Search NASA⌕ Search

Engineering topics

Koonce, Tony

Publications and source records attributed to Koonce, Tony.

Bayesian Inference in Risk Assessment (P-102)

This report includes the following sections: Section 1: Course Topics •Section 2: Review of Basic Probability Calculations •Section 3: Introduction to Bayesian Inference •Section 4: Introduction to Monte Carlo Sampling •Section 5: Uncertainty Propagation in Risk Assessment

97 MATHEMATICS AND COMPUTING↗

Advanced Small Modular Reactors: Prototype Development Capabilities of 3D Spatial Interactions and Failures During Scenario Simulation

Computers have been used for 3D modeling and simulation, but only recently have computational resources been able to give realistic results in a reasonable time frame for large complex models. This report addressed the methods, techniques, and resources used to develop a prototype for using 3D modeling and simulation engine to improve risk analysis and evaluate reactor structures and components for a given scenario. The simulations done for this evaluation were focused on external events, specifically tsunami floods, for a hypothetical nuclear power facility on a coastline.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Case Study for Enhanced Accident Tolerance Design Changes

The ability to better characterize and quantify safety margin is important to improved decision making about Light Water Reactor (LWR) design, operation, and plant life extension. A systematic approach to characterization of safety margins and the subsequent margin management options represents a vital input to the licensee and regulatory analysis and decision making that will be involved. In addition, as research and development in the LWR Sustainability (LWRS) Program and other collaborative efforts yield new data, sensors, and improved scientific understanding of physical processes that govern the aging and degradation of plant systems, structures, and components (SSCs) needs and opportunities to better optimize plant safety and performance will become known. To support decision making related to economics, reliability, and safety, the Risk Informed Safety Margin Characterization (RISMC) Pathway provides methods and tools that enable mitigation options known as risk informed margins management (RIMM) strategies.

97 MATHEMATICS AND COMPUTING↗

Fire Protection Significance Determination Process (SDP) P-108

This report includes the following outline of the course presented: Day 1: –Module 1: Introduction to Fire SDP Philosophy and Example Problem –Module 2: Concepts, Terminology, and Fire Scenario Introduction –Module 3: Process Overview •A quick trip through Phases 1 and 2 •Day 2: –Module 4: Phase 1 Details –Module 5: Phase 2 Details •Day 3: –Module 5: Phase 2 Details (continued) –Module 6: Special Topics •Module 6A – High Energy Arcing Faults in Electrical Distribution and Switching Equipment •Module 6B – Cable Tray Fires •Module 6C – Reverse Engineering The Hot Gas Layer •Module 6D: Flexibility –Discussion and Closing.

99 GENERAL AND MISCELLANEOUS↗