Search NASAโŒ• Search

NASA NTRS ยท 19940005430

Platform evolution studies

Abstract

The polar orbiting platform (POP), being developed by the Work Package 3 (WP3) Project at the Goddard Space Flight Center, will play a key role in the NASA Leadership Initiative, Mission to Planet Earth (MPE). It becomes, with the addition of payloads, an Earth observation satellite observatory. Mission to Planet Earth also has geostationary platforms (GEOP) as part of its global observational system. A study was begun in March 1988 to assess the applicability of the POP orbital replacement units (ORUs) for a geostationary Earth observing mission. Two test cases, representative of MPE payloads, were studied. Case A was used to emphasize the GEOP configuration and design; it used a Titan/Centaur to achieve orbit. Case B, considered to be much further in the future, included some assembly at the Space Station Freedom manned base and use of an orbital transfer vehicle to achieve orbit; requirements on the manned base to support such a mission were emphasized. The study found the POP systems more than adequate to meet GEOP requirements. Two types of changes were required for the POP ORUs: (1) modification to use only one surface for heat rejection; for the battery ORU, this meant 'opening up' the ORU to retain the radiator area with a corresponding decrease in depth; and (2) deletion of equipment not needed. The Case A configuration was shown to be within the planned capability of the Titan IV/Centaur. Assembly requirements were included for the Case B configuration, which is driven by the large microwave antennas of two of the payloads. The final review was April 19, 1989.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Walton, Barbara A.. 1990-01-01. Platform evolution studies. https://ntrs.nasa.gov/citations/19940005430

Cite the original work for its findings. Save a collection to share your selection of sources.