Examples of Risk and Reliability Models using Simulation
Slides for an external presentation at a reliability workshop.
Engineering topics
Publications and source records attributed to Smith, Curtis L.
Slides for an external presentation at a reliability workshop.
Slides for an external workshop on simulation approaches to risk analysis.
General slides on INL risk analysis capabilities for SMRs.
Status slides for probabilistic risk assessment work as part of CNWG collaboration with Japan.
Included are slides for a MIT nuclear engineering department invited seminar. The talking points are: (1) Current R&D at INL in safety, risk, and reliability; (2) Technical focus; and (3) Future directions.
Slides for an invited seminar for a safety/risk class at MIT.
Nuclear energy is the most reliable and environmentally sustainable energy source available today. In the United States, nuclear-generated power accounts for approximately 20% of total electricity and over 55% of clean energy. New advanced reactors have enormous potential to help further decarbonize the energy market, enhance grid resiliency, create new jobs, and build a stronger economy. More than 50 new reactors are being developed in the United States, and the federal government realizes an urgent need to deploy nuclear technologies to meet the country’s energy, environmental, and national security goals. As such, the U.S. Department of Energy launched multiple programs to support advanced reactor deployment. The research described in this paper explores implementation strategies for the Reliability and Integrity Management Program that directly supports the U.S. Department of Energy goal to enable the near-term deployment of the advanced reactor technologies. The project is conducted under the Regulatory Development Program for advanced reactors sponsored by the U.S. Department of Energy.
This report represents the initial structure and content created for the ARC-100 nuclear reactor initial conceptual design Probabilistic Safety Assessment. The objective of the study is to assess the safety of the ARC-100 nuclear reactor conceptual design using a risk-informed approach. This early draft report is the first transmittal of the Probabilistic Safety Assessment approach and will be expanded over the remainder of the projects.
Slides for the advanced reactor safeguards spring 2022 program review meeting.
Slides to discuss a current project with DOE. Topic focus is on: - Advanced reactors will be able to use risk insights for many design aspects - We need bounding scenarios for screening and scoping purposes - We need realistic scenarios for input into the licensing basis safety-case - We need to manage inherent uncertainty - We need to automate the safety-case creation as much as possible
Probabilistic Safety Assessment (PSA) is used extensively to evaluate the risks associated with complex engineering systems like Nuclear Power Plants (NPPs). Current PSA models are based on the Event-Tree/Fault-Tree (ET/FT) methodology. ET and FT models are static and are based on Boolean logic approaches. In the past, concerns have been raised in the literature regarding the capability of the traditional static modelling approaches to adequately account for the impact of process, hardware, software, firmware and human interactions on the stochastic system behaviour. To overcome the limitations of the traditional approach to PSA, several dynamic PSA methodologies have been proposed. One of the dynamic PSA methodologies used for dynamic evaluations is Dynamic Event Tree (DET) framework which can be used to assess the impact of the parameter variability and scenario dynamics on the PSA model for the initiating event. The DET framework couples the stochastic model (number of component/trains that start on demand, operator action timing, etc.) with a Thermal-Hydraulic (TH) model of the plant. This paper explores the use of DET along with a case study on advanced reactor. The initiating event selected for the study was Class IV power supply failure event. The TH analysis considering uncertainty in various parameters was performed using RELAP5 and Reactor Analysis and Virtual control ENvironment (RAVEN) tool. Based on the uncertainty analysis, it is concluded that the peak clad temperatures (PCT) are within the limits in all the code runs implying a high-degree of safety margin. However, variation in time to reach the PCT was observed among the code runs and the mean time to reach the PCT was found to be around 8590sec (approximately 2.4 hours). Hence, sufficient time margin is available for human intervention and the operator might have a relatively stress-free state during such an accident scenario. Due to the static nature of the traditional PSA models, the safety margin available was lesser, whereas, with the help of dynamic PSA models, one can demonstrate that the actual available safety margin is more in the present case study and is valuable input from the design point of view.
Probabilistic risk assessments (PRAs) have benefitted the safe operation of the U.S. reactor fleet over many decades. Risk insights from these PRAs have provided information from many different perspectives, from what is most important to maintain at a facility to a better understanding of how to address new information regarding safety issues. The methods and tools that have supported the creation and enhancement of PRA models were established through multiple decades of research, from the 1970s starting with the WASH-1400 Reactor Safety Study through comprehensive plant-specific models in use today. Because PRA models are being used to support such a diverse array of plant decisions, they are now being applied to analyze an increasing number and diverse set of aspects of the plant, which are well beyond the initial efforts envisioned in the 1970s. These demands on PRA methods and tools have led to challenges in terms of further expansion of the use of PRA and raised the potential for future research into how to address these challenges to ensure continued nuclear safety. In addition to the PRA needs, the domain of computer science has led to advances in computational approaches that may serve to help nuclear power plant PRA applications. These newer technologies have great potential to improve the effectiveness and economics of PRA and are being considered for exploration of potential benefits to the PRA and nuclear-power communities.
Slides for a DOE GAIN meeting for the Advanced Reactor Safeguards Project meeting with advanced reactor designers in April 2021.
Slides discussing general INL capabilities in a variety of research areas including LWRS, Plant Modernization, Risk-Informed Systems Analysis, the INL Digital Innovation Center of Excellence DICE, integrated online dynamic plant models, online deterministic failure-mode and reliability models of plant systems, equipment and components, and plant information models.
This report summarizes the R&D activities of the Plant Health Management (PHM) project during fiscal year 2020 (FY20). This project focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate system sources of risk. This project development lives in cooperation with the Risk Informed Asset Management (RIAM) project. The RIAM project, in fact, uses the reliability models and data generated by the PHM project to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture). This year’s activities for the PHM project focused mainly on the development of two classes of models. The first one includes a series of component reliability models which include aging, testing and maintenance. The second class includes a series of system reliability models which focus on the secondary side of exiting U.S. reactors. These models are based on fault tree logic structures such that they can be used by existing plant PRA software. We also started to focus on the management of health data and we tackled this issue in two directions. The first one focuses on the integration of monitor data with simulation models to assess component health. This approach is moving from a classical data based to a model+data based approach with the goal of improving higher component health information. The second direction focuses on linking equipment reliability data (e.g., maintenance/failure reports, component monitoring data) directly to system reliability models using a safety margin based language rather than a probability based language. The main advantage of a safety margin based language is that it can provide to system engineers more tangible information on system/component health and how it propagates to the system level.
This report summarizes the R&D activities of the Risk Informed Asset Management (RIAM) project during fiscal year 2020 (FY20). This project focuses on the development of methods designed to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture) provided system/component health/cost data. This project development lives in cooperation with the Plant Health Management (PHM) project which focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate most relevant sources of risk. This year’s activities for the RIAM project focused on the continuation of schedule optimization algorithms developed in FY19. While in FY19 we focused on both deterministic and stochastic capital budgeting methods, in FY20 we moved forward by implementing two versions of schedule optimization methods. The first one reformulates the capital budgeting problem in a distributionally robust form which allows the user to rely on data directly rather than proposing a distribution from the data itself. The second version reformulates the capital budgeting explicitly using risk measures as variables to maximize/minimize. Lastly, we focused on the development of methods designed to identify the optimal maintenance posture based on the Pareto Frontier analysis. Rather than performing a tradeoff analysis (i.e., identify the absolute best posture), the Pareto Frontier analysis performs a trade space exploration approach (i.e., identify value and costs of several postures and have the analyst perform the task of imposing desired value and cost constraints). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space.
This paper is a continuation of a paper presented at the 13th Probabilistic Safety Assessment and Management Conference, in which a discussion of modeling failure modes of complex components was presented; see Paulos and Smith (2016). The paper demonstrated how the typical method of treating failure modes as being exponential in nature may yield optimistic predictions when estimating how improvements to components will perform in the real world. Instead of relying on textbook methods, it is more accurate to model the failure modes as a race in time; unfortunately, this does not give a closed-form solution. This work uses a simulation to solve for the model of the world, and is compared to the standard methodology of treating the failure modes as exponential random failures. The standard method is shown to have optimistic predictions, which will lead to prediction errors when failure modes were removed or “fixed.” The failure mode methodology presented in the first paper treated the data as being censored when the test stopped. In this paper, we will compare the results from treating the data as both censored and missing, and comparisons will be shown showing which method is more accurate and under what conditions.
As commercial nuclear power plants (NPPs) pursue extended plant operations in the form of Second License Renewals (SLRs), opportunities exist for these plants to provide capital investments to ensure long-term, safe, and economic performance. Several utilities have already announced their intention to pursue extended operations for one or more of their NPPs via SLR2. The goal of this research is to develop a riskinformed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions in NPP operations. In order to prioritize project selection via a riskinformed approach we developed a single decision-making tool that integrates safety/reliability, cost, and stochastic optimization models to provide users with data analysis capabilities to more cost effectively manage plant assets. Both stochastic analysis methods—such as Monte Carlo-based sampling strategies—and multi-stage stochastic optimization strategies are employed to provide priority lists to decisionmakers in support of risk-informed decisions. We applied the proposed method to a trial application of projected replacement/refurbishment expenditures for plant capital assets (i.e., Structures, Systems, and Components [SSCs]). The objective is to optimize the SSC replacement/refurbishment schedule in terms of economic constraints, data uncertainties, and SSC reliability data, as well to generate a priority list for maximizing returns on investment.