DOE OSTI · 2563427
Scalable Truck Charging Demand Simulation for Cost-Optimized Infrastructure Planning
Abstract
This project developed a scalable, high-resolution model to simulate medium- and heavy-duty (MHD) electric truck charging demand and assess its impact on grid infrastructure. Using generative modeling, simulation, and cost optimization, the project delivered an end-to-end software pipeline and a library of 96 real-world scenarios for the Dallas–Houston megaregion. We demonstrated a modular architecture for transportation and grid modeling, implemented cost-optimized infrastructure planning methods, and quantified grid capital, operational, and environmental costs across a wide range of truck electrification scenarios. The results have been adopted by major utility stakeholders and contributed to regional planning efforts.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Xu, Yanzhi, Snodgrass, Jonathan, Overbye, Thomas, Finch, Patrick, Safdarian, Farnaz, Wallison, Diana, Das, Siddharth, Patil, Priyadarshan. 2025-04-30. Scalable Truck Charging Demand Simulation for Cost-Optimized Infrastructure Planning. https://doi.org/10.2172/2563427
Cite the original work for its findings. Save a collection to share your selection of sources.