Abstract

The Veggie hardware validation test, VEG-01, was conducted on the International Space Station during Expeditions 39 and 40 from May through June of 2014. The Veggie hardware and the VEG-01 experiment payload were launched to station aboard the SpaceX-3 resupply mission in April, 2014. Veggie was installed in an Expedite-the-Processing-of-Experiments-to-Space-Station (ExPRESS) rack in the Columbus module, and the VEG-01 validation test was initiated. Veggie installation was successful, and power was supplied to the unit. The hardware was programmed and the root mat reservoir and plant pillows were installed without issue. As expected, a small amount of growth media was observed in the sealed bags which enclosed the plant pillows when they were destowed. Astronaut Steve Swanson used the wet/dry vacuum to clean up the escaped particles. Water insertion or priming the first plant pillow was unsuccessful as an issue prevented water movement through the quick disconnect. All subsequent pillows were successfully primed, and the initial pillow was replaced with a backup pillow and successfully primed. Six pillows were primed, but only five pillows had plants which germinated. After about a week and a half it was observed that plants were not growing well and that pillow wicks were dry. This indicated that the reservoir was not supplying sufficient water to the pillows via wicking, and so the team reverted to an operational fix which added water directly to the plant pillows. Direct watering of the pillows led to a recovery in several of the stressed plants; a couple of which did not recover. An important lesson learned involved Veggie's bellows. The bellows tended to float and interfere with operations when opened, so Steve secured them to the baseplate during plant tending operations. Due to the perceived intensity of the LED lights, the crew found it challenging to both work under the lights and read crew procedures on their computer. Although the lights are not a safety hazard, for visual comfort crewmembers were advised to wear sunglasses when working with the plants and then they can lift glasses to read procedures. Steve Swanson had already trail-blazed this procedure when he initiated VEG-01. The temperature and humidity data logger was relocated mid-experiment to provide measurements on both sides of the unit. Images of the plants were downlinked weekly, and videos of installation and harvest were recorded. This imaging frequency was not sufficient to monitor and respond to changes in plant growth. Plants, samples, and data loggers will be returned on SpaceX-4, scheduled to return the fall of 2014. Lessons learned will be translated into hardware and operational modifications for future Veggie payloads.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Massa, Gioia D., Dufour, Nicole F., Smith, T. M.. 2014-10-22. Veggie Hardware Validation Test Preliminary Results and Lessons Learned. https://ntrs.nasa.gov/citations/20150001374

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Stress Corrosion Evaluation of Inconel X-750 for the International Space Station Environmental Control and Life Support System

Inconel X-750 alloy was evaluated for stress corrosion in support of the International Space Station Environmental Control and Life Support System. Round tensile specimens that were obtained from 0.25 in thick material successfully completed 365 days of exposure to baseline pretreat, baseline brine, alternate pretreat, alternate brine, and 3.5% NaCl alternate immersion without any failures at stresses of up to 90% of the yield strength. Posttest evaluations consisting of metallography and tensile testing did not indicate stress corrosion susceptibility.

International Space Station↗

ISS Universal Waste Management System (UWMS) Optical Sensor: Phase 2

Collins Aerospace has delivered a new Universal Waste Management System (UWMS) to the International Space Station (ISS), which is not operational, partially due to a faulty urine pretreat concentration sensor. The ISS Program requested help from the NASA Engineering and Safety Center (NESC) in developing such a sensor. The first phase of this effort was to determine if an optical approach was feasible. The second Phase, the topic of this report, was to determine the impact of ISS water contaminants and pretreat aging on the performance of the sensor and to design, construct, and test a prototype sensor.

International Space Station↗

Commercial Low-Earth Orbit Destination (CLD) Capabilities of Interest and Resource Needs

The Commercial Low Earth Orbit (LEO) Development Program team has been working with NASA and the International Space Station (ISS) National Lab (NL) stakeholders to identify capabilities of interest to both conduct research/technology demonstrations and estimate the resources that will be needed from Commercial LEO Destinations (CLDs). Through a series of one-on-one and working group meetings with users/stakeholders, hardware items of interest to the user community were identified and converted into capabilities (e.g., centrifugation, microscope, pressure chamber, etc.). In parallel, resources needed to operate the research equipment (e.g., crew time, number of experiments, volume, etc.) were estimated in order for the CLD providers to better understand NASA’s potential future service requirements. The capabilities and the resources included in this White Paper do not represent NASA requirements. Instead, they constitute a preliminary set of potential capability and resource needs collated to guide CLD providers in appropriately sizing and outfitting their CLD designs. NASA is requesting feedback from industry on how these capabilities and resources align with their own needs as well as those of their non-NASA customers. Information on how the capabilities/resources impact the CLD designs is also requested. After assessing industry’s feedback to this white paper, NASA plans to issue a preliminary set of requirements for review.

International Space Station↗