Search NASA⌕ Search

NASA NTRS · 20240003618

Variation in Predicted Orbital Lifetime Due to Launch Year

Abstract

We present trends in predicted orbital lifetimes of CubeSats based not only on orbital parameters, but also launch year and the Area-to-Mass (AtM) ratio of the CubeSat. Determining the orbital lifetime variation of CubeSats in low-Earth orbit (LEO) is an important aspect of mission planning because of two competing factors: (1) the maximum orbital lifetime for orbital debris mitigation requirements, and (2) the minimum orbit duration necessary to accomplish the spacecraft mission requirements. The orbital lifetime is a function of orbital parameters, the AtM ratio of the CubeSat, and date of orbit insertion. Solar flux varies with time, peaking and declining across the 11-year solar cycle and affecting the amount of atmospheric drag on the CubeSat. This results in large variations in orbital lifetime dependent on the mission's launch date. We calculated the variation of orbital lifetime for multiple commonly used 1U to 6U CubeSat mission types across the two upcoming solar cycles. For any given AtM ratio and altitude combination in this analysis, the predicted orbital lifetime varies up to a factor of five due to orbit insertion occurring in a different year. Some examples of orbital lifetime spreads are 5 months to 2 years, and 1.5 to 7.5 years. While orbital lifetimes correlate to the solar cycle, the phasing of the maximum values varies based on a given AtM ratio and altitude combination. Different combinations of these two factors will result in the maximum predicted orbital lifetime occurring at different launch years throughout the solar cycle. Therefore, there is not a specific year within a solar cycle which can be used to calculate the maximum predicted orbital lifetime for all CubeSats. Since CubeSats are typically flown as a rideshare payload on a launch vehicle, mission planners must account for launch date variation in their orbital lifetime predictions. We recommend calculating orbital lifetime for a range of dates to allow for risk planning due to launch date slips, and other mission planning best practices.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Caley Burke. Variation in Predicted Orbital Lifetime Due to Launch Year. https://ntrs.nasa.gov/citations/20240003618

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

GPX2

GPX2is a technology demonstration mission that will provide a novel test-bed for Commercial-Off-the-Shelf (COTS) differential global positioning systems (dGPS) to enable future on-orbit assembly, docking, and formation-flying small satellite missions. While on-orbit,GPX2will assess the capability of multi-frequency COTS dGPS receivers.GPX2 is passively stabilized using a 2-meter gravity gradient boom, providing a local orbit horizon view to the GPX2 antennae and Iridium communication. By demonstrating dGPS on-orbit, GPX2 paves the way for on-orbit assembly and autonomous robotic operations using high-accuracy dGPS to measure relative proximity and orientation.

CubeSat↗

Chapter 15: Propulsion System

During mission design, many trades are made that have varying levels of impact on the spacecraft. The types of subsystems that are selected affect the spacecraft mass,volume, power, and cost. Choosing the right propulsion system for a CubeSat mission is key to that mission’s success. There are many CubeSat propulsion systems on the market today. The CubeSat community desires to understand how to assess the available propulsion systems and how to apply them to their mission designs. The purpose of this chapter is to inform the reader of the key factors that must be considered when evaluating and applying these systems for various missions.

CubeSat↗

Simulation-to-Flight 1 (STF-1): Automating the Planning, Scheduling, Assessment and Data Processing/Reduction for a Small Satellite

On December 16, 2019, a 3-U CubeSat named STF-1 launched as West Virginia's first spacecraft. This event marked the culmination of a run-up to launch involving the production of the spacecraft, creation/configuration of command and control infrastructure, and the evolution of its co-creation, the NASA Operational Simulator for Small Satellites (NOS3). This event also marked the beginning of a new phase: operations. While plans, procedures, and infrastructure were already in place or started for operations, many lessons were learned during the operations phase, especially during early operations (first month/commissioning phase). Additional plans, procedures, and infrastructure, especially related to communication planning and automated data processing, were created and developed to fill needs for the operation of the STF-1 mission.This paper and presentation will overview the STF-1 operations team's solutions to addressing the many needs of operating a low-earth orbiting CubeSat mission with a single ground antenna that is shared and scheduled with several other missions. The STF-1 operations team deployed a combination of virtualization technologies, ground station technology solutions, collaboration software, custom planning software solutions, and existing ground antenna scheduling solutions to create an effective and efficient CubeSat operations environment. The end-solution satisfied the operations stakeholders, which include NASA, its industry partner TMC Technologies, and four independent professor-student teams at West Virginia University.

CubeSat↗