Search NASA⌕ Search

Engineering topics

Ren, H.

Publications and source records attributed to Ren, H..

Accelerator commissioning and rare isotope identification at the Facility for Rare Isotope Beams

In 2008, Michigan State University was selected to establish the Facility for Rare Isotope Beams (FRIB). Construction of the FRIB accelerator was completed in January 2022. Phased accelerator commissioning with heavy ion beams started in 2017 with the normal-conducting ion source and radio-frequency quadrupole. In April 2021, the full FRIB driver linear accelerator (linac) was commissioned, with heavy ion beams accelerated to energies above 200 MeV/nucleon by 324 superconducting radiofrequency (SRF) resonators operating at 2 K and 4 K with liquid-helium cooling. Further, in preparation for high-power operation, a liquid lithium charge stripper was commissioned with heavy ion beams up to uranium-238, followed by the simultaneous acceleration of multiple-charge-state heavy ion beams to energies above 200 MeV/nucleon. In December 2021, selenium-84 was produced with the FRIB target using a krypton-86 primary beam, demonstrating FRIB’s capability for scientific discovery.

07 ISOTOPE AND RADIATION SOURCES↗

Radiation hardness of the low gain avalanche diodes developed by NDL and IHEP in China

This paper presents a study on the radiation hardness of low gain avalanche detector (LGAD) developed by the Novel Device Laboratory (NDL) in Beijing and the Institute of High Energy Physics (IHEP) of Chinese Academy of Sciences, in the context of an upgrade project of the ATLAS detector for the high luminosity phase of LHC. NDL LGAD sensors with different layouts, epitaxial resistivity and doping profile were irradiated up to 1.02 × 10 15 n eq /cm 2 by 70 MeV protons at Cyclotron and Radioisotope Center (CYRIC). The timing resolution of NDL LGAD sensors reached 50 ps and the collected charge reached 3 - 4 fC after irradiation.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Commissioning Status of the Linac for the Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams will be completed in late 2021. Here, we report here on the current efforts to commission the first stages of the 200-MeV/u superconducting, continuous wave heavy-ion linac. The statuses of the cryogenic plant and its distribution system, the accelerator cryomodule commissioning and operations, the ion source and front end transport development, the radio-frequency quadrupole commissioning, and then beam dynamics development to support high-power operation are reviewed. Plans for commissioning the remainder of the linac systems are presented.

43 PARTICLE ACCELERATORS↗

Experimental Study of Acceptor Removal in UFSD

The performance of the Ultra-Fast Silicon Detectors (UFSD) after irradiation with neutrons and protons is compromised by the removal of acceptors in the thin layer below the junction responsible for the gain. In this study, the effect is tested both with capacitance–voltage, C–V, measurements of the doping concentration and with measurements of charge collection, CC, using charged particles. We find a perfect linear correlation between the bias voltage to deplete the gain layer determined with C–V and the bias voltage to collect a defined charge, measured with charge collection. An example for the usefulness of this correlation is presented.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Layout and performance of HPK prototype LGAD sensors for the High-Granularity Timing Detector

The High-Granularity Timing Detector is a detector proposed for the ATLAS Phase II upgrade. The detector, based on the Low-Gain Avalanche Detector (LGAD) technology, will cover the pseudo-rapidity region of 2.4 < |n| < 4.0 with two end caps on each side and a total area of 6.4 m 2 . The timing performance can be improved by implanting an internal gain layer that can produce signals with a fast rising edge. It significantly improves the signal-to-noise ratio. The required average timing resolution per track for a minimum ionizing particle is 30 ps at the start and 50 ps at the end of the HL-LHC operation. This is achieved with several layers of LGAD. The innermost region of the detector would accumulate a 1MeV neutron-equivalent fluence up to 2.5 10 15 n eq /cm 2 including a safety factor of 1.5 before being replaced during the scheduled shutdowns. The addition of this new detector is expected to play an important role in the mitigation of high pile-ups at the HL-LHC. The layout and performance of the various versions of LGAD prototypes produced by Hamamatsu (HPK) have been studied by the ATLAS Collaboration. The breakdown voltages, depletion voltages, inter-pad gaps, collected charge as well as the time resolution have been measured and the production yield of large size sensors has been evaluated.

47 OTHER INSTRUMENTATION↗

Radiation campaign of HPK prototype LGAD sensors for the High-Granularity Timing Detector (HGTD)

In this work, we report on the results of a radiation campaign with neutrons and protons of Low Gain Avalanche Detectors (LGAD) produced by Hamamatsu (HPK) as prototypes for the High-Granularity Timing Detector (HGTD) in ATLAS. Sensors with an active thickness of were irradiated in steps of roughly 2 up to a fluence of 3. As a function of the fluence, the collected charge and time resolution of the irradiated sensors will be reported for operation at °C.

47 OTHER INSTRUMENTATION↗