Search NASA⌕ Search

Engineering topics

Timothy M Jellett

Publications and source records attributed to Timothy M Jellett.

KSC Child Development Center (PRL 149) Confirmatory Sampling Report and Interim Measures Work Plan

The National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) permit requires identification and evaluation of known Solid Waste Management Units (SWMU) located at the Kennedy Space Center (KSC). The KSC Child Development Center (KCDC), the “site,” is designated as potential release location (PRL) 149 under the NASA RCRA permit. This report summarizes the results of the Confirmatory Sampling (CS) activities carried out on March 19, 2022, and May 16, 2023, at KCDC, PRL 149, KSC, Florida. This report additionally presents the results of an assessment conducted between July 7 and July 27, 2023, to determine whether construction activities in 2023 to replace certain playground equipment and the rubberized play surface released arsenic (As) contaminated soil.

CDC↗

Monitoring Well Installation Completion Report for Ransom Road Landfill, Vertical Processing Facility, and Environmental Health Facility, Solid Waste Management Units: 003, 077, and 079

The intended purpose of the Monitoring Well Installation project is to support the Kennedy Space Center (KSC) Environmental Remediation Department’s Resource Conservation and Recovery Act Program by installing new monitoring wells. The wells are installed in accordance with the Brevard County Health Department and St. Johns River Water Management Districts rules and guidelines.

Well Installation↗

KSC Child Development Center (Potential Release Location 149) Confirmatory Sampling Report and Interim Measures Work Plan

This Confirmatory Sampling (CS) Report and Interim Measures (IM) Work Plan was prepared for the National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), Florida, by HydroGeoLogic, Inc. (HGL) under Contract Number 80KSC019D0012, Task Order 80KSC019F0118. This document presents the results of the CS activities performed in March 2022, and May 202, at the KSC Child Development Center (KCDC), Potential Release Location (PRL) 149, KSC, Florida. This report additionally presents the results of an assessment conducted in July 2023 to determine whether construction activities in 2023 to replace certain playground equipment and the rubberized play surface allowed soil contaminated by arsenic (As) to migrate from beneath the play surface.

arsenic↗

Monitoring Well Abandonment Completion Report for KARS Park1, Mobil Service Station, and Hypergol Maintenance Material North Solid Waste Management Units: 084, 093, and 090

The intended purpose of the Monitoring Well Abandonment project is to support the Kennedy Space Center (KSC) Environmental Remediation Department’s Resource Conservation and Recovery Act Program by abandoning monitoring wells throughout KSC that have been identified and prioritized as locations that no longer serve usefulness to program. The monitoring wells were abandoned in accordance with the Brevard County Health Departments and St. Johns River Water Management Districts rules and guidelines.

Timothy M Jellett↗