Consequently, high-quality data sets are usually obtained for subsequent processing and initial interpretation with minimal user intervention. The implementation of sensitivity analysis during the inversion process plays a pivotal role in ensuring that the acquired data accurately respond to the target reservoirs’ expected depth range. To elucidate these concepts, we present an illustrative example from a CO2 storage site in North Dakota, USA, wherein the long-offset transient electromagnetic method (LOTEM), a variation of the CSEM method, and the MT method were utilized. This example showcases how surface measurements attain appropriately upscaled log-scale sensitivity. Furthermore, the sensitivity of the CSEM and MT methods was examined in other case histories, where the target reservoirs exhibited conductive properties, such as those encountered in enhanced oil recovery (EOR), geothermal, and lithium exploration applications. The same equipment specifications were utilized for CSEM and MT surveys across all case studies.

Barajas-Olalde, César↗

2D Seismic Surveys as an Alternative for CO 2 Monitoring in the North Dakota CarbonSAFE Project

Conference presentation for International Meeting for Applied Geoscience & Energy (IMAGE), Houston, TX, August 28 – September 1, 2023. As part of the North Dakota CarbonSAFE project, seismic, controlled-source electromagnetic, and microgravity baseline monitoring surveys were collected to assess the safe, permanent, commercial-scale geologic storage of CO 2 generated by the Milton R. Young coal-fired power plant. Data from five 2D seismic lines were assessed as an alternative to 3D seismic for CO 2 monitoring. 2D and 3D surveys were compared using wave equation-based (WEB)-AVO inversion. The encouraging WEB-AVO results demonstrated that 2D surveys could be included in CO 2 monitoring programs as a cost-effective method.

20 FOSSIL-FUELED POWER PLANTS↗

On the Feasibility of Geophysical Methods for CO 2 Monitoring in the North Dakota CarbonSAFE Project

Conference presentation at American Institute of Chemical Engineers (AIChE) Annual Meeting, Phoenix, AZ, November 13–18, 2022. An analysis of rock physics crossplots and diagnostic models suggests that the baseline seismic data may be sensitive to changes in lithology and porosity of the Broom Creek Formation and that these changes may be detectable by prestack seismic inversion.

20 FOSSIL-FUELED POWER PLANTS↗

Toward CO 2 Multimeasurement Geophysical Monitoring in the North Dakota CarbonSAFE Project

Paper presented at 16th International Conference on Greenhouse Gas Control Technologies (GHGT-16), October 23–27, 2022, Lyon, France. Overcoming data acquisition challenges associated with a lake in the study area, electrical infrastructure around the plant, noise from mine activities, complex near-surface conditions associated with reclaimed mine land, high wind speed, and extremely cold temperatures, data processing, modeling, and inversion of the baseline geophysical data demonstrated the importance of high-quality data for a CO 2 geophysical monitoring program. Implementing more advanced data acquisition and processing techniques in future monitoring surveys can further improve confidence in interpretations of geophysical survey data.

20 FOSSIL-FUELED POWER PLANTS↗

On the Quantitative CO 2 Subsurface Monitoring: Rock Physics for CO 2 Storage and CO 2 EOR

Paper presented at 16th International Conference on Greenhouse Gas Control Technologies (GHGT-16), October 23–27, 2022, Lyon, France. Rock physics is key to understanding the feasibility of monitoring and the actual monitoring of the location and volume of CO 2 in the subsurface. Examples from the Broom Creek Formation of the Williston Basin in North Dakota and the Muddy Formation of the Powder River Basin in Montana and Wyoming are used to show the effect of geology and injection of CO 2 on the velocity and density of reservoir rocks.

20 FOSSIL-FUELED POWER PLANTS↗

Quality Analysis of Baseline Time-Lapse CSEM Data CarbonSAFE Project, North Dakota

Conference presentation at International Meeting for Applied Geoscience & Energy (IMAGE), Houston, TX, August 28 – September 2, 2022. When a series of time-lapse CSEM surveys are designed to measure the often-small variations in signal seen in CCUS projects, the primary concern must be collecting the highest-quality data and reducing as much noise as possible. This includes optimization during planning and feasibility, careful and consistent quality checks in the field, and transparent and repeatable postprocessing steps. We apply this practice to a baseline (prior to CO 2 injection) CSEM data set collected for a time-lapse survey in Center, North Dakota, as a part of the North Dakota CarbonSAFE project, and describe the rigorous quality control and assessment methods used, including noise removal and data validation with 1D and 3D inversion to tie results to borehole logs. The final result is an accurate and representative CSEM data set and information that stakeholders can use to inform future time-lapse survey costs and designs.

20 FOSSIL-FUELED POWER PLANTS↗

CSEM Fluid Monitoring Methodology Using Real Data Examples

Conference presentation at International Meeting for Applied Geoscience & Energy (IMAGE), Houston, Texas, August 28 – September 1, 2023. Using field data from hydrocarbon and CO 2 applications, we illustrate the importance of a workflow and adaption to the target on hand. Verifying the geophysical acquisition and processing steps with 3D modeling and checking them against a 3D anisotropic log-derived model maintains confidence in the workflow and minimizes the influence on the data. This allows us to predict data validity and to certify the data with respect to the borehole logs.

20 FOSSIL-FUELED POWER PLANTS↗

Special Issue of IJGGC: Nexus of Water and Carbon Capture and Storage

The mission of the Regional Carbon Sequestration Partnership (RCSP) Water Working Group (WWG) is to address stakeholder concerns regarding emerging carbon capture and storage (CCS) technology and potential interactions with local and regional water resources. As part of that mission, the WWG has been working with the International Journal of Greenhouse Gas Control (IJGGC) to develop a Special Issue dedicated to the nexus of water and CCS. Research papers were solicited, edited, and subsequently published in IJGGC. These articles were then submitted to IJGGC on December, 29, 2016, to be published online in a virtual special issue. The articles published in the virtual special issue build upon the research that has been published in IJGGC over the previous 4 years to complete a more comprehensive understanding of water issues associated with CCS.

54 ENVIRONMENTAL SCIENCES↗

North Dakota CarbonSAFE Baseline Microgravity Survey, Lessons Learned

Conference presentation at American Geophysical Union (AGU) Fall Meeting, New Orleans, LA and virtual, December 13–17, 2021. The team conducted a baseline microgravity survey near Minnkota Power Cooperative’s Milton R. Young power station, south of Center, North Dakota, as a part of the North Dakota CarbonSAFE (Carbon Storage Assurance Facility Enterprise) geophysical activities. The goal of this survey was to assess whether microgravity would be an appropriate technique to monitor CO 2 stored at this site.

20 FOSSIL-FUELED POWER PLANTS↗

Using Controlled-Source Electromagnetic (CSEM) for CO 2 Storage Monitoring in the North Dakota CarbonSAFE Project

Conference presentation for International Meeting for Applied Geophysics & Energy (IMAGE), September 26 – October 1, 2021, Denver, CO. Geophysical methods are key for characterizing the geologic formations to store CO 2 and monitor the injected CO 2 over time to ensure containment. In the integrated multimeasurement geophysical approach considered for this project, it is expected that the controlled-source electromagnetic (CSEM) method is a strong contributor to mapping the CO 2 movement. A feasibility study of the CSEM method, including 1D and 3D modeling and a field noise test, was conducted to determine its effectiveness in monitoring CO 2 in the Broom Creek and Deadwood Formations. The study results demonstrate that the CSEM method can be used for CO 2 storage monitoring in the study area.

20 FOSSIL-FUELED POWER PLANTS↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗