Search NASASearch

Engineering topics

Verhey, Timothy R.

Publications and source records attributed to Verhey, Timothy R..

QualifiCation of the Flight Heaters for the NEXT-C Hollow Cathodes

After successful validation of the design, swaged cathode heaters have been delivered by the NASA Glenn Research Center to Aerojet Rocketdyne for the fabrication of the NEXT-C ion thruster . NASA Glenn Research Center re-established and validated process controls as well as completed cyclic life testing of development heaters. Following an extensive requalification program, fabrication of a flight batch of heaters was executed using the qualified process controls. Of the 28 heaters fabricated in this flight batch, a set of six heaters were acceptance and cyclic tested to verify conformance with operational requirements. Upon completion of 200 percent of the NEXT-C cyclic requirement, the heater batch was certified by NASA for use in the flight hollow cathodes. Nine heaters from the batch of 28 were provided to Aerojet Rocketdyne in early 2018 for cathode fabrication. This paper summarizes the acceptance and cyclic life testing of the flight heaters and preliminary findings of post-test analyses.

Arthur, Neil

Characterization of a Fixed-Volume Release System for Initiating an Arc Discharge in a Heaterless Hollow Cathode

Heaterless hollow cathodes may provide improved reliability, simplicity, and portability when compared with traditional heater-equipped hollow cathodes, traits which are well suited for low-power Hall-effect thrusters that are currently being developed for small satellite propulsion. Despite the advantages, there are concerns that the ignition process in heaterless hollow cathodes may impose an excessive burden on the propellant feed and/or electrical systems of a small satellite. To address this concern, a fixed-volume release flow protocol, which can be used to temporarily increase the propellant mass flow rate, was developed, modeled, and experimentally evaluated. The new protocol allowed for a heaterless hollow cathode to be ignited reliably with a moderate bias voltage and a minimal electrical power requirement. Specifically, a xenon fed heaterless hollow cathode was ignited with a 375 V bias using 17.3 mg of propellant. Repeating the tests with krypton showed that ignition could be achieved in the same heaterless hollow cathode assembly with a 300 V bias using 13.1 mg of propellant. We judge that a fixed-volume release system could be implemented in a satellite feed system while introducing minimal additional complexity.

Heaterless

Characterization of a Fixed-Volume Release System for Initiating an Arc Discharge in a Heaterless Hollow Cathode

Heaterless hollow cathodes may provide improved reliability, simplicity, and portability when compared with traditional heater-equipped hollow cathodes, traits which are well suited for low-power Hall-effect thrusters that are currently being developed for small satellite propulsion. Despite the advantages, there are concerns that the ignition process in heaterless hollow cathodes may impose an excessive burden on the propellant feed and/or electrical systems of a small satellite. To address this concern, a fixed-volume release flow protocol, which can be used to temporarily increase the propellant mass flow rate, was developed, modeled, and experimentally evaluated. The new protocol allowed for a heaterless hollow cathode to be ignited reliably with a moderate bias voltage and a minimal electrical power requirement. Specifically, a xenon fed heaterless hollow cathode was ignited with a 375 V bias using 17.3 mg of propellant. Repeating the tests with krypton showed that ignition could be achieved in the same heaterless hollow cathode assembly with a 300 V bias using 13.1 mg of propellant. We judge that a fixed-volume release system could be implemented in a satellite feed system while introducing minimal additional complexity.

Heaterless

Characterization of Propellant Flow and Bias Required to Initiate an Arc Discharge in a Heaterless Hollow Cathode

Heaterless hollow cathodes provide an opportunity to reduce complexity and improve reliability in electric propulsion systems. While removal of the heater has little effect on steady-state operation of a hollow cathode, it has a considerable effect on the ignition process. To successfully integrate a heaterless hollow cathode into a spaceflight electric propulsion system, it will be necessary to establish definitive requirements for the propellant feed and electrical subsystems so that ignition of a plasma discharge can be achieved reliably. The aim of this research was to form a better understanding of these requirements by performing an investigation of the propellant flow and voltage conditions required for the ignition of a plasma arc discharge. This aim was achieved by performing discharge initiation experiments using both a specially designed experimental apparatus and a functional heaterless hollow cathode assembly. It was demonstrated that there is a distinct difference in the voltage required to initiate a plasma discharge between two common electric propulsion propellants, xenon and krypton, which suggests that the developmental testing of heaterless hollow cathodes needs to be performed with the appropriate propellant gas species. Heaterless hollow cathode ignition experiments showed that the keeper orifice diameter has a strong effect on the voltage required to ignite a plasma discharge at a given propellant mass flow rate, while the effect of keeper-cathode separation distance was only strong at flow rates below 25 sccm (Xe).

Ham, Ryan K.

Qualification of the Flight Heaters for the NEXT-C Hollow Cathodes

After successful validation of the design, swaged cathode heaters have been delivered by the NASA Glenn Research Center to Aerojet Rocketdyne for the fabrication of the NEXT-C ion thruster. NASA Glenn Research Center re-established and validated process controls as well as completed cyclic life testing of development heaters. Following an extensive requalification program, fabrication of a flight batch of heaters was executed using the qualified process controls. Of the 28 heaters fabricated in this flight batch, a set of six heaters were acceptance and cyclic tested to verify conformance with operational requirements. Upon completion of 200 percent of the NEXT-C cyclic requirement, the heater batch was certified by NASA for use in the flight hollow cathodes. Nine heaters from the batch of 28 were provided to Aerojet Rocketdyne in early 2018 for cathode fabrication. This paper summarizes the acceptance and cyclic life testing of the flight heaters and preliminary findings of post-test analyses.

Arthur, Neil

Development of a High-Propellant Throughput Small Spacecraft Electric Propulsion System to Enable Lower Cost NASA Science Missions

This paper describes recent progress at the NASA Glenn Research Center (GRC) in the development and demonstration of an integrated high-propellant throughput small spacecraft electric propulsion (HT-SSEP) system based on a Hall-effect thruster. A center-mounted cathode and an innovative magnetic circuit topology were implemented in the design of the Hall-effect thruster to achieve high-propellant throughput, high performance, and efficient packaging. To minimize technical risk, the HT-SSEP development approach sought to limit design features and materials to those with a clear path-to-flight. A propellant throughput capability of greater than 100 kg at a minimum thruster efficiency of 50% was targeted. The proof-of-concept NASA-H64M laboratory model (LM) thruster was designed, fabricated, and tested at GRC in fiscal year 2018. The thruster development leveraged heritage Hall-effect thruster design and manufacturing processes wherever appropriate. Recent NASA advances in Hall-effect thruster technology were also leveraged. A scalable discharge power supply (DPS) capable of powering the H64M-LM was developed, then demonstrated as part of an integrated system test. The DPS uses commercial off-the-shelf components with spaceflight equivalents. A keeper supply with DC ignitor was breadboarded, then demonstrated with a laboratory cathode. Finally, feed system trade studies were performed to ascertain what feed system architecture might be appropriate for an HT-SSEP system. This paper details the motivations for the project, the development approach, the chosen sub-system architectures, design considerations, and test results.

Benavides, Gabriel F.

Development of a High-Propellant Throughput Small Spacecraft Electric Propulsion System to Enable Lower Cost NASA Science Missions

This paper describes recent progress at the NASA Glenn Research Center (GRC) in the development and demonstration of an integrated high-propellant throughput small spacecraft electric propulsion (HT-SSEP) system based on a Hall-effect thruster. A center-mounted cathode and an innovative magnetic circuit topology were implemented in the design of the Hall-effect thruster to achieve high-propellant throughput, high performance, and efficient packaging. To minimize technical risk, the HT-SSEP development approach sought to limit design features and materials to those with a clear path-to-flight. A propellant throughput capability of greater than 100 kg at a minimum thruster efficiency of 50% was targeted. The proof-of-concept NASA-H64M laboratory model (LM) thruster was designed, fabricated, and tested at GRC in fiscal year 2018. The thruster development leveraged heritage Hall-effect thruster design and manufacturing processes wherever appropriate. Recent NASA advances in Hall-effect thruster technology were also leveraged. A scalable discharge power supply (DPS) capable of powering the H64M-LM was developed, then demonstrated as part of an integrated system test. The DPS uses commercial off-the-shelf components with spaceflight equivalents. A keeper supply with DC ignitor was breadboarded, then demonstrated with a laboratory cathode. Finally, feed system trade studies were performed to ascertain what feed system architecture might be appropriate for an HT-SSEP system. This paper details the motivations for the project, the development approach, the chosen sub-system architectures, design considerations, and test results.

Benavides, Gabriel F.

Preparation for Hollow Cathode Testing for the Advanced Electric Propulsion System at NASA Glenn Research Center

NASA Glenn Research Center is performing activities to support the unique needs of hollow cathode development and testing for the Advanced Electric Propulsion System (AEPS). Three existing vacuum facilities have been outfitted as cathode test facilities, and each will serve a different role in upcoming testing. Vacuum Facility 67 is being developed to serve as a long-duration test facility for the Engineering Development Unit cathode, which is to be delivered by the AEPS contractor. It will feature a thruster-like magnetic field simulator and cold-cycle capability via a liquid nitrogen-cooled cold plate. Vacuum Facility 17 is being developed as a test facility for short- to medium-duration experiments in order to provide auxiliary support for the long-duration testing. It will feature a magnetic field simulator but not cold-cycling. Finally, Vacuum Facility 1 will be a high-pumping speed cathode development environment, and will feature an array of plasma and temperature diagnostics. In addition to the facility preparation work, a new cathode, referred to as the Mark II, has been designed. The Mark II is an evolution of the Technology Demonstration Unit cathodes that better evokes the geometry, fabrication, and construction of the forthcoming Engineering Development Unit. This cathode serves as a transition between the Technology Demonstration Unit cathodes used during early thruster development and the forthcoming Engineering Development Unit cathodes. It will be used as a means of verifying the new test facilities prior to arrival of Engineering Development Unit hardware. Details of the Mark II design and key features are presented, as well as details of future work to be performed.

Hall, Scott J.

Heater Validation for the NEXT-C Hollow Cathodes

Swaged cathode heaters whose design was successfully demonstrated under a prior flight project are to be provided by the NASA Glenn Research Center for the NEXT-C ion thruster being fabricated by Aerojet Rocketdyne. Extensive requalification activities were performed to validate process controls that had to be re-established or revised because systemic changes prevented reuse of the past approaches. A development batch of heaters was successfully fabricated based on the new process controls. Acceptance and cyclic life testing of multiple discharge and neutralizer sized heaters extracted from the development batch was initiated in August, 2016, with the last heater completing testing in April, 2017. Cyclic life testing results substantially exceeded the NEXT-C thruster requirement as well as all past experience for GRC-fabricated units. The heaters demonstrated ultimate cyclic life capability of 19050 to 33500 cycles. A qualification batch of heaters is now being fabricated using the finalized process controls. A set of six heaters will be acceptance and cyclic tested to verify conformance to the behavior observed with the development heaters. The heaters for flight use will be then be provided to the contractor from the remainder of the qualification batch. This paper summarizes the fabrication process control activities and the acceptance and life testing of the development heater units.

Verhey, Timothy R.

Heater Validation for the NEXT-C Hollow Cathodes

Swaged cathode heaters whose design was successfully demonstrated under a prior flight project are to be provided by the NASA Glenn Research Center for the NEXT-C ion thruster being fabricated by Aerojet Rocketdyne. Extensive requalification activities were performed to validate process controls that had to be re-established or revised because systemic changes prevented reuse of the past approaches. A development batch of heaters was successfully fabricated based on the new process controls. Acceptance and cyclic life testing of multiple discharge and neutralizer sized heaters extracted from the development batch was initiated in August, 2016, with the last heater completing testing in April, 2017. Cyclic life testing results substantially exceeded the NEXT-C thruster requirement as well as all past experience for GRC fabricated units. The heaters demonstrated ultimate cyclic life capability of 19050 to 33500 cycles. A qualification batch of heaters is now being fabricated using the finalized process controls. A set of six heaters will be acceptance and cyclic tested to verify conformance to the behavior observed with the development heaters. The heaters for flight use will be then be provided to the contractor. This paper summarizes the fabrication process control activities and the acceptance and life testing of the development heater units.

hollow cathodes

Photochemically Etched Construction Technology Developed for Digital Xenon Feed Systems

Electric propulsion systems are quickly emerging as attractive options for primary propulsion in low Earth orbit, in geosynchronous orbit, and on interplanetary spacecraft. The driving force behind the acceptance of these systems is the substantial reduction in the propellant mass that can be realized. Unfortunately, system designers are often forced to utilize components designed for chemical propellants in their electric systems. Although functionally acceptable, these relatively large, heavy components are designed for the higher pressures and mass flow rates required by chemical systems. To fully realize the benefits of electric propulsion, researchers must develop components that are optimized for the low flow rates, critical leakage needs, low pressures, and limited budgets of these emerging systems.

Otsap, Ben

Space Station Cathode Design, Performance, and Operating Specifications

A plasma contactor system was baselined for the International Space Station (ISS) to eliminate/mitigate damaging interactions with the space environment. The system represents a dual-use technology which is a direct outgrowth of the NASA electric propulsion program and, in particular, the technology development efforts on ion thruster systems. The plasma contactor includes a hollow cathode assembly (HCA), a power electronics unit, and a xenon gas feed system. Under a pre-flight development program, these subsystems were taken to the level of maturity appropriate for transfer to U.S. industry for final development. NASA's Lewis Research Center was subsequently requested by ISS to manufacture and deliver the engineering model, qualification model, and flight HCA units. To date, multiple units have been built. One cathode has demonstrated approximately 28,000 hours lifetime, two development unit HCAs have demonstrated over 10,000 hours lifetime, and one development unit HCA has demonstrated more than 32,000 ignitions. All 8 flight HCAs have been manufactured, acceptance tested, and are ready for delivery to the flight contractor. This paper discusses the requirements, mechanical design, performance, operating specifications, and schedule for the plasma contactor flight HCAs.

Patterson, Michael J.

Microanalyses of extended-test xenon hollow cathodes

Four hollow cathodes have been examined using boroscopy, scanning electron microscopy, energy dispersive X-ray analysis, and X-ray diffraction analysis to characterize the life-limiting phenomena that resulted from their extended operation. The first pair of cathodes was operated for approximately 500 h in an ion thruster simulator at a 5.0 kW-equivalent power level using different cathode activation and propellant feed-system procedures. The second pair of cathodes was the main discharge cathode and neutralizer cathode from an ion thruster which have completed an 89-hour life-test at a 5.5 kW power level. The greatest change to the cathode condition was found to be removal of refractory metals, primarily tungsten, and their subsequent deposition on other cathode surfaces. Barium tungstate and barium molybdate were also found in all four cathodes. Criteria for improved cathode longevity and discharge operation are proposed for use in hollow cathode and full thruster testing facilities.

Verhey, Timothy R.

Microanalysis of extended-test xenon hollow cathodes

Four hollow cathode electron sources were analyzed via boroscopy, scanning electron microscopy, energy dispersive x ray analysis, and x ray diffraction analysis. These techniques were used to develop a preliminary understanding of the chemistry of the devices that arise from contamination due to inadequate feed-system integrity and improper insert activation. Two hollow cathodes were operated in an ion thruster simulator at an emission current of 23.0 A for approximately 500 hrs. The two tests differed in propellant-feed systems, discharge power supplies, and activation procedures. Tungsten deposition and barium tungstate formation on the internal cathode surfaces occurred during the first test, which were believed to result from oxygen contamination of the propellant feed-system. Consequently, the test facility was upgraded to reduce contamination, and the test was repeated. The second hollow cathode was found to have experienced significantly less tungsten deposition. A second pair of cathodes examined were the discharge and the neutralizer hollow cathodes used in a life-test of a 30-cm ring-cusp ion thruster at a 5.5 kW power level. The cathodes' test history was documented and the post-test microanalyses are described. The most significant change resulting from the life-test was substantial tungsten deposition on the internal cathode surfaces, as well as removal of material from the insert surface. In addition, barium tungstate and molybdate were found on insert surfaces. As a result of the cathode examinations, procedures and approaches were proposed for improved discharge ignition and cathode longevity.

Verhey, Timothy R.

Requirements for long-life operation of inert gas hollow cathodes: Preliminary report

An experimental investigation was initiated to establish conditioning procedures for reliable hollow cathode operation via the characterization of critical parameters in a representative cathode test facility. From vacuum pumpdown rates, it was found that approximately 1.5 hours were required to achieve pressure levels within 5 percent of the lowest attainable pressure for this facility, depending on the purge conditions. The facility atmosphere was determined by a residual gas analyzer to be composed of primarily air and water vapor. The effects of vacuum pumping and inert gas purging were evaluated. A maximum effective leakage rate of 2.0 x 10(exp -3)sccm was observed and its probable causes were examined. An extended test of a 0.64 cm diameter Mo-Re hollow cathode was successfully completed. This test ran for 504 hours at an emission current of 23.0 amperes and a xenon flow rate of 6.1 sccm. Discharge voltage rose continuously from 15 to 21 volts over the course of the test. The temperature of the cathode body during the test was relatively stable at 1160 C. Post-test examination revealed ion-bombardment texturing of the orifice plate to be the only detectable sign of wear on the hollow cathode.

Verhey, Timothy R.

5kW xenon ion thruster lifetest

This paper describes the results of the first lifetest of a high power ring-cusp ion thruster. A 30-cm laboratory model thruster was operated steady-state at a nominal beam power of 5kW on xenon propellant for approximately 900 hours. This test was conducted to identify life-limiting erosion mechanisms and thruster design modifications, and to demonstrate operation using simplified power processing. The results from this test are described including the conclusions derived from extensive post-test analyses of the thruster. Modifications to the thruster and ground support equipment, which have been incorporated to solve problems identified by the lifetest, are also described.

Patterson, Michael J.

Requirements for long-life operation of inert gas hollow cathodes - Preliminary results

An experimental investigation was initiated to establish conditioning procedures for reliable hollow cathode operation via the characterization of critical parameters in a representative cathode test facility. From vacuum pumpdown rates, it was found that approximately 1.5 hours were required to achieve pressure levels within 5 percent of the lowest attainable pressure for this facility, depending on the purge conditions. The facility atmosphere was determined by a residual gas analyzer to be composed of primarily air and water vapor. The effects of vacuum pumping and inert gas purging were evaluated. A maximum effective leakage rate of 2.0 x 10 (exp -3) sccm was observed and its probable causes were examined. An extended test of a 0.64 cm diameter Mo-Re hollow cathode was successfully completed. This test ran for 504 hours at an emission current of 23.0 amperes and a xenon flow rate of 6.1 sccm. Discharge voltage rose continuously from 15 to 21 volts over the course of the test. The temperature of the cathode body during the test was relatively stable at 1160 C. Post-test examination revealed ion-bombardment texturing of the orifice plate to be the only detectable sign of wear on the hollow cathode.

Verhey, Timothy R.

A 5-kW xenon ion thruster lifetest

The results of the first life test of a high power ring-cusp ion thruster are presented. A 30-cm laboratory model thruster was operated steady-state at a nominal beam power of 5 kW on xenon propellant for approximately 900 hours. This test was conducted to identify life-timing erosion modifications, and to demonstrate operation using simplified power processing. The results from this test are described including the conclusions derived from extensive post-test analyses of the thruster. Modifications to the thruster and ground support equipment, which were incorporated to solve problems identified by the lifetest, are also described.

Patterson, Michael J.