Publications and source records attributed to Stewart, Kevin.

Prefabricated Zero Ascend Omnispecies (ZAO) Modular Fish Passage Modules Using Advanced Manufacturing Techniques

The Zero Ascend Omnispecies (ZAO) fish passage attraction module “ZAO Attractor” is a novel system designed to facilitate upstream passage for a broad spectrum of fish species, with a particular focus on American shad and river herring (alewife and/or blueback herring). Combining the use of prefabricated, modular components with advanced manufacturing, the ZAO aims to provide a cost-effective and scalable solution for fish passage attractions across various hydropower sites. The system features a surface level entry, so fish do not need to climb. In addition, it is designed to be adjusted and repositioned to create the most effective attraction flows by managing the outflows from hydropower turbines. Budget Period 1 (BP1) focused on the design and modeling of the ZAO Attractor and demonstrated the engineering feasibility of a modular, prefabricated, hydrodynamically efficient structure with surface level entry and passage. It was discovered that there were limited published studies on the direct correlation between quantified flow patterns and fish attraction, emphasizing the need for controlled studies to observe and measure these effects. In Budget Period 2 (BP2), controlled studies with live fish were prioritized to address these complexities. In conclusion, the ZAO fish passage attraction module presents a promising approach to fish passage at hydropower stations, with the potential to balance environmental concerns with renewable energy development. However, further field validation and optimization are necessary to ensure its effectiveness and practicality in real-world applications.

13 HYDRO ENERGY↗

Cost of Fish Exclusion Technologies for Hydropower

This dataset compiles data on the costs of environmental mitigations related to fish exclusion for 35 hydropower projects based on documents obtained from the U.S Federal Energy Regulatory Commission (FERC). Data for all measures and their associated project-specific information, including installed and hydraulic capacities, were manually extracted from environmental impact statements and/or environmental assessment (EIS/EA) documents. All data were consolidated in a comma-separated (.csv) file, referred to as the Cost of Fish Exclusion Technologies for Hydropower Database.

13 HYDRO ENERGY↗

Restoration Hydro: A Watershed Approach to Standard Modular New Hydropower

The objectives of FOA DE- FOA-0001836- “Standard Modular Hydropower” included designing a standardized, modular, and environmentally compatible hydropower schematic for implementation in greenfield sites that generate up to 10 MW of capacity. Utilizing funds competitively awarded under DOE’s Water Power Technologies Office, the Natel Energy team developed a concept for modular new stream reach (NSR) hydropower that incorporates multi species upstream and downstream fish passage, improved river channel connectivity, and recreational modules. The in-stream design of the collective modules minimized site specific design and maximized the opportunities for modularity. Financial data was also presented using actual costs from regional suppliers, with figures provided in 2022 dollars. While the project team did not address potential permitting process improvements, the site selection criteria did consider established barriers to hydropower development such as tribal and preserved lands, interconnection proximity, and endangered species to exclude or deprioritize. The project’s design schematic met the objectives of the FOA, and presented a unique solution that targets alluvial pockets as natural features for sustainable development. Natel’s concept also incorporated the company's fish-safe Restoration Hydro Turbine for safe downstream passage, while featuring a rock arch that integrates fish passage, water, recreation, and grade control modules (including sediment). Alignment with the Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) “Innovative Design Concepts for Standard Modular Hydropower and Pumped-Storage Hydropower” Program: According to the Hydropower Vision (DOE, 2016), approximately 16 GW of hydropower growth is possible with the development of technology solutions that balance efficiency, economics, and environmental sustainability. The desired outcome of the SMH program is transformational innovation specifically in the site identification, conceptual, and detailed design phases of technology development lifecycles (DOE, 2018). In developing the SMH design schematic, the team aimed to address the opportunities outlined in the Vision through an inverted design philosophy; rather than singularly prioritizing efficiency and power production, the team focused on integrating hydropower with restoration of degraded streams to optimal ecosystem function and provision of exceptional recreation value as design criteria. To achieve this, Restoration Hydro incorporates the principles of nature-based engineering (WWAP, 2018) and biomimicry (Biomimicry NL.) to strategically deploy complementary combinations of permanent, semi-permanent, and ephemeral low-head structures - such as natural and engineered log jams - that harness geomorphological and hydrological processes at the landscape-scale. Primary applications of Restoration Hydro include: 1) restoration of degraded watersheds’ natural ecological function and enhancement of hydrological connectivity; and 2) creation of associated co-benefits to hydro production, including increased groundwater recharge, improved sediment transport and management, improved water security and water quality. Restoration Hydro projects build upon proven watershed restoration engineering techniques by integrating hydropower turbines into low-head structures using innovative and evolving civil works concepts that facilitate fish and sediment passage, and in some cases create additional revenue-generating recreational opportunities. Powering low-head structures creates a directly monetizable layer of economic value in the form of flexible, reliable, renewable energy on top of the already high-value water, environmental and recreational benefits of watershed and river restoration. The approach aims to create a virtuous, self-reinforcing cycle whereby Restoration Hydro projects support the scaling of ecosystem restoration activities, creating a water-energy-carbon multiplier effect that, through the principles of adaptive change management: 1) improves the resilience of landscapes and downstream population centers for changing hydrological cycles; 2) creates a reliable energy resource that facilitates the integration of intermittent renewable power sources into grids; and 3) supports climate change mitigation through grid decarbonization and enhanced ecosystem carbon capture and retention.

13 HYDRO ENERGY↗

Prefabricated Standard Modular Hydropower Installations for Low-cost Small Hydropower

The goal of the present project was to investigate the potential savings in greenfield hydropower project costs across sites having vastly different characteristics. Littoral Power Systems, Inc. (LPS) undertook the project described herein to explore the promise of Standard Modular Hydropower (SMH) to transform the processes of site identification, conceptual design, detailed design, and construction planning to support low- cost, environmentally attractive development of small hydropower facilities at new stream- reaches. This report includes descriptions of the work to develop these processes, the resulting facility designs achieved using these processes and the projected economics. Installation cost estimates for the resulting conceptual greenfield facility design at two different locations come in at $\$3,419$/kW for Balcony Falls and $\$2,124$/kW for LPS 566. The installation time from site preparation to commissioning-ready is estimated to be 58 weeks for the conceptual facility at Balcony Falls and 42 weeks for the conceptual facility at LPS 566. A real challenge to any hydropower facility – not only the two cases studied here – is that environmental and social conditions can change, and as such, the facility may be required to change. The h-Modulor modules connect uniquely and are structurally independent, enabling site configurations to be changed on the fly, as needed. These results show that LPS's h-Modulor SMH approach delivers an attractive balance between efficiency, economics, and environmental sustainability for small hydro greenfield sites.

13 HYDRO ENERGY↗

Pumped Storage Hydropower Valuation Guidebook: A Cost-Benefit and Decision Analysis Valuation Framework

As an energy storage technology, pumped storage hydropower (PSH) supports various aspects of power system operations. However, determining the value of PSH plants and their many services and contributions to the system has been a challenge. While there is a general understanding that PSH resources provide many services and benefits for the operation of power systems, estimating the value of these services—and especially the monetary value of some of those services—has been a challenge. The objective of this project, funded by the U.S. Department of Energy’s (DOE’s) Water Power Technologies Office (WPTO), is to advance the state of the art in assessing the value of PSH plants and their contributions to the power system. The specific goal is to develop detailed, step-by-step valuation guidance that PSH developers, plant owners or operators, and other stakeholders can use to assess the value of existing or potential new PSH plants and their services. The specific goals of this project are: (1) to develop comprehensive and transparent valuation guidance that will support consistent valuation assessments and comparisons of PSH projects or project design alternatives, (2) to test the PSH valuation guidance and its underlying methodology by applying it to two selected PSH projects, and (3) to transfer and disseminate the PSH valuation guidance to the hydropower industry, PSH developers, and other stakeholders. The authors believe that the application of a consistent, transparent, and repeatable valuation process will advance valuation assessments and allow stakeholders to compare valuation analyses performed for different PSH projects or design alternatives. It will also increase the acceptance of valuation results and enable better understanding of the true value that PSH technology brings to the grid.

13 HYDRO ENERGY↗

Pumped Storage Hydropower FAST Commissioning Technical Analysis

This report is designed to address barriers and solutions to modern pumped storage hydropower (PSH) development by establishing baseline project development knowledge, defining key aspects of project development, and identifying opportunities to reduce project timelines, costs, and risks. This report’s scope includes post-licensing activities and excludes factors related to permitting or licensing. The U.S. PSH fleet is composed of 43 projects providing the majority (95%) of utility-scale electricity storage in the US. However, only one new PSH facility has become operational in the past 20 years. Several factors contribute to diminishing PSH growth in the US, including the magnitude of project costs and financing interest during development and construction; the length of time from project investment until project revenue; permitting challenges and construction risks; competition from other storage technologies; and unrecognized energy storage valuation. Although innovative PSH concepts (including underground, small, and modular systems) have been investigated, widespread application has yet to occur. In short, the time, cost, and risk associated with modern PSH development has resulted in limited recent growth in the United States, despite the rising energy storage demand from increased deployment of variable renewable technologies. To address these challenges, the US Department of Energy’s (DOE) Water Power Technologies Office initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning project, aimed at catalyzing new solutions, designs, and strategies to accelerate PSH development. This report uses available data from previous license applications, ongoing project cost data, and other global PSH project information based on a typical closed-loop PSH project.

13 HYDRO ENERGY↗

Vision Road Map Reference Database

Much research is being conducted at national laboratories and industry with the aim of advancing the field of hydropower. However, there is no quantifiable way to identify where these efforts overlap and where they fall short. The authors of this database and associated report have created a database and categorization structure that classifies hydropower-focused activities and allows end users to submit queries to obtain information regarding research being conducted across various hydropower institutions. This effort includes 2,023 database reports classified using the Hydropower Vision Roadmap (RM) structure.

Vision, HydroSource↗

Predicting Total Dissolved Gas Travel Time in Hydropower Reservoirs

Large spills at hydropower facilities can produce environmentally unfavorable supersaturated total dissolved gas (TDG) conditions. Enhanced coordination between adjacent hydropower facilities is required when a large, brief spill creates a pulse of TDG that is transported into a downstream reservoir. A premium is placed on quick and simple methods and relationships that can support short-term decision making under dynamic conditions. This paper presents an empirically-based methodology to quantify and assess the relationship between mean hourly river flow and TDG travel time between an upstream hydropower spillway and a downstream dam. The analysis is conducted for reservoirs in the mid-Columbia River system and is limited to summer months when spill events that create high TDG are most common. A two-step filter and cross-correlation procedure is used to isolate high strength TDG events and characterize the time delay between when the TDG event is initiated upstream and when it is detected downstream. Spill flow, powerhouse flow, and TDG measurements are used to develop a bulk parameter estimation of mean TDG time delay as a function of mean river flow. The approach reveals an inverse power law relationship between mean river flow and mean TDG travel time. The relationship provides hydropower operators with a new, simplified decision support tool. In conclusion, the generalized methodology could be applied to other reservoir systems where TDG minimization is a critical management objective.

54 ENVIRONMENTAL SCIENCES↗

Development and Implementation of an Optimization Model for Hydropower and Total Dissolved Gas in the Mid-Columbia River System

Managing energy, water, and environmental priorities and constraints within a cascade hydropower system is a challenging multiobjective optimization effort that requires advanced modeling and forecasting tools. Within the mid-Columbia River system, there is currently a lack of specific solutions for predicting how coordinated operational decisions can mitigate the impacts of total dissolved gas (TDG) supersaturation while satisfying multiple additional policy and hydropower generation objectives. In this study, a reduced-order TDG uptake equation is developed that predicts tailrace TDG at seven hydropower facilities on the mid-Columbia River. The equation is incorporated into a general multiobjective river, reservoir, and hydropower optimization tool as a prioritized operating goal within a broader set of system-level objectives and constraints. A test case is presented to assess the response of TDG and hydropower generation when TDG supersaturation is optimized to remain under state water-quality standards. Satisfaction of TDG as an operating goal is highly dependent on whether constraints that limit TDG uptake are implemented at a higher priority than generation requests. According to the model, an opportunity exists to reduce TDG supersaturation and meet hydropower generation requirements by shifting spillway flows to different time periods. In conclusion, a coordinated effort between all project owners is required to implement systemwide optimized solutions that satisfy the operating policies of all stakeholders.

13 HYDRO ENERGY↗

The Integrated Basin-Scale Opportunity Assessment Initiative, FY 2011 Year-End Report: Deschutes Basin Preliminary Hydropower Opportunity Assessment. Draft Report

This document reports on first-year progress of the Integrated Basin-Scale Opportunity Assessment Initiative, an action item of the March 24, 2010 Sustainable Hydropower Memorandum of Understanding (MOU) between the U.S. Department of Energy (DOE), U.S. Army Corps of Engineers, and the Bureau of Reclamation. As envisioned in the MOU, an integrated basin-scale opportunity assessment would take a system-scale approach to identifying opportunities and actions to both increase hydropower and enhance environmental conditions within the context of existing water uses in river basins of the United States. Assessments are intended to be collaborative processes that work with stakeholders at the basin scale to identify hydropower and environmental opportunity scenarios. Opportunity scenarios are analyzed, again in collaboration with stakeholders, through modeling and visualization software to assess tradeoffs and system-scale effects. Opportunity assessments are not intended to produce decisional documents or substitute for basin planning processes; assessments are instead intended to provide tools, information, and a forum for catalyzing conversation about scenarios where environmental and hydropower gains can both be realized within a given basin. In fiscal year 2011, DOE’s Energy Efficiency and Renewable Energy Water Power Team provided funding to Pacific Northwest National Laboratory, Oak Ridge National Laboratory, and Argonne National Laboratory to develop an assessment approach and toolbox, and carry out an initial pilot opportunity assessment. In February 2011, the Upper Deschutes/Crooked River Basin in central Oregon was selected as the pilot basin. Through establishment of stakeholder working groups, a technical site visit, a series of interviews, a stakeholder workshop, and identification of existing tools and data sets, initial opportunities have been identified and analytical tools selected to explore opportunity scenarios. This report documents project progress to date, describes the opportunity assessment approach, and establishes an agenda for analysis of stakeholder-identified opportunities in fiscal year 2012. Findings presented here are preliminary; the final Deschutes Basin pilot study report will be submitted at the end of fiscal year 2012.

13 HYDRO ENERGY↗