Search NASA⌕ Search

Engineering topics

Malone, Collin

Publications and source records attributed to Malone, Collin.

Fusion Fuel Cycle Technology Downselection Methodology

Tritium Start-up Inventory Requirements Current consensus has full inventory coming from CANDU reactors. • Assumes continued operation through 2035, yielding ~30 kg tritium. • Produced in the form of DTO, which requires separation for tritium extraction. • ITER will take between 10-20 kg. • DEMO will require ~15 kg. • Fuel cycle design requires minimum volume to fill plumbing in system beyond inventory necessary to reach break even. • With ~45 current private ventures, need massive uptick in tritium production to meet global need.

Malone, Collin↗

Benchmarking Hydrogen Isotope Separation Efficiency of Pd/k–Packed TCAP Columns

By leveraging the large isotope effect in the palladium hydrogen isotope system, the Thermal Cycling Absorption Process (TCAP) provides an efficient and advantageous means to separate protium, deuterium, and tritium. To meet increased future tritium processing demands, such as those needed for fusion power plants, current designs of the separation columns need to be adapted and optimized using the progress made in understanding hydrogen isotope science. One key to this optimization lies in understanding the baseline performance for currently employed separation packing materials. Pd/k and molecular sieves, as commonly used for the separation of hydrogen isotopes, are herein evaluated to establish a baseline for their separation efficiency. Van Deemter plots are formulated, and the influence of each parameter is evaluated to determine areas for improvement.

Thermal Cycling Absorption Process (TCAP)↗