Search NASA⌕ Search

DOE OSTI · 2318973

Fusion Fuel Cycle Technology Downselection Methodology

Abstract

Tritium Start-up Inventory Requirements Current consensus has full inventory coming from CANDU reactors. • Assumes continued operation through 2035, yielding ~30 kg tritium. • Produced in the form of DTO, which requires separation for tritium extraction. • ITER will take between 10-20 kg. • DEMO will require ~15 kg. • Fuel cycle design requires minimum volume to fill plumbing in system beyond inventory necessary to reach break even. • With ~45 current private ventures, need massive uptick in tritium production to meet global need.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Malone, Collin, Somers, Alex. 2023-11-21. Fusion Fuel Cycle Technology Downselection Methodology. https://doi.org/10.2172/2318973. https://searchnasa.com/record/osti%3A2318973/fusion-fuel-cycle-technology-down-selection-methodology

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.