Search NASA⌕ Search

Engineering topics

Saini, A.

Publications and source records attributed to Saini, A..

At least 37 records · Page 2

Measurements of a 2.1 MeV H$^-$ beam with an Allison scanner

Transverse 2D phase space distribution of a 2.1 MeV, 5 mA H$^-$ beam is measured at the PIPIT test accelerator at Fermilab with an Allison scanner. The paper describes the design, calibration, and performance of the scanner as well as the main results of the beam measurements. Analyses of the recorded phase portraits are performed primarily in action-phase coordinates; the stability of the action under linear optics makes it easier to compare measurements taken with different beamline conditions, e.g. in various locations. The intensity of a single measured point (\pixel") is proportional to the phase density in the corresponding portion of the beam. When the Twiss parameters are calculated using only the high-phase density part of the beam, the pixel intensity in the beam core is found to be decreasing exponentially with action and to be phase-independent. Outside of the core, the intensities decrease with action at a significantly slower rate than in the core. This `tail' comprises 10-30% of the beam, with 0.1% of the total measured intensity extending beyond the action 10-20 times larger than the rms emittance. The transition from the core to the tail is accompanied by the appearance of a strong phase dependence, which is characterized in action-phase coordinates by two `branches' extending beyond the core. A set of selected measurements shows, in part, that there is no measurable emittance dilution along the beam line in the main portion of the beam; the beam parameters are practically constant over a 0.5 ms pulse; and scraping in various parts of the beam line is an effective way to decrease the transverse tails by removing the branches.

43 PARTICLE ACCELERATORS↗

Experience with Long-Pulse Operation of the PIP2IT Warm Front End

The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the proposed PIP-II accelera-tor, which will have a duty factor of 1.1% or above. The maximum achieved power is 5 kW (2.1 MeV x 5 mA x 25 ms x 20 Hz). This paper describes the difficulties encoun-tered and some of the solutions that were implemented.

43 PARTICLE ACCELERATORS↗

The Beam Dynamics Updates of the Fermilab PIP-II 800 MeV Superconducting LINAC

The Proton Improvement Plan (PIP) -II is a high inten-sity proton facility being developed to support a neutrino program over the next two decades at Fermilab. At its core is the design and construction of a Continuous Wave (CW) compatible superconducting radio frequency (SRF) linear accelerator that would accelerate an average beam current of 2 mA up to 800 MeV. This paper presents recent updates in the beam dynamics leading to a reliable and robust linac design and simplifying the cryomodule assembly.

43 PARTICLE ACCELERATORS↗

Beam Dynamics Study of PIP-II Superconducting Linac in the Presece of Misalignment Errors

The Proton Improvement Plan (PIP)-II is a proposed high intensity proton facility being developed at the Fermilab. The PIP-II is primarily based on construction of a new superconducting radio frequency (SRF) linear accelerator (linac) that would deliver an average beam current of 2mA with output energy up to 800 MeV. The linac performance is mainly determined by beam sensitivity against various component errors. These errors trigger not only emittance dilution but also a beam loss in worst cases. This paper discusses effects of component misalignments on the beam and presents alignment budget for the PIP-II SRF linac.

43 PARTICLE ACCELERATORS↗

Availability and Reliability analysis of Proton Improvement Plan-II Superconducting Radio Frequency Linear Accelerator

Proton Improvement Plan -II is high intensity and high energy proton accelerator which will be used to support neutrino program at Fermilab. Due to the requirement from experiments, this accelerator is designed to be a highly reliable and available system. In this paper, a reliability model has been created which depicts a complete accelerator system and supporting utilities. Reliability and Availability of the complete system are estimated. It has been shown that Availability and Reliability of the system can be increased significantly by introducing failure tolerance of the beamline elements in each accelerating section of superconducting linac.

43 PARTICLE ACCELERATORS↗

Beam Dynamics Study of PIP-II Superconducting Linac in the Presence of Misalignment Errors

The Proton Improvement Plan (PIP)-II is a proposed high intensity proton facility being developed at the Fermilab. The PIP-II is primarily based on construction of a new superconducting radio frequency (SRF) linear accelerator (linac) that would deliver an average beam current of 2mA with output energy up to 800 MeV. The linac performance is mainly determined by beam sensitivity against various component errors. These errors trigger not only emittance dilution but also a beam loss in worst cases. This paper discusses effects of component misalignments on the beam and presents alignment budget for the PIP-II SRF linac.

43 PARTICLE ACCELERATORS↗

Availability and Reliability Analysis of Proton Improvement Plan-II Superconducting Radio Frequency Linear Accelerator

Proton Improvement Plan -II is high intensity and high energy proton accelerator which will be used to support neutrino program at Fermilab. Due to the requirement from experiments, this accelerator is designed to be a highly reliable and available system. In this paper, a reliability model has been created which depicts a complete accelerator system and supporting utilities. Reliability and Availability of the complete system are estimated. It has been shown that Availability and Reliability of the system can be increased significantly by introducing failure tolerance of the beamline elements in each accelerating section of superconducting linac.

43 PARTICLE ACCELERATORS↗

Acceptance Calculation and Study of Fault Scenarios in the PIP-II Linac

The Proton Improvement Plan (PIP)-II is a proposed high intensity proton facility being developed at the Fermilab. The PIP-II is primarily based on construction of a new superconducting radio frequency (SRF) linear accelerator (linac) that would deliver an average beam current of 2mA with output energy up to 800 MeV. The acceptance of an accelerator outlines its sensitivity against deviations from its nominal design parameters. Consequently, a higher acceptance minimizes possibility of the beam loss. This paper presents longitudinal and transverse acceptance of the PIP-II SRF linac. Furthermore, paper also discusses implications of fault scenarios, such as the cavity failure, on the beam optics and acceptances.

43 PARTICLE ACCELERATORS↗

Final report: Conceptual design of a 10-megawatt electron beam irradiation facility for bio-solid waste treatment

In this report, a conceptual design is proposed for a 10 mega-watt (MW) electron beam accelerator for wastewater treatment. This is done by applying the latest accelerator technologies developed at Fermilab and within the Department of Energy (DOE) Office of Science laboratory complex. This report expands on previous work on the 1 MW accelerator, which was developed with requirements from Metropolitan Water Reclamation District (MWRD) in Chicago. The full report of the previous effort is available from the Office of High Energy Physics Accelerator Stewardship Program [1].

43 PARTICLE ACCELERATORS↗

Experimental Study of Beam Dynamics in the PIP-II MEBT Prototype

The Proton Improvement Plan, Stage Two (PIP-II) [1] is a program of upgrades proposed for the Fermilab injection complex, which central part is an 800 MeV, 2 mA CW SRF linac. A prototype of the PIP-II linac front end called PIP-II Injector Test (PIP2IT) is being built at Fermilab. As of now, a 15 mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a 10 m Medium Energy Beam Transport (MEBT) have been assembled and commissioned. The MEBT bunch-by-bunch chopping system and the requirement of a low uncontrolled beam loss put stringent limitations on the beam envelope and its variation. Measurements of transverse and longitudinal beam dynamics in the MEBT were performed in the range of 1- 10 mA of the RFQ beam current. Almost all measurements are made with 10 μs beam pulses in order to avoid damage to the beam line. This report presents measurements of the transverse optics with differential trajectories, reconstruction of the beam envelope with scrapers and an Allison emittance scanner, as well as bunch length measurements with a Fast Faraday Cup.

43 PARTICLE ACCELERATORS↗

Chracterization of the beam from the RFQ of the PIP-II Injector Test

A 2.1 MeV, 10 mA CW RFQ has been installed and commissioned at the Fermilab’s test accelerator known as PIP-II Injector Test. This report describes the measure-ments of the beam properties after acceleration in the RFQ, including the energy and emittance.

43 PARTICLE ACCELERATORS↗

The PIP-II Conceptual Design Report

The Proton Improvement Plan-II (PIP-II) encompasses a set of upgrades and improvements to the Fermilab accelerator complex aimed at supporting a world-leading neutrino program over the next several decades. PIP-II is an integral part of the strategic plan for U.S. High Energy Physics as described in the Particle Physics Project Prioritization Panel (P5) report of May 2014 and formalized through the Mission Need Statement approved in November 2015. As an immediate goal, PIP-II is focused on upgrades to the Fermilab accelerator complex capable of providing proton beam power in excess of 1 MW on target at the initiation of the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) program, currently anticipated for the mid- 2020s. PIP-II is a part of a longer-term goal of establishing a high-intensity proton facility that is unique within the world, ultimately leading to multi-MW capabilities at Fermilab....

43 PARTICLE ACCELERATORS↗

PIP-II Injector Test: Challenges and Status

The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H- superconducting RF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test is under construction. It includes a 10mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the Injector Test warm front end, including results of the beam commissioning through the installed components, and progress with SRF cryomodules and other systems.

43 PARTICLE ACCELERATORS↗

Transmission efficiency measurement at the FNAL 4-rod RFQ

This paper presents measurements of the beam transmission performed on the 4-rod RFQ currently under operation at Fermilab. The beam current has been measured at the RFQ exit as a function of the magnetic field strength in the two LEBT solenoids. This measurement is compared with scans performed on the FermiGrid with the beam dynamics code TRACK. A particular attention is given to the impact, on the RFQ beam transmission, of the space-charge neutralization in the LEBT.

43 PARTICLE ACCELERATORS↗