Search NASASearch

Engineering topics

Walton, Barbara A.

Publications and source records attributed to Walton, Barbara A..

Earth Observing System overview

The paper discusses major objectives and the primary components of the Earth Observing System (EOS), an integrated scientific observing system which will carry out remote sensing measurements for at least 15 years, providing comprehensive data andinformation in support of NASA's Mission to Planet Earth and the international Global Change Research Program. Particular attention is given to the functions of 18 instruments selected for EOS for the definition-phase investigations and to the mission profile.

Walton, Barbara A.

Platform evolution studies

The polar orbiting platform (POP), being developed by the Work Package 3 (WP3) Project at the Goddard Space Flight Center, will play a key role in the NASA Leadership Initiative, Mission to Planet Earth (MPE). It becomes, with the addition of payloads, an Earth observation satellite observatory. Mission to Planet Earth also has geostationary platforms (GEOP) as part of its global observational system. A study was begun in March 1988 to assess the applicability of the POP orbital replacement units (ORUs) for a geostationary Earth observing mission. Two test cases, representative of MPE payloads, were studied. Case A was used to emphasize the GEOP configuration and design; it used a Titan/Centaur to achieve orbit. Case B, considered to be much further in the future, included some assembly at the Space Station Freedom manned base and use of an orbital transfer vehicle to achieve orbit; requirements on the manned base to support such a mission were emphasized. The study found the POP systems more than adequate to meet GEOP requirements. Two types of changes were required for the POP ORUs: (1) modification to use only one surface for heat rejection; for the battery ORU, this meant 'opening up' the ORU to retain the radiator area with a corresponding decrease in depth; and (2) deletion of equipment not needed. The Case A configuration was shown to be within the planned capability of the Titan IV/Centaur. Assembly requirements were included for the Case B configuration, which is driven by the large microwave antennas of two of the payloads. The final review was April 19, 1989.

Walton, Barbara A.

U.S. Space Station platform - Configuration technology for customer servicing

Features of the Space Station coorbiting and polar orbiting platforms (COP and POP, respectively) are described that will allow them to be configured optimally to meet mission requirements and to be assembled, serviced, and modified on-orbit. Both of these platforms were designed to permit servicing at the Shuttle using the remote manipulator system with teleoperated end effectors; EVA was planned as a backup and for unplanned payload failure modes. Station-based servicing is discussed as well as expendable launch vehicle-based servicing concepts.

Dezio, Joseph A.