Search NASA⌕ Search

Engineering topics

Sherif A Shazly

Publications and source records attributed to Sherif A Shazly.

Inertial Transfer Concept for Autonomous In-Space Assembly

Rocket payload and fairing size have placed strict mass and volume limitations on single launch in-space structures. These limitations are what motivates In-Space Assembly (ISA) and where Inertial Transfer has potential to improve or augment ISA capabilities by utilizing a multiagent autonomous system to transport untethered payloads. The Inertial Transfer concept is presented including autonomy capabilities, potential risks, and three system configurations. These configurations are based on the autonomous system’s available sensor coverage that tracks the payload’s state. Participating agents have well-defined roles, expectations, and assumptions in their physical organization and coordination of actions depending the mode of operation. The sensor information available to participating agents is considered as it affects the uncertainty in the estimated state and the actions required to capture the payload.

Multi-Agent↗

Inertial Transfer Concept for Autonomous In-Space Assembly

Rocket payload and fairing size have placed strict mass and volume limitations on single launch in-space structures. These limitations are what motivates In-Space Assembly (ISA)and where Inertial Transfer has potential to improve or augment ISA capabilities by utilizing an efficient multi-agent autonomous system to transport untethered payloads. Adoption of an inertial transfer approach significantly reduces system complexity, energy and time needed for assembly compared to conventional ISA capabilities, increasing the likelihood of early adoption for assembly. The Inertial Transfer concept is presented including autonomy capabilities, potential risks, and three system configurations. These configurations are based on the autonomous system’s available sensor coverage that tracks the payload’s state. Participating agents have well-defined roles, expectations, and assumptions in their physical organization and coordination of actions depending the mode of operation. The sensor information available to participating agents is considered as it affects the uncertainty in the estimated state and theactions required to capture the payload.

Multi-Agent↗

Inertial Transfer: Concept and Multi-Agent Approach

Research and development of cost saving technologies is vital to the success of NASA’s strategic goal to extend human presence deeper into space and to the moon for sustainable long-term exploration and utilization. Reduction of mass has long been a method of reducing space mission costs. In this submission, Inertial Transfer, a new approach to mass transfer in space, is presented. A Multi-Agent System solution to the problem space is discussed. A scaled base-line simulator is constructed and demonstrated which will enable the development of AI capabilities necessary to perform Inertial Transfer. Finally, future work and key challenges are discussed.

Multi-Agent↗

Designing a Software Architecture for the Precision Assembly of Space Structures

As NASA’s space exploration and science missions expand in complexity, longevity, anddistance beyond earth’s orbit, Orbital Servicing, Assembly and Manufacturing (OSAM)technologies and concepts have become a critical area of ongoing research and innovation.Artemis’ Moon-to-Mars goals of building sustainable elements on and around the Moon andMars that allow our robots and astronauts to explore and conduct more scientific researchwill demand in situ resource utilization, construction, and maintenance to succeed. In-spaceAssembly (ISA), as a sub-component of OSAM, focuses on the on-orbit building or fabricationof mission infrastructure and payloads. One such ISA application is highlighted by the recentNASA In-Space Assembled Telescope (iSAT) study, which stated that the next generation ofspace observatories will exceed the fairing size of existing or even planned launch vehicles andISA has emerged as a viable approach for observatory assembly. Research efforts at NASALangley Research Center have led to the design of a novel TriTruss structural concept for themodular construction of large complex persistent platforms. The TriTruss design and otherdeveloping OSAM technologies enable larger and persistent space missions that would notbe possible with single-launch-sized structures. For example, 20 meter or larger telescopesor orbital platform applications. However, the increased complexity will require autonomousoperations for the construction and maintenance of long-term infrastructure to achieve missionsuccess. NASA’s Precision Assembly of Space Structures (PASS) project is focused on thestructural and autonomy capabilities required to construct an iSAT in deep space. PASSresearch efforts will develop and validate critical technologies needed for effective efficienton-orbit assembly that can be confidently adopted for future systems. PASS will utilize theTriTruss modules to demonstrate the autonomous modular assembly of a 20m-class iSAT mirrorbackbone structure including simulated mirrors and wiring harness. In this paper, we addressthe software and hardware design considerations, technologies, and challenges of designing arobust robotics framework for assembling modular space structures in support of In SpaceAssembly missions in general as well as for PASS specifically.

Benjamin N Kelley↗