Search NASAโŒ• Search

NASA NTRS ยท 20040200742

Shuttle Shaping Up

Abstract

Measures to sharply curtail ana document potentially fatal launch debris similar to that which doomed Columbia and her crew should allow the space shuttle to resume flights as early as May. But it could take up to two years before a fully certified thermal protection system and wing leading edge in-orbit repair capability is ready, shuttle managers say. The overall positive safety tradeoffs, however, are enabling return-to-flight preparations to accelerate this month toward making a serious run at launching the shuttle back to space by spring.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Covault, Craig. 2004-12-13. Shuttle Shaping Up. https://ntrs.nasa.gov/citations/20040200742

Cite the original work for its findings. Save a collection to share your selection of sources.