Search NASA⌕ Search

DOE OSTI · 1878608

Front-End Engineering Design for Piperazine with the Advanced Stripper

Abstract

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Rochelle, Gary, Closmann, Fred, Martorell, Jorge, Abreu, Miguel, Drewry, Athreya, Drewry, Benjamin, Steen, WIlliam (Bill), Farmer, Karen, Bryan, Scott, Bernau, Max, Sexton, Andrew, Dombrowski, Katherine, Myers, Duane, Marsh, Michael, Piggott, Brad, Jones, Rosalind, Lee, Jeff. 2022-07-29. Front-End Engineering Design for Piperazine with the Advanced Stripper. https://doi.org/10.2172/1878608

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Green Era Anaerobic Digester

Green Era Educational NFP constructed and commissioned the Green Era Renewable Energy & Urban Farming Campus in Chicago’s Auburn Gresham neighborhood. The project transformed a long-vacant brownfield site into a commercial-scale anaerobic digestion facility that converts food waste into renewable natural gas and nutrient-rich material for agricultural use. The facility can process up to 80,000 wet tons of food waste annually and supports approximately 15 permanent jobs while advancing food waste diversion, renewable energy production, nutrient recovery and community revitalization.

03 NATURAL GAS↗

Circumventing thermodynamic limitations in converting carbon dioxide into carbon nanotubes via tandem catalysis

Carbon nanotubes (CNTs) are important materials for electronics and structural composites, but their production still relies on hydrocarbon-based chemical vapor deposition, an energy-intensive and fossil-dependent process, limited by rapid catalyst deactivation. Using CO2 as a carbon feedstock offers a sustainable route for CNT synthesis, yet direct CO2 conversion to CNTs is thermodynamically unfavorable and existing CO2-to-carbon pathways mainly yield amorphous or weakly graphitized solids. Here, we demonstrate a tandem electrochemical–thermochemical (EC-TC) strategy that overcomes these limitations. CO2 is first electrochemically reduced to a tunable mixture of C2H4 and CO, which is directly fed into a thermochemical reactor and converted into CNTs with controllable morphology and high CNT-to-metal mass ratios (~200) over NiFe catalysts at 750 °C. In situ synchrotron-based characterization and density functional theory calculations reveal that CO dissociation and C2H4 decomposition on NiFe alloys cooperatively promote CNT nucleation and sustained growth. This EC-TC strategy establishes a modular route for converting CO2 into value-added carbon nanomaterials.

03 NATURAL GAS↗

Coordinated Natural Gas and Electric Planning: Case Studies of Current Approaches and Practices

This paper examines how natural gas and electric utilities across eight U.S. states and two Canadian provinces are beginning to coordinate historically separate planning processes in response to growing system interdependencies, policy mandates, aging infrastructure, and changing customer energy choices. Electricity planning has long relied on robust integrated resource planning frameworks that weigh numerous objectives, risks, and costs. Natural gas planning, on the other hand, is typically less transparent and more narrowly focused on safety and system integrity. As economic, reliability, and policy drivers place new and shared demands on both systems, jurisdictions and utilities are experimenting with approaches such as coordinated forecasting, non pipeline alternatives, and combined planning pilots. A few have issued regulatory or statutory directives for greater data sharing and methodological alignment. Case studies from British Columbia, California, Colorado, Illinois, Massachusetts, Minnesota, New York, Québec, Rhode Island, and Washington illustrate a wide range of approaches to rethinking siloed planning. The paper identifies several common themes across the jurisdictions examined. It provides observations on the methods, processes, and organizational steps that may be needed in the future to address the challenges being faced by states and utilities. Lastly, it identifies some initial steps that states and utilities can consider if they would like to pursue more integrated, cost-effective, policy-aligned energy system planning.

03 NATURAL GAS↗