Search NASA⌕ Search

Engineering topics

Saini, A.

Publications and source records attributed to Saini, A..

At least 19 records

Beam Dynamics simulations for ERDC project -- SRF linac for industrial use

Compact conductively cooled SRF industrial linacs can provide unique parameters of the electron beam for industrial applications. (up to 10MeV, 1MW). For ERDC project we designed normal conducting RF injector with thermal RF gridded gun integrated in first cell of multi-cell cavities. For design of the RF gun we used MICHELLE software to simulate and optimize parameters of the beam. Output file was converted to ASTRA format and most beam dynamic simulations in multi-cell normal conducting cavity and cryomodule were performed by using ASTRA software. For cross-checking we compare results of MICHELLE and AS-TRA in first few cells. At the end of injector beam reach ~250keV energy which allow to trap bunch in acceleration regime without losses in TESLA like 1.3 GHz cavity. Short solenoid at the end of injector allow to regulate transverse beam size in cryomodule to match beam to extraction system and also reduce charge losses in accelerator.

43 PARTICLE ACCELERATORS↗

Gridded RF Gun Design for SRF Linac Applications

The thermionic gridded gun is described which generates short electron bunches for further acceleration in a Nb3Sn conduction cooled SRF linac. The gun is built into the first cavity of the 250 keV injector [1] for the 20 kW, 10 MeV, 1.3 GHz CW conduction cooled one-cavity linac. The beam current is 2 mA. The RF gun design is presented as well as the results of perveance measurements, which are in a good agreement with the design parameters. The design of the RF resonator of the gun is presented also. The beam generated by the gun is matched to the injector to provide lack of current interception in the SRF cavity.

43 PARTICLE ACCELERATORS↗

GRIDDED RF GUN DESIGN FOR SRF LINAC APPLICATIONS

The thermionic gridded gun is described which gener-ates short electron bunches for further acceleration in a Nb3Sn conduction cooled SRF linac. The gun is built into the first cavity of the 250 keV injector [1] for the 20 kW, 10 MeV, 1.3 GHz CW conduction cooled one-cavity linac. The beam current is 2 mA. The RF gun design is presented as well as the results of perveance measure-ments, which are in a good agreement with the design parameters. The design of the RF resonator of the gun is presented also. The beam generated by the gun is matched to the injector to provide lack of current inter-ception in the SRF cavity.

Gonin, I.↗

Beam Optics Design of a Prototype 20 KW Conduction-cooled SRF Accelerator for Medical Sterilization

Superconducting technology has significantly advanced the capabilities of particle accelerators, facilitating higher beam-power operations for fundamental research at a comparatively lower cost. However, the conventional implementation of superconducting technology introduces complexities in the form of cryogenic plants, cryogenic distribution systems and substantial construction and operational cost. In response to these challenges, recent research efforts at Fermilab have been dedicated to the development of a cryogen-free, conduction-cooled Nb3Sn-based superconducting technology. This paper outlines the beam optics design of a 20-kW conduction-cooled compact superconducting accelerator for medical sterilization. The paper reviews both the physics and practical constraints associated with high beam-power operation within the context of industrial applications. The focus is on providing insights into the potential of this innovative technology to overcome existing challenges and pave the way for more accessible and efficient industrial particle accelerators.

43 PARTICLE ACCELERATORS↗

Artificial Intelligence for the Electron Ion Collider (AI4EIC)

The Electron-Ion Collider (EIC), a state-of-the-art facility for studying the strong force, is expected to begin commissioning its first experiments in 2028. This is an opportune time for artificial intelligence (AI) to be included from the start at this facility and in all phases that lead up to the experiments. The second annual workshop organized by the AI4EIC working group, which recently took place, centered on exploring all current and prospective application areas of AI for the EIC. This workshop is not only beneficial for the EIC, but also provides valuable insights for the newly established ePIC collaboration at EIC. This paper summarizes the different activities and R&D projects covered across the sessions of the workshop and provides an overview of the goals, approaches and strategies regarding AI/ML in the EIC community, as well as cutting-edge techniques currently studied in other experiments.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

An 8 GeV linac as the Booster replacement in the Fermilab Power Upgrade

Increasing the Main Injector beam power above ~ 1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. In this paper, we consider an 8 GeV linac Booster replacement that produces 8 GeV H$^{-}$ beam for injection into the Recycler Ring or Main Injector. This upgrade will maximize the beam available for neutrino production for the long baseline DUNE experiment to greater than 2.5 MW and enable a next generation frontier experiments. The 8 GeV linac takes ~ 1 GeV beam from the PIP-II Linac and accelerates it to ~ 2 GeV in a650 MHz superconducting RF linac, followed by a ~ 2 to 8 GeV pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in superconducting RF technology. The linac configuration and beam dynamics requirements are presented. Injection options are discussed, including use of an8 GeV Accumulator Ring. Foil-based injection is the present standard but R&D toward implementing laser-assisted injection could enable a significant improvement. Research needed to implement the Booster replacement is described.

43 PARTICLE ACCELERATORS↗

Beam Dynamics Studies at the PIP-II Injector Test Facility

A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised of a 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1- MeV CW RFQ, followed by a 10-m Medium Energy Beam Transport (MEBT), 2 cryomodules accelerating the beam to 16 MeV and a High-Energy Beam Transport (HEBT) bringing the beam to a dump. This paper presents beam dynamics - related measurements performed at PIP2IT such as the Twiss parameters with Allison scanners, beam envelopes along the injector, and transverse and longitudinal rms emittance reconstruction. These measurements are compared with predictions from the beam dynamics code Tracewin.

43 PARTICLE ACCELERATORS↗

An 8 GeV Linac as the booster replacement in the Fermilab Power Upgrade [Slides]

Increasing the Fermilab Main Injector beam power available to the high-energy neutrino experiments above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Rapid-cycling synchrotron and Linac solutions were considered for this purpose. We consider the Linac version that produces 8 GeV H- beam for injection into the Recycler Ring or Main Injector. The new Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~8 GeV in SRF structures. The Linac components incorporate recent improvements in SRF technology.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Conceptual design report: a ring-based electron cooling system for the EIC

This report describes a concept of an EIC cooling system, based on a proven induction-linac technology with a DC electron beam. The system would operate in a full energy range of proton beams (100–270 GeV) and would provide 50–100 A electron beams, circulating in a cooler ring for 5 ms. Every 5 ms a new electron pulse would be injected into the cooler ring to provide continuous cooling at collisions. Operations with a 10-ms cycle is possible but it will reduce the cooling rates by ~30%. The system is capable of delivering the required performance in the entire EIC energy range with emittance cooling times of less than 1–2 hours.

43 PARTICLE ACCELERATORS↗

An 8 GEV Linac As The Booster Replacement In The Fermilab Power Upgrade

Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or MI The new linac takes ~1 GeV beam from the PIP-II linac and accelerates it to ~ 2 GeV in a 650 MHz SRF linac, and then accelerates to ~8 GeV in an SRF pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. This Booster Replacement linac (BRL) will increase MI beam power to DUNE to more than 2.5 MW and enable next-generation intensity frontier experiments.

Neuffer, David V.↗

Acceptance Calculation and Study of Fault Scenarios in the PIP-II Linac

The Proton Improvement Plan (PIP)-II is a proposed high intensity proton facility being developed at the Fermilab. The PIP-II is primarily based on construction of a new superconducting radio frequency (SRF) linear accelerator (linac) that would deliver an average beam current of 2mA with output energy up to 800 MeV. The acceptance of an accelerator outlines its sensitivity against deviations from its nominal design parameters. Consequently, a higher acceptance minimizes possibility of the beam loss. This paper presents longitudinal and transverse acceptance of the PIP-II SRF linac. Furthermore, paper also discusses implications of fault scenarios, such as the cavity failure, on the beam optics and acceptances.

43 PARTICLE ACCELERATORS↗

Initial Assessment of Availability and Reliability for the PIP-II Superconducting Radio Frequency Linear Accelerator Facility

The Proton Improvement Plan -II (PIP-II) is a high intensity and high energy proton accelerator which will be used to support the neutrino program at Fermilab. The accelerator will deliver a 2 mA average beam current at a kinetic energy of 800 MeV. Due to the requirements from experiments, this accelerator is designed to be a highly reliable and available system. A target availability of the complete accelerator facility was prescribed to be 90%. An availability and reliability assessment of the accelerator was carried out to ascertain that the design can meet the target availability specification. The results were estimated for the nominal operational mode, when an 800 MeV beam is delivered on the target and for the critical operational mode, when a 600 MeV output beam was incident on the target. The design of a complete accel-erator system is a complex arrangement of a large number of components. To simplify the analysis, a few components were shortlisted and based on their functions, an accelerator model was created. The model is represented in the form of reliability block diagrams. Availability and reliability were estimated for each operational mode. To increase the availa-bility and reliability of the overall accelerator, redundancy of one cavity per section in the superconducting portion of the Linac was introduced.

43 PARTICLE ACCELERATORS↗

Beam Tests of the PIP-II Injector Test Radio Frequency Quadrupole

In modern high intensity ion-particle accelerators, a Radio Frequency Quadrupole (RFQ) is utilized to prepare a high-quality beam for injection to the main accelerating section. Since an RFQ governs the initial beam parameters, characterization of the beam coming out from the RFQ is foremost step toward commissioning of an accelerator facili-ty. It allows validating the RFQ design as well as attaining a better understanding of charged-particle beams. This pa-per describes the beam-performance of the Proton Improvement Plan-II Injector Test (PIP2IT) Continuous Wave (CW) four vane-type RFQ. It is designed to operate at a frequency of 162.5 MHz and accelerate a nominal H- beam of 5 mA from 30 keV to 2.1 MeV. The paper details beam tests performed to validate the RFQ design specifications for trans-mission, beam kinetic energy and, RMS emittances. The paper also presents beam profile measurements and implica-tion of the beam-jitters on the effective beam emittance at the RFQ exit.

43 PARTICLE ACCELERATORS↗