Search NASA⌕ Search

Engineering topics

Lawson, Susan W.

Publications and source records attributed to Lawson, Susan W..

Safety Requirement Management System (SRMS) - Improved Documented Safety Analyses Implementation - 18476

Savannah River Remediation (SRR) developed a new software application, Safety Requirement Management System (SRMS), to improve Documented Safety Analysis (DSA) safety requirement implementation in the Savannah River Site's Liquid Waste facilities. Technical Safety Requirement (TSR) Limited Conditions of Operations (LCOs) and related surveillances were previously tracked using four different applications. Due to their differences and their age, the applications introduced a number of operational challenges and vulnerabilities, including outdated platforms, usage demands beyond original design, and different organizational work processes. SRMS was developed to resolve these issues by using a single web-based approach that provides consistency, wider accessibility, simpler maintenance, and a platform for additional functionality. Other SRS facilities are evaluating the application for its applicability as a standard practice across the site. The new SRMS application decreased the administrative overhead for application maintenance, provided the needed TSR change management functionality, and reduced error precursors with the following advantages: - Consistent process/application across all SRR facilities - More efficient way to track and communicate compliance with DSA time-related requirements (i.e., TSR LCOs and surveillances). - Web-based search capability for LCO entries/exits and a record of surveillance performances. - TSR change management and independent reviews through electronic approvals. For example, the application provides the ability to bundle and stage LCO and surveillance changes associated with a TSR revision. The approval process involves multiple roles from the facility to ensure validity. - Formal configuration management program, fully supported by software life cycle documents. SRMS was implemented at Defense Waste Processing Facility (DWPF) in June 2017, with implementation in all Liquid Waste facilities expected by the end of 2017. Next, SRR plans to expand SRMS functionality to include a linking document database (LDD) to support the DSA requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Minimizing Error Potential Using Computer Applications - 18498

Many Savannah River Site (SRS) liquid waste facility operations depend upon repetitive engineering calculations and operator actions. Although these calculations and actions are formalized in technical reports and paper procedures, they can still be vulnerable to data entry errors, calculation errors, equipment alignment errors, and occasional changes caused by different people performing these activities. Savannah River Remediation (SRR) is using computer automation to reduce these error precursors by standardizing repetitive calculations and by performing plant alignment checks for repetitive operation processes. Data entry can be automated, calculation methodologies can be standardized, and computers can check to see that predefined plant conditions exist before equipment operation. In addition to improving quality, the time required for these activities to generate technical reports, to perform independent reviews, and to perform equipment alignment checks can be significantly reduced. In the case of operator-performed calculations, error precursors involve distractions that can occur over a multi-page paper procedure, confusing displays and controls from equipment, mathematical errors, complacency, and unfamiliarity with the procedure among many others. Repetitive engineering calculations suffer from similar error precursors and are often compounded by high workloads, lack of proficiency, lack of standard methodology, mental shortcuts, and biases. Web-based computer applications can eliminate many of these precursors through standardization. Calculation methods are fixed, inputs are fixed, and computer checks can highlight potentially wrong inputs and outputs. Automated calculations are performed almost instantaneously once input is provided. Operators and engineers can spend more time focusing on the results than on the process to achieve the results. Similarly, when operators use repetitive procedures involving equipment manipulation, the same error precursors apply. Automated operation sequences and equipment checks can be programmed into the distributed control system to provide standard operating processes that reduce and eliminate error precursors. This paper describes how SRR incorporates Human Performance Improvement (HPI) principles when automating calculations and operation processes. Computer applications will be reviewed in detail, highlighting the software development life-cycle that includes requirements gathering, prototyping, design, development, testing, and implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗