Stochastic Analysis for Long Term Capital Structures, Systems, and Components Refurbishment and Replacement

As commercial Nuclear Power Plants (NPPs) pursue extended plant operation in the form of Second License Renewal (SLR), opportunities exist for these plants to provide capital investments to ensure long-term safe and economic performance. At the current time, several utilities have announced an intention to pursue extended operation for one or more of their NPPs via SLR . The goal of this research is to develop a risk-informed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions for NPP operations. Since the capital investments are influenced by various factors, such as markets, safety and regulatory, the decision-making process of NPP operations should take into account relevant factors for balancing risks, costs and profits. The traditional method of capital budgeting is based on the priority list of candidate projects using economic measures such as benefit-investment ratio, net present value (NPV) and internal rate of return. In the literatures, the problem of capital budgeting or the variant can be represented by an appropriate knapsack problem. The knapsack approach to capital budgeting takes as input as investment, along with the cost and profit of each project. The objective of capital budgeting is to find the combination of the binary decisions for every investment such that the overall profit is as large as possible. The output is a collection of projects to be carried out, and we refer this selected collection of projects as a project portfolio. One limitation of traditional optimization models for capital budgeting is that they do not account for risk/uncertainty in profit and cost streams associated with individual projects, they do not account for risk in resource availability in future years [1,2,3]. Projects can incur cost over-runs, especially when projects are large, performed infrequently, and when there is risk regarding technical viability, external contractors, and/or suppliers of requisite parts and materials. Occasionally, projects are performed ahead of schedule and with cost savings. Planned budgets for capital improvements can be cut and key personnel may be lost. Or, there may be surprise windfalls in budgets for maintenance activities due to decreased costs for “unplanned” maintenance. In these cases, how should we resolve capital budgeting when we have risk forecasts for costs, profits and budgets? One approach we proposed in this summary is to re-solve the optimization models based on assumed statistical distributions of given parameters. If these distributions were not available, a two-stage stochastic optimization approach can be used to provide priority lists to decision-makers to support better risk-informed decisions [4, 5]. In this summary, we will only focus on the first approach.

42 ENGINEERING↗

Use of Flooding Probabilistic Risk Assessment

General slide information on using flooding Probabilistic Risk Assessment (PRA) taken from published INL reports or public Nuclear Regulatory Commission (NRC) information. Topics covered are: SDP related to flooding in US Door integrity tests at Idaho State University Smoothed Particle Hydrodynamics for external flooding NRC-INL Flood Barrier project

99 GENERAL AND MISCELLANEOUS↗

Risk-Informed Applications and Science – Past, Present, & Future

This is a presentation to be made at the University of Tokyo. The Idaho National Laboratory is creating the next-generation reliability- and risk-assessment methods and tools that support risk-informed decision-making by combining physics-based models with probabilistic quantification approaches. Integrating these two worlds of physics and probability using a simulation framework leads us to predictions based upon an approach called “computational risk assessment” which will serve as the technical basis for the future of reliability and risk approaches. The driving factors for this new approach includes: temporal (timing issues), spatial (location issues), mechanistic (physics issues), and topological (complexity issues). By combining phenomenology directly with stochastic quantification, we are able to perform advanced uncertainty analysis directly on both parameters and models. In addition, new tools allow for the creation of reduced order models that mimic high-fidelity engineering models while still permitting the realization of thousands of simulation iterations in short run-times on current workstation-class computers. While these advanced methods and tools can provide increased realism in our engineering safety and risk approaches, their greater benefit is to provide a risk-informed engineering framework for design and operation. This talk will briefly review the history of risk assessment and risk-informed applications, describe some of the current research and development found at the Idaho National Laboratory, and discuss potential future applications and approaches for advanced methods and tools.

97 MATHEMATICS AND COMPUTING↗

Comparison of a Traditional Probabilistic Risk Assessment Approach with Advanced Safety Analysis

As part of the Light Water Sustainability Program (LWRS) [1], the purpose of the Risk Informed Safety Margin Characterization (RISMC) [2] Pathway research and development (R&D) is to support plant decisions for risk-informed margin management with the aim to improve economics, reliability, and sustain safety of current NPPs. In this paper, we describe the RISMC analysis process illustrating how mechanistic and probabilistic approaches are combined in order to estimate a safety margin. We use the scenario of a “station blackout” (SBO) wherein offsite power and onsite power is lost, thereby causing a challenge to plant safety systems. We describe the RISMC approach, illustrate the station blackout modeling, and contrast this with traditional risk analysis modeling for this type of accident scenario. We also describe our approach we are using to represent advanced flooding analysis.

97 MATHEMATICS AND COMPUTING↗

Risk-Informed Safety Margin Characterization Methods Development Work

This report summarizes the research activity developed during the Fiscal year 2014 within the Risk Informed Safety Margin and Characterization (RISMC) pathway within the Light Water Reactor Sustainability (LWRS) campaign. This research activity is complementary to the one presented in the INL/EXT-??? report which shows advances Probabilistic Risk Assessment Analysis using RAVEN and RELAP-7 in conjunction to novel flooding simulation tools. Here we present several analyses that prove the values of the RISMC approach in order to assess risk associated to nuclear power plants (NPPs). We focus on simulation based PRA which, in contrast to classical PRA, heavily employs system simulator codes. Firstly we compare, these two types of analyses, classical and RISMC, for a Boiling water reactor (BWR) station black out (SBO) initiating event. Secondly we present an extended BWR SBO analysis using RAVEN and RELAP-5 which address the comments and suggestions received about he original analysis presented in INL/EXT-???. This time we focus more on the stochastic analysis such probability of core damage and on the determination of the most risk-relevant factors. We also show some preliminary results regarding the comparison between RELAP5-3D and the new code RELAP-7 for a simplified Pressurized Water Reactors system. Lastly we present some conceptual ideas regarding the possibility to extended the RISMC capabilities from an off-line tool (i.e., as PRA analysis tool) to an online-tool. In this new configuration, RISMC capabilities can be used to assist and inform reactor operator during real accident scenarios.

97 MATHEMATICS AND COMPUTING↗

DYNAMIC AND CLASSICAL PRA: A BWR SBO CASE COMPARISON

As part of the Light-Water Sustainability Program (LWRS), the purpose of the Risk Informed Safety Margin Characterization (RISMC) Pathway research and development is to support plant decisions for risk-informed margin management with the aim to improve economics, reliability, and sustain the safety of current NPPs. In this paper, we describe the RISMC analysis process illustrating how mechanistic (i.e., dynamic system simulators) and probabilistic (stochastic sampling strategies) approaches are combined in a dynamic PRA fashion in order to estimate safety margins. We use the scenario of a “station blackout” (SBO) wherein offsite power and onsite power are lost, thereby causing a challenge to plant safety systems. We describe the RISMC approach, illustrate the station blackout modeling, and compare this with traditional risk analysis modeling for this type of accident scenario. In the RISMC approach the dataset obtained consists of set of simulation runs (performed by using codes such as RELAP5/3D) where timing and ordering of events is changed accordingly to the stochastic sampling strategy adopted. On the other side, classical PRA methods, which are based on event-tree (FT) and fault-tree (FT) structures, generate minimal cut sets and probability values associated to each ET branch. The comparison of the classical and RISMC approaches is performed not only in terms of overall core damage probability but also considering statistical differences in the actual sequence of events. The outcome of this comparison analysis shows similarities and dissimilarities between the approaches but also highlights the greater amount of information that can be generated by using the RISMC approach.

97 MATHEMATICS AND COMPUTING↗

Modeling of a Flooding Induced Station Blackout for a Pressurized Water Reactor Using the RISMC Toolkit

In the Risk Informed Safety Margin Characterization (RISMC) approach we want to understand not just the frequency of an event like core damage, but how close we are (or are not) to key safety-related events and how might we increase our safety margins. The RISMC Pathway uses the probabilistic margin approach to quantify impacts to reliability and safety by coupling both probabilistic (via stochastic simulation) and mechanistic (via physics models) approaches. This coupling takes place through the interchange of physical parameters and operational or accident scenarios. In this paper we apply the RISMC approach to evaluate the impact of a power uprate on a pressurized water reactor (PWR) for a tsunami-induced flooding test case. This analysis is performed using the RISMC toolkit: RELAP-7 and RAVEN codes. RELAP-7 is the new generation of system analysis codes that is responsible for simulating the thermal-hydraulic dynamics of PWR and boiling water reactor systems. RAVEN has two capabilities: to act as a controller of the RELAP-7 simulation (e.g., system activation) and to perform statistical analyses (e.g., run multiple RELAP-7 simulations where sequencing/timing of events have been changed according to a set of stochastic distributions). By using the RISMC toolkit, we can evaluate how power uprate affects the system recovery measures needed to avoid core damage after the PWR lost all available AC power by a tsunami induced flooding. The simulation of the actual flooding is performed by using a smooth particle hydrodynamics code: NEUTRINO.

97 MATHEMATICS AND COMPUTING↗

SAPHIRE 8 Software Project Plan

This project is being conducted at the request of the DOE and the NRC. The INL has been requested by the NRC to improve and maintain the Systems Analysis Programs for Hands-on Integrated Reliability Evaluation (SAPHIRE) tool set concurrent with the changing needs of the user community as well as staying current with new technologies. Successful completion will be upon NRC approved release of all software and accompanying documentation in a timely fashion. This project will enhance the SAPHIRE tool set for the user community (NRC, Nuclear Power Plant operations, Probabilistic Risk Analysis (PRA) model developers) by providing improved Common Cause Failure (CCF), External Events, Level 2, and Significance Determination Process (SDP) analysis capabilities. The SAPHIRE development team at the Idaho National Laboratory is responsible for successful completion of this project. The project is under the supervision of Curtis L. Smith, PhD, Technical Lead for the SAPHIRE application. All current capabilities from SAPHIRE version 7 will be maintained in SAPHIRE 8. The following additional capabilities will be incorporated: • Incorporation of SPAR models for the SDP interface. • Improved quality assurance activities for PRA calculations of SAPHIRE Version 8. • Continue the current activities for code maintenance, documentation, and user support for the code.

99 GENERAL AND MISCELLANEOUS↗

SAPHIRE 8 Software Acceptance Test Plan

This document describe & report the overall SAPHIRE 8 Software acceptance test paln to offically release the SAPHIRE version 8 software to the NRC custoer for distribution.

99 GENERAL AND MISCELLANEOUS↗

Bayesian Inference in Probabilistic Risk Assessment -- The Current State of the Art

Markov chain Monte Carlo approaches to sampling directly from the joint posterior distribution of aleatory model parameters have led to tremendous advances in Bayesian inference capability in a wide variety of fields, including probabilistic risk analysis. The advent of freely available software coupled with inexpensive computing power has catalyzed this advance. This paper examines where the risk assessment community is with respect to implementing modern computational-based Bayesian approaches to inference. Through a series of examples in different topical areas, it introduces salient concepts and illustrates the practical application of Bayesian inference via Markov chain Monte Carlo sampling to a variety of important problems.

99 GENERAL AND MISCELLANEOUS↗

REPRESENTING COMMON-CAUSE FAILURES IN THE SAPHIRE SOFTWARE

Currently, the risk analysis software SAPHIRE has implemented a common-cause failure (CCF) module to represent standard CCF methods such as alpha-factor and multiple Greek letter approaches. However, changes to SAPHIRE are required to support the Nuclear Regulatory Commission’s 2007 “Risk Assessment Standardization Project” CCF analysis guidance for events assessment. This guidance provides an outline of how both the nominal CCF probabilities and conditional (e.g., after a redundant component has failed) CCF probabilities should be calculated. Based upon user-provided input and extending the limitations in the current version of SAPHIRE, the CCF module calculations will be made consistent with the new guidance. The CCF modifications will involve changes to (1) the SAPHIRE graphical user interface directing how end-users and modelers interface with PRA models and (2) algorithmic changes as required. Included in the modifications will be the possibility to treat CCF probability adjustments based upon failure types (e.g., independent versus dependent) and failure modes (e.g., failure-to-run versus failure-to-start). In general, SAPHIRE is being modified to allow the risk analyst to define a CCF object. This object is defined in terms of a basic event. For the CCF object, the analyst would need to specify a minimal set of information, including: - The number of redundant components - The failure criteria (how many component have to fail) - The CCF model type (alpha-factor, MGL, or beta-factor) - The parameters (e.g., the alpha-factors) associated with the model - Staggered or non-staggered testing assumption - Default level of detail (expanded, showing all of the specific failure combinations, or not) This paper will outline both the theory behind the probabilistic calculations and the resulting implementation in the SAPHIRE software.

97 MATHEMATICS AND COMPUTING↗