Search NASA⌕ Search

Engineering topics

Wall, Anna

Publications and source records attributed to Wall, Anna.

GeoRePORT Protocol Volume I: Background Document

The U.S. Department of Energy’s (DOE’s) Geothermal Technologies Office (GTO) uses various metrics to track and measure impacts of its funding meant to catalyze innovation and private investment. As an example, one GTO goal is to “accelerate development of…undiscovered hydrothermal resources” (Williams et al. 2008a). For goals to be useful, however, it is important to be able to develop and measure baseline values, as well as incremental improvements, both at the individual project and aggregated portfolio levels. This need was the driving force behind the development of the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT).

15 GEOTHERMAL ENERGY↗

GeoRePORT Protocol Volume II: Geological Assessment Tool

The GeoRePORT System is based on the concept that a geothermal system can be described both in terms of the quality of the geothermal resource as it relates to the potential to extract heat (resource grade) and the progress of research and development over the lifetime of the project (project readiness level). By assessing the major characteristics of a geothermal resource and categorizing the techniques used and how well the research technique was implemented, users can report a resource grade. The resource grade covers multiple geological, technological, and socioeconomic attributes that can be compared across play types and geothermal areas. Resource grade and project readiness level are reported for three assessment categories: geological, technical, and socioeconomic. This protocol document applies to the Geologic Assessment Tool and is intended for use with an excel-based spreadsheet tool, published separately.

15 GEOTHERMAL ENERGY↗

GeoRePORT (Geothermal Resource Portfolio Optimization & Reporting Technique)

The Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT) Protocol provides a system for reporting resource grade and project readiness level. It is particularly useful for describing early-stage exploration projects. GeoRePORT can assist in evaluating project risk and return, identifying gaps in reported data, evaluating research and design impacts, and gathering insights on successes and failures. It helps users objectively and quantitatively compare project potential in geological, technical, and socioeconomic areas.

Young, Katherine↗

GeoVision Analysis: Exploration Task Force Report

The GeoVision study effort included ground-breaking, detailed research on current and future market conditions and geothermal technologies in order to forecast and quantify the electric and non-electric deployment potentials under a range of scenarios, in addition to their impacts on the Nation’s jobs, economy and environment. Coordinated by the U.S. Department of Energy’s (DOE’s) Geothermal Technologies Office (GTO), the GeoVision study development relied on the collection, modeling, and analysis of robust datasets through seven national laboratory partners, which were organized into eight technical Task Force groups. The purpose of this report is to provide a central repository for the research conducted by the Exploration Task Force. The Exploration Task Force consists of four individuals representing three national laboratories: Patrick Dobson (task lead) and Christine Doughty of Lawrence Berkeley National Laboratory, Anna Wall of National Renewable Energy Laboratory, Travis McLing of Idaho National Laboratory, and Chester Weiss of Sandia National Laboratories. As part of the GeoVision analysis, our team conducted extensive scientific and financial analyses on a number of topics related to current and future geothermal exploration methods. The GeoVision Exploration Task Force complements the drilling and resource technology investigations conducted as part of the Reservoir Maintenance and Development Task Force. The Exploration Task Force however has focused primarily on early stage R&D technologies in exploration and confirmation drilling, along with an evaluation of geothermal financing challenges and assumptions, and innovative “blue-sky” technologies. This research was used to develop geothermal resource supply curves (through the use of GETEM) for use in the ReEDS capacity expansion modeling that determines geothermal technology deployment potential. It also catalogues and explores the large array of early-stage R&D technologies with the potential to dramatically reduce exploration and geothermal development costs, forming the basis of the GeoVision Technology Improvement (TI) scenario. These modeling topics are covered in detail in Potential to Penetration task force report. Most of the research contained herein has been published in peer-reviewed papers or conference proceedings and are cited and referenced accordingly. The sections that follow provide a central repository for all of the research findings of the Exploration and Confirmation Task Force. In summary, it provides a comprehensive discussion of Engineered Geothermal Systems (EGS) and associated technology challenges, the risks and costs of conducting geothermal exploration, a review of existing government efforts to date in advancing early-stage R&D in both exploration and EGS technologies, as well as a discussion of promising and innovative technologies and implementation of blue-sky concepts that could significantly reduce costs, lower risks, and shorten the time needed to explore and develop geothermal resources of all types.

15 GEOTHERMAL ENERGY↗

Future Scenario Development from Disruptive Exploration Technologies and Business Models in the U.S. Geothermal Industry

With recent trends toward intermittent renewable energy sources in the U.S., the geothermal industry in its current form faces a crossroad: adapt, disrupt, or be left behind. Strategic planning with scenario analysis offers a framework to characterize plausible views of the future given current trends - as well as disruptions to the status quo. To inform strategic planning in the Department of Energy's (DOE) Geothermal Technology Office (GTO), the Geothermal Vision Study is tasked with offering data-driven pathways for future geothermal development. Scenario analysis is a commonly used tool in private industry corporate strategic planning as a way to prioritize and manage large investments in light of uncertainty and risk. Since much of the uncertainty and risk in a geothermal project is believed to occur within early stage exploration and drilling, this paper focuses on the levers (technical and financial) within the exploration process that can be pulled to affect change. Given these potential changes, this work first qualitatively explores potential shifts to the geothermal industry. Future work within the Geothermal Vision Study will incorporate these qualitative scenarios quantitatively, in competition with other renewable and conventional energy industries.

15 GEOTHERMAL ENERGY↗

Refining the Definition of a Geothermal Exploration Success Rate

The geothermal exploration process impacts project development timelines, costs, and overall perceived risk. However, the success in the exploration phase of a geothermal project - and the calculation of a success rate - is universally ill-defined. In previous studies, the success of a geothermal process is loosely defined as the number of wells that result in commercially-viable production. This work focuses on refining the definition of success for the exploration process to represent an upper bound to the likelihood a project will proceed into commercial production. This research examines the topic of success from both a top-down and bottom-up approach: a review of previous assessments of success rate that identifies common conditions leading to successful exploration, and a project-level review of geothermal sites in the western United States focused on decision points in the geothermal exploration process. The analysis not only considers the impact of factors outside of the geothermal reservoir (i.e. delays due to financing or permitting), but also touches on the length of the exploration process and the symbiosis between exploration methods. Using a combination of these analyses, future work will investigate which levers within the geothermal exploration process have the strongest influence on overall project success.

15 GEOTHERMAL ENERGY↗

The Potential for Renewable Energy Development to Benefit Restoration of the Salton Sea. Analysis of Technical and Market Potential

This report summarizes the potential for renewable energy development in the Salton Sea region, as well as the potential for revenues from this development to contribute financially to Salton Sea restoration costs. It considers solar, geothermal, biofuels or nutraceutical production from algae pond cultivation, desalination using renewable energy, and mineral recovery from geothermal fluids.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Geothermal Project Database Supporting Barriers and Viability Analysis for Development by 2020 Timeline

This data provides the underlying project-level analysis and data sources complied in response to the DOE request to determine the amount of geothermal capacity that could be available to meet the President's request to double renewable energy capacity by 2020. The enclosed data contains compiled data on individual project names and locations (by geothermal area and region), ownership, estimated nameplate capacity, and project status, and also contains inferred data on the barriers and viability of the project to meet a 2020 development timeline. The analysis of this data is discussed in the attached NREL report.

15 GEOTHERMAL ENERGY↗