Cost details from front-end engineering design of piperazine with the advanced stripper

This Front-End Engineering Design (FEED) was funded by the U.S. Department of Energy (DOE) to estimate the cost to capture and compress 90% of the CO 2 from an existing natural gas combined cycle (NGCC) in Denver City, Texas, USA. The FEED used the PZAS (Piperazine with the Advanced Stripper) 2G amine scrubbing technology developed and modeled by The University of Texas at Austin. This FEED is unique in providing more public cost details than other FEEDs funded by DOE. The primary objective of the FEED was to provide a comprehensive estimate for the total installed cost of the capture plant. The estimated capital cost of NGCC at the Mustang Station is $\$727$ million for a capacity of 460 MW and 1.6 million tonnes CO 2 /yr. This includes a contingency of $\$104.6$ million and a contractor’s profit of $\$60.1$ million. The total direct field cost is $\$384.1$ million. With an optimistic fuel value of $\$3$/MMBtu, the estimated cost of capture varies from $\$85$/t at 4% IRR/85% load to $\$170$/t at 10% IRR/52% load. Air cooling is technically feasible but expensive. The air cooling systems for the water wash and pump-around intercooling account for 23.4% of the direct cost. The gas-fired boilers represent only 4% of the direct costs, but steam extraction would reduce energy cost, free up cooling water, and reduce the direct costs of processing additional flue gas and CO 2 from the boilers. The absorbers represent 9.6% of the direct cost in this FEED with no direct contact cooler and only 7.6 m of packing. Furthermore, the solvent cross exchangers are less expensive than expected (2.5% of direct costs). Doubling the number of these exchangers could reduce the heat duty from 3.0 to 2.5 GJ/t CO 2 .

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗