SRNL Coulometer for LANL - SRNL-Testing 2020 (Final Report)
Abstract
SRNL fabricated two coulometers that have been delivered to LANL. All testing for electrical components is performed by R&D engineering and the results are attached to this report. Instrument testing for the first instrument was completed on August 2018 and installation at LANL was completed February 2019. This report addresses testing performed at FH Analytical Laboratory for the second instrument that arrived at LANL on June 5th, 2020. The testing is performed using Plutonium working standards. The instrument was kept in a radiologically clean area. The component calibration of the second LANL coulometer was completed in SRNL Building 723-A.