Search NASA⌕ Search

Engineering topics

Weaks, M.

Publications and source records attributed to Weaks, M..

First Results from Two Nb3Sn Cavities Assembled in a CEBAF Quarter Cryomodule

Two 1.5 GHz CEBAF C75-shape 5-cell accelerator cavities were coated with Nb3Sn film using the vapor diffusion technique at Fermilab and Jefferson Lab coating facilities. Both cavities were measured at 4 K and 2 K in the vertical cavity test facility (VCTF) in each lab, then assembled into a CEBAF quarter cryomodule at Jefferson Lab. The cryomodule was tested at 4 K and 2 K in the CryoModule Test Facility (CMTF) at Jefferson Lab. RF test results for both cavities in the cryomodule are similar to those in the qualification test in VTS, with one cavity reaching Eacc = 7.9 MV/m and the other - 13.3 MV/m at 4 K.

Eremeev, G.↗

First Results from two Nb3Sn Cavities Assembled in a CEBAF Quarter Cryomodule

Two 1.5 GHz CEBAF C75-shape 5-cell accelerator cavities were coated with Nb3Sn film using the vapor diffusion technique at Fermilab and Jefferson Labcoating facilities. Both cavities were measured at 4 K and 2 K in the vertical cavity test facility (VCTF) in each lab, then assembled into a CEBAF quartercryomodule at Jefferson Lab. The cryomodule was tested at 4 K and 2 K in the CryoModule Test Facility (CMTF) at Jefferson Lab. RF test results for bothcavities in the cryomodule are similar to those in the qualification test in VTS, with one cavity reaching Eacc =7.9 MV/m and the other - 13.3 MV/m at 4 K

Eremeev, G.↗

COMMISSIONING RESULTS OF THIRD C75 CRYOMODULE FOR CEBAF

The program to upgrade CEBAF cryomodules has been implemented to enhance the energy gain of refur-bished cryomodules up to 75 MeV. This strategy in-volves reusing the waveguide end-groups from original CEBAF cavities produced in the 1990s, and existing five elliptical cell cavities are replaced with a new optimized cell shape cavity constructed from large-grain, ingot Nb material. Following fabrication, each cavity undergoes centrifugal barrel polishing and electropolishing and is tested at 2.07 K. Eight cavities are then assembled into "cavity pairs" and tested at 2.07 K before integration into the cryomodule. This paper pre-sents the outcomes of the cavity qualification for the third C75 module, providing a detailed account of the assessment in both a vertical cryostat and the acceptance test results of the cryomodule. Furthermore, efforts have been made to address performance limitations arising from field emission and multipacting

Senevirathne, I.↗