Search NASA⌕ Search

Engineering topics

Maheras, Steven

Publications and source records attributed to Maheras, Steven.

Package Performance Study: A Historical Perspective and Planning for a Path Forward

The topic of spent nuclear fuel (SNF) transportation often draws public attention and concerns regarding safety, and with large-scale shipping campaigns expected in the future, public interest is anticipated to substantially increase. In 1999, the U.S. Nuclear Regulatory Commission (NRC) began an initiative called the Package Performance Study (PPS) that initially focused on SNF transportation cask responses to severe transportation accidents. A public participation approach was to be used to help guide the scope and parameters of the study, which was also to consider using full-scale physical testing of a SNF transportation cask, where appropriate. In 2010, the NRC decided not to go forward with physical testing as proposed. In 2006, the National Academy of Sciences (NAS) conducted a study on SNF and high-level radioactive waste transportation in the United States. The NAS study recommended that full-scale cask testing, as well as other accepted methodologies, continue to be used as part of the package performance evaluation. In 2012, the Blue Ribbon Commission on America’s Nuclear Future (BRC) recommended conducting the PPS with a full-scale rail transportation cask for the purpose of building public trust and confidence in the safety of SNF transport. In 2021, the U.S. Department of Energy (DOE) restarted a consent-based siting process, focusing on how to site federal facilities for the interim consolidated storage of SNF using a consent-based approach. Large-scale SNF transportation would be necessary for any such interim storage facility. As the planning activities begin for future large-scale shipping campaigns, the DOE is considering options for conducting a DOE-led PPS to help build public trust and confidence in the transportation of SNF. Therefore, the DOE is gathering information related to the previous NRC-led PPS efforts, as well as applicable international experience with the testing of SNF packages. This paper discusses previous NRC efforts, as well as the current status of a DOE-led PPS, which is in the early planning stages.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Verification and Validation of START: A Spent Nuclear Fuel Routing and Decision Support Tool

This is a technical presentation that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Update to Transportation Analysis for the Waste Isolation Pilot Plant

The goal of this transportation analysis (TA) is to update the 2008 TA in order to evaluate the impacts associated with the transportation of transuranic (TRU) waste from waste generator sites to the Waste Isolation Pilot Plant (WIPP) facility and from waste generator sites to the Idaho National Laboratory (INL).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing SNF from Nuclear Power Plant Sites - Pilgrim Site Visit - 20048

The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM)a conducted an evaluation of removing spent nuclear fuel (SNF) from the Pilgrim site on November 4-8, 2019. The Pilgrim site is located on the western shore of Cape Cod Bay in the Town of Plymouth, Massachusetts, about 61 km southeast of Boston and 71 km east of Providence, Rhode Island. Participants in the site visit included the U.S. Department of Energy, Oak Ridge National Laboratory, Pacific Northwest National Laboratory, the state of Massachusetts, the Federal Railroad Administration, the U.S. Coast Guard, the U.S. Army Corps of Engineers, the Mashpee Wampanoag Tribe, the Consolidated Group of Tribes and Organizations, the Council of State Governments-Eastern Regional Conference, the Pilgrim Nuclear Decommissioning Citizens Advisory Panel, and the Massachusetts Coastal Railroad. The Pilgrim site was found to have two transportation mode options for the removal of SNF, offsite rail access and onsite barge access. Two offsite heavy haul truck to rail transload locations were evaluated, one in Middleborough, Massachusetts, about 35-47 km from the Pilgrim site, and a second location in Middleborough about 36-43 km from the Pilgrim site. A passenger railroad terminates in Plymouth, Massachusetts, about 11 km from the Pilgrim site; however, this location is not suitable for freight rail involving large SNF transportation casks. There is also an onsite barge facility located on the Pilgrim site that was used during construction and would require refurbishment to be used. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Planning for Nuclear Power Plant Site Visits - 20481

The U.5. Department of Energy Office of Integrated Waste Management (DOE-IWM) is planning for future large-scale transport of commercial spent nuclear fuel (SNF) and high-level radioactive waste (HLW) to eventual disposal and/or storage facilities. As part of its planning efforts, DOE conducts evaluations of removing SNF from nuclear power plant sites. Site visits are a pivotal piece in the site evaluations that are conducted by DOE, and significant planning efforts are undertaken to design and implement site visits. Site visits typically include three days of surveys and meetings, including one day each for the nuclear power plant site visit, evaluating near-site transportation infrastructure, and meeting with community engagement panels or advisory boards. This paper outlines DOE-IWM's planning process for conducting nuclear power plant site visits and summarizes the key activities carried out to prepare for a site visit, including a discussion of the background research conducted prior to a site visit. Additionally, the paper describes the development of reference databases for site visits, the identification of unique site characteristics, and the use of geographic information system (GIS) applications to enhance the quality of the information collected during a site visit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Perspectives on Previous DOE Transportation Acquisition Efforts - 19049

The Department of Energy (DOE) is planning for future large-scale transport of commercial Spent Nuclear Fuel (SNF) and High-Level Radioactive Waste (HLW) to eventual disposal and/or storage facilities. Various options for procuring transportation services are being evaluated. To inform this work, a review of past comments received on DOE transportation acquisition activities in the early 1990's through 2016 was conducted. Through the course of data collection, staff analyzed comments submitted from ten DOE initiatives from DoE's Office of Civilian Radioactive Waste Management (OCRWM) and DoE's Office of Nuclear Energy (DOE-NE). This paper summarizes and outlines key themes arising from these comments. Past issues identified by a wide variety of commenters (nuclear industry and cask vendors, nuclear utilities and purchasers, states, Tribes, local governments, rail carriers, nongovernmental organizations, trade organizations, engineering firms, and members of the public) were examined. These issues concerned DoE's activities to make maximum use of the private sector to transport and store SNF and HLW. The key themes analyzed include: Uniqueness of the Shipping Campaign, Views on Privatization, Industry Risk and Privatization, Unclear Roles and Responsibilities, and Responsibilities Recommended for DOE to Maintain. This paper concludes by discussing lessons that can be learned from analyzing these public comments and what that may mean moving forward in the U.S. radioactive waste management program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Execution Strategy Analysis (ESA) Origin Sites Readiness Model - 19073

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The DOE Office of Nuclear Energy (DOE-NE) Office of Spent Fuel and Waste Disposition (SFWD) Integrated Waste Management System (IWMS) program is developing an Execution Strategy Analysis (ESA) Origin Sites Readiness Model using the Goldsim{sup TM} software application to provide information on potential future approaches for removing SNF and HLW from origin sites such as commercial nuclear power plant sites. The purpose of this ESA model is to apply integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. The ESA Origin Sites Readiness Model is a dynamic simulation modeling capability. It is developed for use in the analysis and comparison of potential future implementation strategies associated with an integrated nuclear waste management program. The model is designed to be independent of the destination of the SNF or HLW so the results from the Origin Sites Readiness Model are equally applicable to a wide range of scenarios involving shipments to generic destinations in an integrated waste management system. The model explicitly takes significant assumptions, uncertainties, and risks into account. Currently, the ESA Origin Sites Readiness Model includes 14 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Vermont Yankee, La Crosse, Big Rock Point, Zion, Kewaunee, Fort Calhoun, Trojan, Rancho Seco, Humboldt Bay, San Onofre, and Crystal River) and is designed to be modular so that other sites can be added in the future. The model also includes multiple transportation modes (heavy haul truck, rail, and barge), activities related to the acquisition of transportation assets such as railcars and transportation casks, and site-specific considerations of on-site and near-site transportation infrastructure. The model was developed using the ESA process with Subject Matter Experts (SME); it incorporates uncertainty and risks and provides a structured, systematic methodology for evaluating potential SNF campaign scenarios. The model also complements other system-level logistics tools being developed by SFWD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing Spent Nuclear Fuel from Shutdown Nuclear Power Plant Sites - 2018 - 19101

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM) continues to conduct evaluations of removing spent nuclear fuel (SNF) from shutdown nuclear power plant sites. The 14 shutdown sites included in the evaluation to date have nuclear power reactors that have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The 14 shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The Oyster Creek Nuclear Generating Station ceased operations in September 2018 and will be included in future evaluations. The evaluations of the shutdown sites contain four components: - A characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory; - A description of the on-site infrastructure at the shutdown sites; - An evaluation of the near-site transportation infrastructure and experience at the shutdown sites - An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF were the DOE GC-859 and RW-859 spent nuclear fuel inventory databases. This inventory has been augmented with data obtained from the shutdown sites for SNF discharges that occurred after June 2013. The primary sources for information on the conditions of site and near-site transportation infrastructure and experience included field observations and information collected during visits to the 14 shutdown sites, information provided by managers and staff at the shutdown sites, and Google Earth imagery. Extensive photographs taken during the shutdown site visits have proven to be particularly useful in documenting the current conditions at and near the shutdown sites. Tribal and state representatives, State and Regional Group representatives, and Federal Railroad Administration representatives have participated in 11 of the shutdown site visits. In addition to visiting the shutdown site, site visits often include activities such as meeting with local railroads to discuss the near-site railroad infrastructure and meeting with community engagement panels. Oyster Creek permanently ceased power operations on September 17, 2018 and fuel was removed from the reactor vessel on September 25, 2018. Planning for the Oyster Creek site visit has begun and is conducted in three stages. In the first stage, data and documents that are applicable to Oyster Creek are collected. In the second stage, questions are developed based on the data and documents collected during the first stage. These questions are submitted to the Oyster Creek site approximately one month before the site visit. The third stage involves establishing specific schedules and participants. Participants will likely include tribal and state representatives, the Council of State Governments - Eastern Regional Conference, and the Federal Railroad Administration. State participation will likely include a representative of the State Rail Safety Participation Program, the New Jersey Department of Transportation, and the New Jersey Bureau of Nuclear Engineering. The site visit is tentatively expected to occur in April or May of 2019. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

External Engagement During Evaluations of Shutdown Nuclear Power Plant Sites - 19221

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM) continues to conduct evaluations of removing spent nuclear fuel (SNF) from shutdown nuclear power plant sites. The 14 shutdown sites included in the evaluation to date have nuclear power reactors that have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The 14 shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The Oyster Creek Nuclear Generating Station ceased operations in September 2018 and will be included in future evaluations. A key part of the shutdown site evaluations are visits to the sites. These site visits typically take place over 3 days. The first day is spent at the nuclear power plant site. The second day is spent evaluating the near-site transportation infrastructure, including rail infrastructure, potential heavy-haul routes, and potential rail and barge transload locations. The third day is often spent meeting with community engagement or advisory panels. External engagement activities during site visits are conducted in two areas. The first area involves inviting tribal and state representatives, State Regional Group (SRG) representatives, and Federal Railroad Administration (FRA) representatives to participate in the entire site visit. The SRG representatives are from the Southern States Energy Board, the Western Interstate Energy Board, the Council of State Governments - Midwest, or the Council of State Governments - Eastern Regional Conference, according to the location of the nuclear power plant. State representatives typically represent their state department of energy, state department of environmental or natural resources, State Rail Safety Participation Program, state police, state department of transportation, radiation protection organization, or emergency management organization. Tribal representatives explore issues associated with cultural affiliation and tribal involvement with past and present site activities. As the regulator of the U.S. railroads, the FRA representatives bring unique experience to the site visits. They also coordinate meetings with the railroads that serve the shutdown sites. The second area of external engagement activities during site visits involves meeting with local community engagement or advisory panels. Meeting with local community engagement or advisory panels provides an opportunity to inform these panels on DOE activities and the roles and responsibilities of federal agencies during site decommissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing Spent Nuclear Fuel From Shutdown Sites - Fort Calhoun Site Visit - 18048

This is a technical paper that does not take into account contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. An updated evaluation of removing spent nuclear fuel (SNF) from 14 shutdown nuclear power plant sites was conducted during 2017. The major update since 2016 was the addition of the recently shutdown Fort Calhoun site to the evaluation. The Fort Calhoun site is located on the western shore of the Missouri River in Washington County in eastern Nebraska, about 31 km north of Omaha, Nebraska. Fort Calhoun has been shut down since October 24, 2016 and final removal of SNF from the reactor vessel was completed on November 13, 2016. The site visit to Fort Calhoun occurred in May 2017 and involved meetings with the Fort Calhoun staff and the Union Pacific Railroad. Participants in the site visit included the Federal Railroad Administration, Pahrump Paiute Tribe, Prairie Island Indian Community, Nebraska State Patrol, Nebraska Department of Health and Human Services, Iowa Department of Transportation Office of Rail Transportation, Iowa Department of Transportation Office of Motor Vehicle Enforcement, and the Council of State Governments-Midwest. The Fort Calhoun site was found to have two transportation mode options for the removal of SNF, rail and barge. In the case of rail, an onsite rail spur could be reinstalled from the existing Cargill industrial spur that runs through the Fort Calhoun site, or an onsite trans-load onto the Cargill industrial spur could be performed. In 2006, a barge was used to ship steam generators, a pressurizer, and a reactor vessel head to the Fort Calhoun site; consequently, barge transport of SNF offsite is potentially an option. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites - 2016 Update - 17086

An updated evaluation of removing used or spent nuclear fuel (SNF)2 from 13 shutdown nuclear power reactor sites was conducted during 2016. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites included in the evaluation were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure at the shutdown sites, (3) an evaluation of the near-site transportation infrastructure and transportation experience, including identification of gaps in information, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Updates to the evaluation since 2015 include incorporating spent nuclear fuel data from the GC-859 database; updating of Google Earth imagery; incorporating revisions to transportation certificates of compliance; adding information obtained from site visits to the Pacific Sun Railroad and Camp Pendleton, California; adding rail assessments for Kewaunee, Crystal River, and San Onofre to the evaluation; and adding information obtained from the site visit to Vermont Yankee. As additional sites such as Fort Calhoun, Palisades, Clinton, Quad Cities, Pilgrim, Oyster Creek, and Diablo Canyon shut down, these sites will be included in updates to the evaluation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites - An Update - 16057

An updated preliminary evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power reactor sites was conducted. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure and conditions relevant to transportation of SNF and GTCC waste, (3) an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing SNF and GTCC waste, including identification of gaps in information, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Every site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. It is expected that additional site visits will be conducted to add to the information presented in the evaluation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laying the groundwork for a large-scale spent nuclear fuel transportation system - 15408

The US Department of Energy Office of Nuclear Energy established the Nuclear Fuels Storage and Transportation Planning Project to lay the groundwork for implementing an interim storage facility, including associated transportation activities. Efforts include the development of a system for the large-scale transport of spent nuclear fuel that will be necessary in an integrated waste management system. Progress is being made on long lead time, destination-independent aspects of the transportation infrastructure. The large-scale transportation system for spent nuclear fuel is divided into three elements: institutional, operational, and hardware. The institutional element refers to the various forms of stakeholder interaction that must occur for this type of transportation system to be successful. It includes activities like development of a national transportation plan, work on policy development for Section 180(c) of the Nuclear Waste Policy Act, and identification of a preliminary suite of national transportation routes that reflect the interests of a broad cross section of stakeholders while meeting regulatory requirements. The operational element refers to the activities that must be undertaken to run a large-scale transportation system. This element is currently focused on development of a new SNF transportation routing analysis tool, study of the infrastructure near SNF storage sites that may be de-inventoried first, and development of tools for modeling transportation activities. The hardware element refers to the casks, railcars, and other items necessary to operate the system. This element currently focuses on development of railcars compliant with Association of American Railroads Standard S-2043, as well as studies related to the use of rail casks and their ancillary equipment. The Nuclear Fuels Storage and Transportation Planning Project is making significant progress in all three of these areas along the path forward to a fully operational transportation system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary evaluation of removing used nuclear fuel from shutdown sites - 15568

A preliminary evaluation of removing spent nuclear fuel (SNF) from 12 shutdown nuclear power reactor sites was conducted. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, and San Onofre. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure and conditions relevant to transportation of SNF and GTCC waste, (3) an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing SNF and GTCC waste, including identification of gaps in information, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Every site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. It is expected that additional site visits will be conducted to add to the information presented in the evaluation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗