Scalable Truck Charging Demand Simulation for Cost-Optimized Infrastructure Planning

This project developed a scalable, high-resolution model to simulate medium- and heavy-duty (MHD) electric truck charging demand and assess its impact on grid infrastructure. Using generative modeling, simulation, and cost optimization, the project delivered an end-to-end software pipeline and a library of 96 real-world scenarios for the Dallas–Houston megaregion. We demonstrated a modular architecture for transportation and grid modeling, implemented cost-optimized infrastructure planning methods, and quantified grid capital, operational, and environmental costs across a wide range of truck electrification scenarios. The results have been adopted by major utility stakeholders and contributed to regional planning efforts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Integrated Assessment of a G3 GMD Event on Large-Scale Power Grids: From Magnetometer Data to Geomagnetically Induced Current Analysis

Solar activities can cause geomagnetic disturbances (GMDs) that give rise to geomagnetically induced currents (GICs) which may compromise the reliability of the power system. In order to build more reliable models representing GMD interactions with the power grid, the power system’s detailed electrical model must be considered along with fluctuations in the earth’s magnetic and induced surface electric fields. Here, this study investigates the impact of incorporating spatially varying magnetic fields into surface electric field models on GMD risk metrics. A spatially independent magnetic field model and a spatially varying model are compared through simulations. To perform this analysis, the earth’s magnetic field disturbances are transformed into surface electric fields using respective one-dimensional earth conductivity models. Then, the modeling impact of these electric fields is studied using a 2,000-bus grid for Texas and a 25,000-bus grid for the northeast and mid- Atlantic regions of the United States. Simulation results reveal that the inclusion of spatially varying magnetic fields results in considerable differences in GMD risk metrics, highlighting the importance of accounting for spatial variability when assessing GMD risks in the power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Geomagnetic Disturbance Uncertainty Quantification Modeling: An Electromagnetic Transient and Steady-State Simulation Based Approach

Geomagnetic disturbances have been shown to disrupt the operation of the bulk electrical system through low-frequency effects in the earth's magnetic field that in turn induce changing electrical fields on the earth's surface. As a result, geomagnetically induced currents flow in transmission lines, introducing the risk for widespread damage to high-voltage transformers and voltage collapse due to induced reactive power loss. In a previous paper, the authors showed how certain modeling assumptions can lead to results that are unacceptable in certain edge case scenarios. In this paper, the authors build on their previous results using modeling uncertainty quantification in order to compare the results from electromagnetic transient program modeling software, ATP, to the positive-sequence calculation software, PowerWorld.

Bretas, Arturo Suman↗

Creation of Synthetic Electric Grids (SPP/MISO) Supporting PERFORM (Final Report)

Over the course of the project, two “realistic but not real” synthetic transmission-level grid models over the SPP-MISO and ERCOT footprints were created to provide more realistic data and increase the reliability and resiliency of the grids under a variety of scenarios. The synthetic ERCOT transmission grid is compatible with the distribution grid developed in collaboration with NREL. All generators are based on the EIA 860 data and a column with EIA plant code and Gen ID is added to generators of both grids so that they can be easily mapped. The improvements are also made to electric grids including N-1 contingencies with some remedial actions, improving the transmission lines to avoid lines in lakes, including an HVDC line to the SPP-MISO case, providing several generator parameters and their temporal constraints that were not included in EIA 860 form, generators’ cost curves, load offer curves, adding phase shifters and tap changers with impedance correction tables, adding reactive power control and partitioning the grids into active and reactive reserve zones and determine different types of the required reserve for each zone. Hourly load time series at the bus level were generated to create scenarios for solving power flow in different loading conditions. Weather measurement information and the models of renewable generators are used to directly include the impact of weather on the grids. Based on a variety of load and weather conditions the grids are improved to accommodate different conditions. The ERCOT 7k-bus grids were also modeled for the year 2030 with predicted improvements in renewable resources. The renewable generation model was also improved with historic weather data included. The impact of electric vehicles on the ERCOT grid is also modeled.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Optimization Competition on Synthetic and Industrial Power Systems

This paper summarizes a grid optimization (GO) competition effort in the United States to find the best solution strategies for up to interconnect-scale power system networks with around 32,000 buses. The optimization problem is a mixedinteger, non-convex non-linear problem, (MINLP) and includes discrete variables such as unit commitment and line switching, control settings (transformer taps and phase shifters with impedance correction tables), and bus shunts. The case study includes six actual industry grids as well as 16 realistic synthetic grids created by three different dataset teams. The winners are selected and ranked based on scoring criteria, which consider the solution quality (such as objective functions) within time limits. Nine winner teams are selected from 26 competitor teams. The results achieved by different teams are described and the performance of different algorithms on synthetic grids and actual industry grids are compared and analyzed.

mixed-integer non-linear programming↗