Search NASA⌕ Search

Engineering topics

Morales-Arteaga, Maria

Publications and source records attributed to Morales-Arteaga, Maria.

Savannah River National Laboratory Participation in the International Atomic Energy Agency CPC Interlaboratory Comparison Exercise 2

International Atomic Energy Agency Safeguards Analytical Services (IAEA-SGAS) oversees coordinating the second Controlled Potential Coulometry Quality Control Interlaboratory Comparison (CPC QC ILC) on behalf of the Nuclear Material Laboratory (NML). The purpose of the exercise is to: (1) verify the ability of participating laboratories to measure the Pu concentration in the sample solutions, and (2) estimate the method performance (repeatability and intermediate reproducibility). Sample shipping coordination was performed by IAEA-SGAS. The test sample is a plutonium nitrate solution (estimated molarity of 3-5 M), delivered in two PTFE screw-capped quartz ampoules. Each participating laboratory is to receive two ampoules. Each ampoule holds approximately 8 mL of solution containing approximately 10 mg Pu/g. The gross weights of the ampoules were provided. The test sample is assumed to have an iron content below the level of significance for the CPC. The isotopic composition of the plutonium test sample was provided; however, no analysis date was provided. In addition, IAEA-SGAS provided analytical instructions to participants. On September 20, 2022, SRNL received the samples sent by IAEA-SGAS.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

SRNL Coulometer for LANL - SRNL-Testing 2020 (Final Report)

SRNL fabricated two coulometers that have been delivered to LANL. All testing for electrical components is performed by R&D engineering and the results are attached to this report. Instrument testing for the first instrument was completed on August 2018 and installation at LANL was completed February 2019. This report addresses testing performed at FH Analytical Laboratory for the second instrument that arrived at LANL on June 5th, 2020. The testing is performed using Plutonium working standards. The instrument was kept in a radiologically clean area. The component calibration of the second LANL coulometer was completed in SRNL Building 723-A.

47 OTHER INSTRUMENTATION↗