Future Circular Collider Feasibility Study Report

In response to the 2020 Update of the European Strategy for Particle Physics , the Future Circular Collider (FCC) Feasibility Study was launched as an international collaboration hosted by CERN. This report describes the FCC integrated programme , which consists of two stages: an electron-positron collider (FCC-ee) in the first phase, serving as a high-luminosity Higgs, top, and electroweak factory; followed by a proton-proton collider (FCC-hh) at the energy frontier in the second phase. The FCC-ee is designed to operate at four key centre-of-mass energies: the Z pole, the WW pair production threshold, the ZH production peak, and the top/anti-top production threshold—each delivering the highest possible luminosities to four experiments. Over 15 years of operation, FCC-ee will produce more than 6 trillion Z bosons, 200 million WW pairs, nearly 3 million Higgs bosons, and 2 million top anti-top pairs. Precise energy calibration at the Z pole and WW threshold will be achieved through frequent resonant depolarisation of pilot bunches. The sequence of operation modes between the Z, WW, and ZH substages remains flexible. The FCC-hh will operate at a centre-of-mass energy of approximately 85 TeV—nearly an order of magnitude higher than the LHC—and is designed to deliver 5 to 10 times the integrated luminosity of the upcoming High-Luminosity LHC. Its mass reach for direct discovery extends to several tens of TeV. In addition to proton-proton collisions, the FCC-hh is capable of supporting ion-ion, ion-proton, and lepton-hadron collision modes. This second volume of the Feasibility Study Report presents the complete design of the FCC-ee collider, its operation and staging strategy, the full-energy booster and injector complex, required accelerator technologies, safety concepts, and technical infrastructure. It also includes the design of the FCC-hh hadron collider, development of high-field magnets, hadron injector options, and key technical systems for FCC-hh.

Benedikt, M. [European Organization for Nuclear Re↗

Future Circular Collider Feasibility Study Report

Volume 3 of the FCC Feasibility Report presents studies related to civil engineering, the development of a project implementation scenario, and environmental and sustainability aspects. The report details the iterative improvements made to the civil engineering concepts since 2018, taking into account subsurface conditions, accelerator and experiment requirements, and territorial considerations. It outlines a technically feasible and economically viable civil engineering configuration that serves as the baseline for detailed subsurface investigations, construction design, cost estimation, and project implementation planning. Additionally, the report highlights ongoing subsurface investigations in key areas to support the development of an improved 3D subsurface model of the region. The report describes the development of the project scenario based on the ‘avoid-reduce-compensate’ iterative optimisation approach. The reference scenario balances optimal physics performance with territorial compatibility, implementation risks, and costs. Environmental field investigations covering almost 600 hectares of terrain—including numerous urban, economic, social, and technical aspects—confirmed the project’s technical feasibility and contributed to the preparation of essential input documents for the formal project authorisation phase. The summary also highlights the initiation of public dialogue as part of the authorisation process. The results of a comprehensive socio-economic impact assessment, which included significant environmental effects, are presented. Even under the most conservative and stringent conditions, a positive benefit-cost ratio for the FCC-ee is obtained. Finally, the report provides a summary of the studies conducted to document the current state of the environment.

Benedikt, M. [European Organization for Nuclear Re↗

AUP First Pre-Series Cryo-Assembly Design Production and Test Overview

New high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) have been built and tested as part of the high-luminosity upgrade of the Large Hadron Collider (HL-LHC). These new quadrupole magnets are based on Nb3Sn superconducting technology. The US Accelerator Upgrade Project (US-AUP) is producing the Q1 and Q3 Cryo-Assemblies: a pair of ~5 m long magnet structures installed in a stainless-steel helium vessel (Cold Mass) and surrounded by cryostat shields, piping, and a vacuum vessel. In conclusion, this paper gives an overview of the design, production, and the results of the horizontal test of the first pre-series Q1/Q3 Cryo-Assembly.

43 PARTICLE ACCELERATORS↗

Analysis of the MQXFA Low Beta Quadrupoles for HL-LHC after 50% magnet assembly complete +

The US HL-LHC Accelerator Upgrade Project (AUP) is fabricating the MQXFA magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC (HL-LHC). This is the first production of Nb3Sn magnets for a particle accelerator, together with the MQXFB magnets for Q2a and Q2b. Here we show status and some results of MQXFA magnets fabrication and vertical test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Optimizing the use of pressurized bladders for the assembly of HL-LHC MQXFB magnets

The use of pressurized bladders for stress control of superconducting magnets was firstly proposed at Lawrence Berkeley National Laboratory in the early 2000s. Since then, the so-called ‘bladders and keys’ procedure has become one of the reference techniques for the assembly of high-field accelerator magnets and demonstrators. Exploiting the advantages of this method is today of critical importance for Nb$_{3}$Sn-based accelerator magnets, whose production requires the preservation of tight stress targets in the superconducting coils to limit the effects of the strain sensitivity and brittleness of the conductor. The present manuscript reports on the results of an experimental campaign focused on the optimization of the ‘bladders and keys’ assembly process in the MQXFB quadrupoles. These 7.2 m long magnets shall be among the first Nb$_{3}$Sn cryomagnets to be installed in a particle accelerator as a part of the High Luminosity upgrade of the LHC. One of the main practical implications of the bladders technique, especially important when applied to long magnets like MQXFB, is that to insert the loading keys, the opening of a certain clearance in the support structure is required. The procedure used so far for MQXF magnets involved an overstress in the coils during bladder inflation. The work presented here shows that such an overshoot can be eliminated thanks to additional bladders properly positioned in the structure. This optimized method was validated in a short model magnet and in a full-length mechanical model, becoming the new baseline for the series production at CERN. Furthermore, the results are supported by numerical predictions using finite element models.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Status and Challenges of the Interaction Region Magnets for HL-LHC

About one hundred magnets of six different types shall be installed in the High Luminosity LHC (HL-LHC) in the years 2026-2028 at CERN. The magnets design, construction and test are based on CERN collaborations with institutes and industrial partners in USA, Spain, Italy, Japan and China. Three types of correctors are based on Nb-Ti technology and feature conductor peak fields in the 2 to 4 T range: for all of them the prototype phase has been successfully completed. The production is well advanced for the superferric correctors, and is starting for the canted cosine theta correctors and for the nested correctors. The separation and recombination Nb-Ti dipoles D1 and D2, with a 4.5-6 T bore field range, are both in the prototype phase after the completion of the short model program. The most challenging magnet, the Nb 3 Sn quadrupole with conductor peak field above 11 T, is in the prototype phase at CERN and halfway through the production phase in the USA. In this paper we will give, for each type of magnet, an overview of the main achievements obtained so far and we will outline the technical points still needing validation from the prototype program.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Analysis of MQXFA07 Test Non-Conformity

MQXFA07 did not meet acceptance requirement during vertical test. This report presents the analysis of MQXFA07 components related to the limited test performance, and the damage mechanism as it was understood by the MQXFA team.

43 PARTICLE ACCELERATORS↗

Design of the Fermilab Pre-Series Cold Mass for the HL-LHC Accelerator Upgrade Project

Here as part of the U.S. contribution to the HL-LHC Accelerator Upgrade Project (AUP), Fermilab is designing and building cold masses suitable for use in the LHC interaction regions. The cold mass provides a vacuum-tight helium enclosure for the magnets. Two magnets are aligned both axially and in cross section at Fermilab based on survey and warm magnetic measurements. Bus work and instrumentation is added. A welded stainless steel vacuum-tight shell surrounds the two magnets, and the structure is prepared for insertion into the cryostat. This paper summarizes the design of the cold mass including alignment, bus work, weld details, and instrumentation.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Assembly and Pre-Loading Specifications for the Series Production of the Nb 3 Sn MQXFA Quadrupole Magnets for the HL-LHC

We report the High Luminosity LHC (HL-LHC) Project is planning to install 16 cold-masses made with Nb 3 Sn quadrupole magnets in the LHC Interaction Regions to significantly increase its luminosity. Half of these cold masses are fabricated at BNL, FNAL, and LBNL under the US Accelerator Research Program (AUP). Each cold mass includes two identical Nb 3 Sn quadrupole magnets, called MQXFA with a magnetic length of 4.2 m. Currently, the AUP project has completed the fabrication and test of the first 5 pre-series magnets, and is working on the following 16 magnets for the series production. The brittleness and strain sensitivity of the Nb 3 Sn superconducting material requires a careful definition of the allowable maximum stress in the windings during magnet assembly and pre-load, and a tight control of their variation within the whole coil length. Therefore, a series of assembly and pre-load specifications have been defined with the goals of minimizing the risk of conductor degradation and providing the mechanical support required to reach the nominal current during powering. In this paper we present the specifications defined for the MQXFA magnets and applied during the different assembly phases and during the pre-load process of the first 5 pre-series magnets.

43 PARTICLE ACCELERATORS↗

US HL-LHC Accelerator Upgrade Project, Acceptance Criteria Part A: MQXFA Magnet

This document specifies the functional requirements for the MQXFA magnet readapted for the American contribution. If all the requirements specified in this document are met, then the U.S. HL-LHC AUP MQXFA deliverables will be accepted by CERN for the HL-LHC project. Another separate document will be issued by the American contribution for the MQXFA cold mass functional requirements. Please note that the definition of threshold as it is being used by the American contribution is not the same as objective, according to the HL-LHC quality policy.

42 ENGINEERING↗