Search NASA⌕ Search

DOE OSTI · 2333657

Active Reservoir Management Engineering and Evaluation Summary – Brine Extraction and Storage Test Phase II Final Report – Volumes 1-3

Abstract

The Energy & Environmental Research Center (EERC) conducted a multiyear program over two phases to perform a field study of the potential efficacy of formation water extraction during carbon dioxide (CO 2 ) injection for CO 2 storage as a means of improving efficiency and/or effectiveness. Phase I was a 2-year study on potential methodologies for a field study of pressure management, culminating in site selection and experimental and site design. Phase II was a 7-year effort that involved constructing site facilities, conducting experiments, and evaluating collected field data. The experimental portion was split into two collaborative components, one for the active reservoir management (ARM) experiment and a second component to host and demonstrate potential water treatment technologies appropriate for high-saline brine at the project site. The results of the overall project are expected to benefit future saline storage projects through validation of techniques that may reduce stress on sealing formations, increase storage capacity, and reduce area of review. The following report focuses on the Phase II ARM experimental implementation and results. A second companion report summarizes the results of the high-saline brine demonstrations.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Kurz, Marc D., Zandy, Agustinus, Williamson, Cody B., Jiang, Todd, Shenk, Timothy M., Yu, Xue, Klapperich, Ryan J., Jacobson, Lonny L., Pekot, Lawrence J., Kalenze, Nicholas S., Hamling, John A., Martin, Christopher L., Stevens, Bradley G., Schod, Jamie A.. 2024-04-05. Active Reservoir Management Engineering and Evaluation Summary – Brine Extraction and Storage Test Phase II Final Report – Volumes 1-3. https://doi.org/10.2172/2333657

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Water4Energy Step-1 Band-M Ready-to-Train Samples for TVA Weeks-to-Years Prediction, Version 0

AI-ready Band-M (monthly) labelled training pack for the Water4Energy Genesis Task-1 project on weeks-to-years prediction of Tennessee Valley temperature and precipitation. The deposit includes leakage-aware issue-time samples (samples_M_v0.nc; N=486), train-only scalers, issue-time split table, supporting monthly panels, and Python generation scripts to recreate the pack from the companion Tier-1 raw observation collection (https://doi.org/10.13139/ORNLNCCS/3398576). Each sample pairs a 12-month lookback of teleconnection indices and SST box anomalies with TVA-mean ERA5 anomaly targets (t2m, tp, msl) at leads 1–3 months.

54 ENVIRONMENTAL SCIENCES↗

Multi-Angle Snowflake Camera, particle analysis

The c1 level data product for the Mutli-Angle Snowflake Camera contains snowflake fall speeds and particle size, among other analysis for images associated with each hydrometeor.

54 ENVIRONMENTAL SCIENCES↗

Multi-Angle Snowflake Camera, time bins

The c1 level data product for the Mutli-Angle Snowflake Camera contains snowflake fall speeds and particle size, among other analysis for images associated with each hydrometeor.

54 ENVIRONMENTAL SCIENCES↗