Search NASA⌕ Search

Engineering topics

Ross, J.

Publications and source records attributed to Ross, J..

At least 19 records

Measurement of Electron-Neutrino Charged-Current Cross Sections on 127 I with the COHERENT NaI$ν$E Detector

Using an 185-kg NaI[Tl] array, COHERENT has measured the inclusive electron-neutrino chargedcurrent cross section on 127 I with pion decay-at-rest neutrinos produced by the Spallation Neutron Source at Oak Ridge National Laboratory. Iodine is one the heaviest targets for which low-energy (≤ 50 MeV) inelastic neutrino-nucleus processes have been measured, and this is the first measurement of its inclusive cross section. After a five-year detector exposure, COHERENT reports a flux-averaged cross section for electron neutrinos of ${9.2}_{–1.8}^{+2.1}$ × 10 –40 cm 2 . This corresponds to a value that is ~41% lower than predicted using the MARLEY event generator with a measured Gamow-Teller strength distribution. In addition, the observed visible spectrum from charged-current scattering on 127 I has been measured between 10 and 55 MeV, and the exclusive zero-neutron and one-or-more-neutron emission cross sections are measured to be ${5.2}_{–3.1}^{+3.4}$ × 10 –40 and ${2.2}_{—2.2}^{+3.5}$ × 10 –40 cm 2 , respectively.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Understanding the tool influence function during sub-aperture belt-on-wheel glass polishing

The tool influence function (TIF) during sub-aperture belt-on-wheel polishing has been evaluated as a function of various process conditions (belt use/wear, dwell time, displacement, belt velocity, and wheel modulus and diameter) on fused silica glass workpieces using C e O 2 polishing media. TIF spots are circular or elliptical in shape with a largely flat bottom character. Furthermore, the volumetric removal rate varies significantly with belt use (or wear), stabilizing after ~<!-- ~ --> 15 m i n of use. A modified Preston model, where the pressure dependence is adjusted using a different scaling of the wheel modulus ( E w 0.5 ), largely predicts the volumetric removal rate over the range of process conditions evaluated. The relatively high volumetric removal rate of 30 -<!-- - --> 60 m m 3 / h using a fixed C e O 2 -in-resin-host belt offers a rapid, and hence, more economical, initial polish of aspheric and freeform optics.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Measurement of scintillation response of CsI[Na] to low-energy nuclear recoils by COHERENT

Here, we present results of several measurements of CsI[Na] scintillation response to 3–60 keV energy nuclear recoils performed by the COHERENT collaboration using tagged neutron elastic scattering experiments and an endpoint technique. Earlier results, used to estimate the coherent elastic neutrino-nucleus scattering (CEvNS) event rate for the first observation of this process achieved by COHERENT at the Spallation Neutron Source (SNS), have been reassessed. We discuss corrections for the identified systematic effects and update the respective uncertainty values. The impact of updated results on future precision tests of CEvNS is estimated. We scrutinize potential systematic effects that could affect each measurement. In particular we confirm the response of the H11934-200 Hamamatsu photomultiplier tube (PMT) used for the measurements presented in this study to be linear in the relevant signal scale region.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Monitoring the SNS basement neutron background with the MARS detector

Here, we present the analysis and results of the first dataset collected with the MARS neutron detector deployed at the Oak Ridge National Laboratory Spallation Neutron Source (SNS) for the purpose of monitoring and characterizing the beam-related neutron (BRN) background for the COHERENT collaboration. MARS was positioned next to the COH-CsI coherent elastic neutrino-nucleus scattering detector in the SNS basement corridor. This is the basement location of closest proximity to the SNS target and thus, of highest neutrino flux, but it is also well shielded from the BRN flux by infill concrete and gravel. Furthermore, these data show the detector registered roughly one BRN per day. Using MARS' measured detection efficiency, the incoming BRN flux is estimated to be 1.20 ± 0.56 neutrons/m 2 /MWh for neutron energies above ~3.5 MeV and up to a few tens of MeV. We compare our results with previous BRN measurements in the SNS basement corridor reported by other neutron detectors.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A D$_2$O detector for flux normalization of a pion decay-at-rest neutrino source

We report on the technical design and expected performance of a 592 kg heavy-water-Cherenkov detector to measure the absolute neutrino flux from the pion-decay-at-rest neutrino source at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL). The detector will be located roughly 20 m from the SNS target and will measure the neutrino flux with better than 5% statistical uncertainty in 2 years. This heavy-water detector will serve as the first module of a two-module detector system to ultimately measure the neutrino flux to 2–3% at both the First Target Station and the planned Second Target Station of the SNS. This detector will significantly reduce a dominant systematic uncertainty for neutrino cross-section measurements at the SNS, increasing the sensitivity of searches for new physics.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Technical/ administrative options for managing tritium MCL exceedances in P-area groundwater and Steel Creek

This white paper was requested by the Core Team (United States Department of Energy [USDOE], United States Environmental Protection Agency [USEPA], and South Carolina Department of Health and Environmental Control [SCDHEC]) at the P-Area Groundwater (PAGW) Operable Unit (OU) Scoping Meeting held in January 2017 to discuss recent data and potential alternatives in support of a focused Corrective Measures Study/Feasibility Study (CMS/FS). This white paper presents an overview of the problem, and a range of technical and administrative options for addressing the tritium contamination in groundwater and Steel Creek. As tritium cannot be treated practicably, alternatives are limited to media transfer, containment and natural attenuation principally relying on radioactive decay. Using other groundwater OU decisions involving tritium as precedent, Savannah River Nuclear Solutions (SRNS) recommends that final tritium alternatives be evaluated in a CMS/FS, understanding that the likely preferred remedy will include natural attenuation with land use controls (LUCs). This is based on the inability to significantly reduce tritium impact to Steel Creek using an engineered solution as compared to natural attenuation. The timing of this evaluation could be conducted concurrently with the final remedy evaluation for volatile organic compounds (VOCs).

54 ENVIRONMENTAL SCIENCES↗

Baseline groundwater model update for p-area groundwater operable unit, NBN

This report documents the development of a numerical groundwater flow and transport model of the hydrogeologic system of the P-Area Reactor Groundwater Operable Unit at the Savannah River Site (SRS) (Figure 1-1). The P-Area model provides a tool to aid in understanding the hydrologic and geochemical processes that control the development and migration of the current tritium, tetrachloroethene (PCE), and trichloroethene (TCE) plumes in this region.

54 ENVIRONMENTAL SCIENCES↗

Vapor Extraction Well Performance and Recommendations for Future Soil Vapor Extraction Activities at the A-014 Outfall

The vadose zone near the A-014 Outfall contains residual volatile organic compounds that serve as a potential source for groundwater contamination. Since 1995 active soil vapor extraction has been an integral part of the corrective actions at this facility. Currently two separate soil vapor extraction systems are being used to remove contamination in the vapor phase from the subsurface. The 782-3M soil vapor extraction unit was deployed in April of 1995 and the A-014 Mobile #3 unit was deployed in January of 2009. The objective of this investigation is to evaluate the performance of individual wells associated with these systems and provide recommendations on possible optimizations to these systems. Options that are considered include continuation of active extraction, transition to a low-energy soil vapor extraction treatment, or abandon nonperforming wells. The scope of the investigation examined the eighteen (18) vadose zone wells that are associated with the ongoing Resource Conservation and Recovery Act corrective action program within A/M Area. During the evaluation process, individual wells were isolated and purged for a standard period using the existing soil vapor extraction system. Following the purge period, vapor samples were collected intermittently over the following 24–72-hour period. The objective of the sampling activity was to collect sufficient data to estimate the mass flow rate of contaminants from the individual extraction wells. Subsequent analysis then evaluated and ranked extraction performance to provide recommendations on the viability, operational scheme, and applicability of low energy soil vapor extraction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Process Design and Economics for the Conversion of Lignocellulosic Biomass to Hydrocarbons: Dilute-Acid and Enzymatic Deconstruction of Biomass to Sugars and Catalytic Conversion of Sugars to Hydrocarbons

This report describes one potential conversion process to hydrocarbon products by way of catalytic conversion of lignocellulosic-derived hydrolysate. This model leverages expertise established over time in biomass deconstruction and process integration research at NREL, while adding in new technology areas for sugar purification and catalysis. The overarching process design converts biomass to die die diesel- and naphtha-range fuels using dilute-acid pretreatment, enzymatic saccharification, purifications, and catalytic conversion focused on deoxygenating and oligomerizing biomass hydrolysates.

09 BIOMASS FUELS↗

Process Design and Economics for the Conversion of Lignocellulosic Biomass to Hydrocarbons: Dilute-Acid and Enzymatic Deconstruction of Biomass to Sugars and Biological Conversion of Sugars to Hydrocarbons

This report describes one potential conversion process to hydrocarbon products by way of biological conversion of lingnocellulosic-dervied sugars. The process design converts biomass to a hydrocarbon intermediate, a free fatty acid, using dilute-acid pretreatement, enzymatic saccharification, and bioconversion. Ancillary areas--feed handling, hydrolysate conditioning, product recovery and upgrading (hydrotreating) to a final blendstock material, wastewater treatment, lignin combusion, and utilities--are also included in the design.

09 BIOMASS FUELS↗