The goal of the present project was to investigate the potential savings in greenfield hydropower project costs across sites having vastly different characteristics. Littoral Power Systems, Inc. (LPS) undertook the project described herein to explore the promise of Standard Modular Hydropower (SMH) to transform the processes of site identification, conceptual design, detailed design, and construction planning to support low- cost, environmentally attractive development of small hydropower facilities at new stream- reaches. This report includes descriptions of the work to develop these processes, the resulting facility designs achieved using these processes and the projected economics. Installation cost estimates for the resulting conceptual greenfield facility design at two different locations come in at $\$3,419$/kW for Balcony Falls and $\$2,124$/kW for LPS 566. The installation time from site preparation to commissioning-ready is estimated to be 58 weeks for the conceptual facility at Balcony Falls and 42 weeks for the conceptual facility at LPS 566. A real challenge to any hydropower facility – not only the two cases studied here – is that environmental and social conditions can change, and as such, the facility may be required to change. The h-Modulor modules connect uniquely and are structurally independent, enabling site configurations to be changed on the fly, as needed. These results show that LPS's h-Modulor SMH approach delivers an attractive balance between efficiency, economics, and environmental sustainability for small hydro greenfield sites.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Duquette, David J., Cook, Ryan, Leighton, Katherine, Jacobson, Paul, Cox, Chad, Wang, Bin, Amaral, Steve, Allen, Gregory, Challa, Ravi, Stewart, Kevin, Oladosu, Gbadebo. 2022-10-28. Prefabricated Standard Modular Hydropower Installations for Low-cost Small Hydropower. https://doi.org/10.2172/1997317

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Validation of the NLR Pumped Storage Hydropower Cost Model

The National Laboratory of the Rockies (NLR) first released its pumped storage hydropower (PSH) cost model in 2023 as the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The PSH cost model cannot replace detailed site-level studies and design, but it is important to validate it against other industry PSH cost estimates. The initial model methodology report validated the cost model for a single proposed site, the Eagle Mountain Project in California. This slide deck documents an expanded validation exercise using cost data from six other sites: Goldendale (Washington), Seminoe (Wyoming), Gordon Butte (Montana), Swan Lake (Oregon), White Pine (Oregon), and Lewis Ridge (Kentucky). It compares itemized costs from Federal Energy Regulatory Commission (FERC) applications and other reported costs with NLR PSH cost model outputs after customizing inputs for each site. The validation exercise finds that the NLR model's conservative indirect cost assumptions often drive overall cost overestimation, with direct cost comparisons typically agreeing more closely. All cost model estimates are well within an Association for the Advancement of Cost Engineering (AACE) Class 5 estimation range (-50% to +100%), with five within the AACE Class 4 range (-30% to +50%) and four being within 15%. This result is considered reasonable performance for a parametric model applied at a preliminary design stage.

13 HYDRO ENERGY↗

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY↗

Staying Current: A Community Readiness Framework for Marine Energy Applied to River Current Energy in Alaska

Marine energy-including wave, tidal, and river current energy-can provide a local energy source for rural and remote communities. Marine energy has the potential to bolster self-sufficiency and create economic opportunities while preserving ecological integrity. Communities may be interested in deploying, testing, and advancing these early-stage technologies to meet their needs. However, limited capacity, workforce constraints, and other barriers can challenge development. To better understand a community's interest in and preparedness for marine energy, we developed a suite of 150 'metrics of readiness.' Organized across seven categories-technical, social, environmental, strategic, governance, economic, financial-and 29 subcategories, the metrics provide a holistic perspective beyond the technical aspects of an energy device. We conducted a desktop application of the metrics of readiness for Igiugig, Alaska. The metrics were applied retrospectively for two points in time: before (2009) and after (2018) in-stream testing of a river current energy device. By documenting changes among categories and subcategories of the metrics, our results show the evolving nature of community readiness for river current energy. They also illustrate how our interdisciplinary framework captures the investment in environmental effects research and commitment to strategic planning that occurred in Igiugig. In future applications, we envision the framework could be used to foster public engagement in marine energy, collaborate with communities in project development, shape capacity building activities, prioritize investments, and inform research needs. While our study focuses on enabling river current energy in Alaska, the metrics of readiness have the potential to inform implementation of other renewable technologies with communities in new geographies.

13 HYDRO ENERGY↗