Launch delay impact on the Galileo attitude control system
Abstract
The Galileo spacecraft was launched from the Space Shuttle in October 1989, using a two-stage inertial upper stage. The trajectory included flybys of Venus and earth for gravity assists. The mission duration increased to a total of 8 years rather than the original 4.5 years. The major impact of this new mission plan was on the thermal control design. A viable design was achieved, with one major attitude control constraint: the spacecraft antenna boresight must be pointed to within 14 deg of the sun whenever the spacecrat is within 1 AU of the sun, even in the presence of faults. Changes to hardware, software and operations strategies had to be made to handle the new and longer mission.
Keep this discovery
Explore connections, maps & timelines
Chodas, J. L., Weisenberg, D. M.. 1989-01-01. Launch delay impact on the Galileo attitude control system. https://ntrs.nasa.gov/citations/19900034498
Cite the original work for its findings. Save a collection to share your selection of sources.