Search NASA⌕ Search

Engineering topics

Ramos, D.

Publications and source records attributed to Ramos, D..

AUP First Pre-Series Cryo-Assembly Design Production and Test Overview

New high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) have been built and tested as part of the high-luminosity upgrade of the Large Hadron Collider (HL-LHC). These new quadrupole magnets are based on Nb3Sn superconducting technology. The US Accelerator Upgrade Project (US-AUP) is producing the Q1 and Q3 Cryo-Assemblies: a pair of ~5 m long magnet structures installed in a stainless-steel helium vessel (Cold Mass) and surrounded by cryostat shields, piping, and a vacuum vessel. In conclusion, this paper gives an overview of the design, production, and the results of the horizontal test of the first pre-series Q1/Q3 Cryo-Assembly.

43 PARTICLE ACCELERATORS↗

High-Precision Spectroscopy of 20 O Benchmarking Ab Initio Calculations in Light Nuclei

The excited states of unstable 20 O were investigated via γ-ray spectroscopy following the 19 O(d, p) ⁢20 O reaction at 8 A⁢ MeV. By exploiting the Doppler shift attenuation method, the lifetimes of the $2^+_2$ and $3^+_1$ states were firmly established. From the γ-ray branching and E⁢2/M⁢1 mixing ratios for transitions deexciting the $2^+_2$ and $3^+_1$ states, the B⁡(E⁢2) and B⁡(M⁢1) were determined. Various chiral effective field theory Hamiltonians, describing the nuclear properties beyond ground states, along with a standard USDB interaction, were compared with the experimentally obtained data. Such a comparison for a large set of γ-ray transition probabilities with the valence space in medium similarity renormalization group ab initio calculations was performed for the first time in a nucleus far from stability. It was shown that the ab initio approaches using chiral effective field theory forces are challenged by detailed high-precision spectroscopic properties of nuclei. Finally, the reduced transition probabilities were found to be a very constraining test of the performance of the ab initio models.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

AUP first Pre-Series Cold Mass Installation into the Cryostat

For the HiLumi LHC Upgrade (HL-LHC), new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP), ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested, and delivered to CERN. The first LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during fall 2022 and spring/summer 2023, respectively. This paper summarizes the assembly process and experience of the first LQXFA Cryostat Assembly at FNAL.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

AUP first Pre-series Cold Mass Installation into the Cryostat

For the Hi-Lumi LHC Upgrade (HL-LHC) new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP) ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested and delivered to CERN. The first of the LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during the fall of 2022 and spring 2023. We will present the integration work of the Cold Mass assembly into the Cryostat Kit provided by CERN. Each Cold Mass contains two trained MQXFA magnets of ~ 5 m length installed in a stainless-steel helium pressure vessel. The Cold Mass will be surrounded by cryostat shields, piping, and vacuum vessel. We will discuss the metrology survey results and present the LQXFA measurements prior testing at the Fermilab Magnet Test facility and lessons learned.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

RPC background studies at CMS experiment

During Run2 the high instantaneous luminosity, up to 2.2 · 10 34 cm -2 s -1 , lead to a substantial hit rate in the Compact Muon Solenoid experiment’s muon chambers due to multiple background sources to physics processes sought for at LHC. In this article we will describe the analysis method devised to measure and identify the contributions to such background in the Resistive Plate Chambers. Thorough understanding of the background rates provides the base for the upgrade of the muon detectors for the High-Luminosity LHC.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The CMS RPC system readiness for LHC Run-3 data taking

During Run-3, the LHC is preparing to deliver instantaneous luminosity in the range from 5 × 10 34 cm -2 s -1 to 7.5 × 10 34 cm -2 s -1 . To ensure stable data taking, providing redundant information for robust muon triggering, reconstruction and identification, the CMS RPC collaboration has used the opportunity given by the LHC long shutdown 2 (LS2), to perform a series of maintenance and preparation activities for the new data taking period. The overall performance of the RPC system after the LS2 commissioning period and the activities in preparation for future data taking will be presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

RPC based tracking system at CERN GIF++ facility

With the HL-LHC upgrade of the LHC machine, an increase of the instantaneous luminosity by a factor of five is expected and the current detection systems need to be validated for such working conditions to ensure stable data taking. At the CERN Gamma Irradiation Facility (GIF++) many muon detectors undergo such studies, but the high gamma background can pose a challenge to the muon trigger system which is exposed to many fake hits from the gamma background. A tracking system using RPCs is implemented to clean the fake hits, taking profit of the high muon efficiency of these chambers. This work will present the tracking system configuration, used detector analysis algorithm and results.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

New narrow resonances observed in the unbound nucleus F 15

The structure of the unbound 15 F nucleus is investigated using the inverse kinematics resonant scattering of a radioactive 14 O beam impinging on a CH 2 target. The analysis of 1 H( 14 O,p) 14 O and 1 H( 14 O,2p) 13 N reactions allowed the confirmation of the previously observed narrow 1/2 - resonance, near the two-proton decay threshold, and the identification of two new narrow 5/2 - and 3/2 - resonances. The newly observed levels decay by 1p emission to the ground of 14 O, and by sequential 2p emission to the ground state (g.s.) of 13 N via the 1 - resonance of 14 O. Gamow shell model (GSM) analysis of the experimental data suggests that the wave functions of the 5/2 - and 3/2 - resonances may be collectivized by the continuum coupling to nearby 2p- and 1p- decay channels. Finally, the observed excitation function 1 H( 14 O, p) 14 O and resonance spectrum in 15 F are well reproduced in the unified framework of the GSM.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

11 T Dipole for the Dispersion Suppressor Collimators

Chapter 11 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community of about 7,000 scientists working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will need a major upgrade in the 2020s. This will increase its luminosity (rate of collisions) by a factor of five beyond the original design value and the integrated luminosity (total collisions created) by a factor ten. The LHC is already a highly complex and exquisitely optimised machine so this upgrade must be carefully conceived and will require about ten years to implement. The new configuration, known as High Luminosity LHC (HL-LHC), will rely on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11-12 tesla superconducting magnets, compact superconducting cavities for beam rotation with ultra-precise phase control, new technology and physical processes for beam collimation and 300 metre-long high-power superconducting links with negligible energy dissipation. The present document describes the technologies and components that will be used to realise the project and is intended to serve as the basis for the detailed engineering design of HL-LHC.

43 PARTICLE ACCELERATORS↗

New experimental approaches to investigate the fission dynamics

The first ever achieved full identification of both fission fragments, in atomic and mass number, made it possible to define new observables sensitive to the fission dynamics along the fission path up to the scission point. Moreover, proton-induced fission of {sup 208}Pb at high energies offers optimal conditions for the investigation of dissipative, and transient effects, because of the high-excitation energy of the fissioning nuclei, its low angular momentum, and limited shape distortion by the reaction. In this work we show that the charge distribution of the final fission fragments can constrain the ground-to-saddle dynamics while the mass distribution is sensitive to the dynamics until the scission point.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

The 11 T dipole for HL-LHC: Status and plan

The upgrade of the Large Hadron Collider (LHC) collimation system includes additional collimators in the LHC lattice. The longitudinal space for these collimators will be created by replacing some of the LHC main dipoles with shorter but stronger dipoles compatible with the LHC lattice and main systems. The project plan comprises the construction of two cryoassemblies containing each of the two 11-T dipoles of 5.5-m length for possible installation on either side of interaction point 2 of LHC in the years 2018-2019 for ion operation, and the installation of two cryoassemblies on either side of interaction point 7 of LHC in the years 2023-2024 for proton operation. The development program conducted in conjunction between the Fermilab and CERN magnet groups is progressing well. The development activities carried out on the side of Fermilab were concluded in the middle of 2015 with the fabrication and test of a 1-m-long two-in-one model and those on the CERN side are ramping up with the construction of 2-m-long models and the preparation of the tooling for the fabrication of the first full-length prototype. The engineering design of the cryomagnet is well advanced, including the definition of the various interfaces, e.g., with the collimator, powering, protection, and vacuum systems. Several practice coils of 5.5-m length have been already fabricated. This paper describes the overall progress of the project, the final design of the cryomagnet, and the performance of the most recent models. Furthermore, the overall plan toward the fabrication of the series magnets for the two phases of the upgrade of the LHC collimation system is also presented.

43 PARTICLE ACCELERATORS↗

New vertical cryostat for the high field superconducting magnet test station at CERN

In the framework of the R and D program for new superconducting magnets for the Large Hadron Collider accelerator upgrades, CERN is building a new vertical test station to test high field superconducting magnets of unprecedented large size. This facility will allow testing of magnets by vertical insertion in a pressurized liquid helium bath, cooled to a controlled temperature between 4.2 K and 1.9 K. The dimensions of the cryostat will allow testing magnets of up to 2.5 m in length with a maximum diameter of 1.5 m and a mass of 15 tons. To allow for a faster insertion and removal of the magnets and reducing the risk of helium leaks, all cryogenics supply lines are foreseen to remain permanently connected to the cryostat. A specifically designed 100 W heat exchanger is integrated in the cryostat helium vessel for a controlled cooling of the magnet from 4.2 K down to 1.9 K in a 3 m{sup 3} helium bath. This paper describes the cryostat and its main functions, focusing on features specifically developed for this project. The status of the construction and the plans for assembly and installation at CERN are also presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The high Beta cryo-modules and the associated cryogenic system for the HIE-ISOLDE upgrade at CERN

The major upgrade of the energy and intensity of the existing ISOLDE and REX-ISOLDE radioactive ion beam facilities at CERN requires the replacement of most of the existing ISOLDE post-acceleration equipment by a superconducting linac based on quarter-wave resonators housed together with superconducting solenoids in a series of four high-β and two low-β cryo-modules. As well as providing optimum conditions for physics, the cryo-modules need to function under stringent vacuum and cryogenic conditions. We present the detail design and expected cryogenic performance of the high- β cryo-module together with the cryogenic supply and distribution system destined to service the complete superconducting linac.

43 PARTICLE ACCELERATORS↗