Search NASA⌕ Search

Engineering topics

Verdu-Andres, S.

Publications and source records attributed to Verdu-Andres, S..

At least 19 records

The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

Thermal simulation of the EIC HSR interconnect module - RF fingers

The Electron Ion Collider (EIC) Hadron Storage Ring (HSR) will reuse most of the existing superconducting magnets from the RHIC storage ring. However, the existing beam vacuum chamber and stripline BPMs will not be compatible with the planned EIC hadron bunches that will have a 3x higher intensity and be 10x shorter, and some operational scenarios with large radial offsets of the beam in the vacuum chamber. To address these challenges, a copper coated beam screen will be implemented, the existing RHIC stripline BPMs will be shielded and an interconnect module design, including new BPM will be installed adjacent to the existing BPMs. A thermal analysis of the new arc BPM interconnect housing has been conducted to assess the heating caused by beam induced resistive wall heating and electron cloud heating. An analysis of the BPM module has been made and reported separately. This report will focus on the other side of the interconnect module, containing the RF fingers.

43 PARTICLE ACCELERATORS↗

Mbtrack2 - Application on EIC 5GE V Electron Ring Reverse Phase Configuration

In this paper, we present a report on simulations conducted using the Mbtrack2 code for the 5GeV EIC Electron Storage Ring (ESR) RF system with a reversed phasing scheme. The Mbtrack2 code [1] has been thoroughly benchmarked, as described in references [2] and [3]. The simulation results presented in this paper include the beam loading effect but do not incorporate a feedback system.

43 PARTICLE ACCELERATORS↗

Electron cloud thresholds at the arcs of the Electron-Ion Collider hadron storage ring

The Electron-Ion Collider is designed to provide high-luminosity collisions. For the highest lu minosity scenario, the hadron storage ring will host a 275 GeV beam consisting of 1160 bunches with 6.9e10 protons per bunch. Previous work has found that some sections of the hadron storage ring will experience electron cloud buildup if their vacuum chamber does not show a sufficiently low secondary electron emission value. This technical note reviews the electron cloud growth thresholds for the updated screen profile and lattice.

43 PARTICLE ACCELERATORS↗

Beam Induced Heating Analysis Update for the EIC Vacuum Chamber Components

One of the challenges of designing the Electron-Ion Col lider (EIC) is to mitigate beam-induced heating due to the intense electron and hadron beams. Heating of the ESR vac uum chamber components is mainly due to beam-induced resistive wall (RW) losses and synchrotron radiation. For the HSR heating is mainly due to large radial offsets and heat conduction from room temperature to cryogenic tem perature for cryo-components. In this paper, we provide an update on the beam-induced heating and thermal analysis of some critical ESR vacuum chamber components, such as the ESR Large Angle Bremhustraulung Monitor (LABM). We also provide a similar update for critical HSR vacuum com ponents, including the cryo-cooled BPM button assembly, beam screen, abort kicker, and polarimeter. To perform the thermal analyses, the resistive wall loss on individual compo nents is calculated with CST and the synchrotron radiation (if exists) is evaluated using SynRad. These losses, along with realistic boundary conditions are then fed to ANSYS to determine the temperature distribution.

43 PARTICLE ACCELERATORS↗

Electron-Ion Collider Design Status

The Electron-Ion Collider (EIC) is being designed for construction at Brookhaven National Laboratory. Activities have been focused on beam-beam simulations, polarization studies, and beam dynamics, as well as on maturing the layout and lattice design of the constituent accelerators and the interaction region. The latest design advances will be presented.

43 PARTICLE ACCELERATORS↗

Thermal analysis of RHIC arc dipole magnet cold mass with EIC beam screen

The existing RHIC storage rings – including their superconducting magnet arcs – will be used for the hadron storage ring of the Electron-Ion Collider (EIC). The vacuum chamber of these magnets was not designed for the EIC hadron beams, with shorter bunches and of higher average current than the RHIC beams. With the current stainless steel beam pipe, the resistive-wall (RW) heating will exceed the dynamic heat load budget. Limiting the RW heating is important to prevent the superconducting magnets from quenching and to maintain a low screen temperature necessary to impede the rise of RW heating (higher resistance at higher temperature) as well as to achieve desired ultra-high vacuum. In addition, simulations predict the formation of electron cloud which would further contribute to the dynamic heat load and could compromise the quality and stability of the beam. To reduce the resistive-wall heating and suppress electron cloud, a beam screen will be installed in the vacuum chamber of the RHIC SC magnets. The screen will have a high RRR copper layer at its inner face – useful to reduce the resistive-wall impedance thanks to its high conductivity especially at cryogenic temperatures – and will be coated with a thin layer of amorphous carbon, a material with low secondary electron yield to suppress the formation of electron clouds. The baseline solution envisages a screen that will be cooled by thermal contact to the 4.55 K beam pipe. Detailed thermal analysis have been conducted in ANSYS 2020 for an arc dipole cold mass equipped with a beam screen in order to study the feasibility of a passively-cooled screen and guide its design. Temperature-dependent thermal conductivity properties of all materials in the operating (cryogenic) temperature range are considered. Suitable assumptions and simplifications are made to model the magnet coil and calculate its homogenized thermal conductivity. Sensitivity studies with respect to layer thicknesses and area of contact are carried out and results are presented.

43 PARTICLE ACCELERATORS↗

HOM DAMPER DESIGN FOR BNL EIC 197MHZ CRAB CAVITY

For the electron Storage Ring (ESR) of Brookhaven Na-tional Lab Electron Ion Collider (BNL EIC), beam loading is a great concern due to the high beam current together with abortion gap, especially for harmonic cavities due to higher operational frequency. There were attempts to use feedback/feedforward control, using multiple cavities with counter-phasing [1]. A straightforward way to lower beam loading effect is to design a cavity with low R/Q. In this paper, we show such a design for the 3rd harmonic cavity for BNL EIC ESR.

43 PARTICLE ACCELERATORS↗

A BEAM SCREEN TO PREPARE THE RHIC VACUUM CHAMBER FOR EIC HADRON BEAMS: CONCEPTUAL DESIGN AND REQUIREMENTS

The Electron Ion Collider (EIC) Hadron Storage Ring (HSR) will use the existing Relativistic Heavy Ion Collider storage rings, including the superconducting magnet arcs [1]. The vacuum chambers in the superconducting magnets and the cold mass interconnects were not designed for EIC beams and so must be updated to reduce resistive-wall heating and to suppress e-clouds. To do so without compromising the EIC luminosity goal, a stainless steel beam screen with colaminated copper and a thin layer of amorphous carbon will be installed. This paper describes the main requirements that our solution for the hadron ring vacuum chamber needs to satisfy, including impedance, aperture limitations, vacuum, thermal and structural stability, mechanical design, installation and operation. The conceptual design of the beam screen currently under development is introduced.

43 PARTICLE ACCELERATORS↗