Search NASA⌕ Search

NASA NTRS · 19850044370

Helium hammer in superfluid transfer

Abstract

Large transient pressure pulses, referred to as a helium hammer, which occurred in the transfer line of the main cryogenic tank during the development tests of the Infrared Astronomical Satellite, launched on January 25, 1983, are analyzed, and the measures taken to prevent a failure described. The modifications include an installation of a 2.3-liter surge tank upstream, and a back-up relief valve downstream, of a burst disk. The surge tank is designed to attenuate a 0.33-MPa pressure pulse at the inlet down to 0.092 MPa at the outlet. A mechanism of the pulse generation is suggested, which involves flashing and rapid recondensation of the small amount of liquid entering the warm section of a transition to room temperature.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Tward, E., Mason, P. V.. 1984-01-01. Helium hammer in superfluid transfer. https://ntrs.nasa.gov/citations/19850044370

Cite the original work for its findings. Save a collection to share your selection of sources.