Search NASA⌕ Search

DOE OSTI · 1658672

Update to Transportation Analysis for the Waste Isolation Pilot Plant

Abstract

The goal of this transportation analysis (TA) is to update the 2008 TA in order to evaluate the impacts associated with the transportation of transuranic (TRU) waste from waste generator sites to the Waste Isolation Pilot Plant (WIPP) facility and from waste generator sites to the Idaho National Laboratory (INL).

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Kalinina, Elena Arkadievna, Kalan, Robert, Ammerman, Douglas J., Maheras, Steven, Farnum, Cathy Ottinger, Lujan, Lucas Alejandro. 2020-09-08. Update to Transportation Analysis for the Waste Isolation Pilot Plant. https://doi.org/10.2172/1658672

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2025

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2025. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of the DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, the evaluation of data collected in 2025 continued to indicate that WVDP activities posed no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗