Search NASA⌕ Search

DOE OSTI · 1020477

Integrated work management system.

Abstract

Sandia National Laboratories develops technologies to: (1) sustain, modernize, and protect our nuclear arsenal (2) Prevent the spread of weapons of mass destruction; (3) Provide new capabilities to our armed forces; (4) Protect our national infrastructure; (5) Ensure the stability of our nation's energy and water supplies; and (6) Defend our nation against terrorist threats. We identified the need for a single overarching Integrated Workplace Management System (IWMS) that would enable us to focus on customer missions and improve FMOC processes. Our team selected highly configurable commercial-off-the-shelf (COTS) software with out-of-the-box workflow processes that integrate strategic planning, project management, facility assessments, and space management, and can interface with existing systems, such as Oracle, PeopleSoft, Maximo, Bentley, and FileNet. We selected the Integrated Workplace Management System (IWMS) from Tririga, Inc. Facility Management System (FMS) Benefits are: (1) Create a single reliable source for facility data; (2) Improve transparency with oversight organizations; (3) Streamline FMOC business processes with a single, integrated facility-management tool; (4) Give customers simple tools and real-time information; (5) Reduce indirect costs; (6) Replace approximately 30 FMOC systems and 60 homegrown tools (such as Microsoft Access databases); and (7) Integrate with FIMS.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Williams, Jr, Edward J, Henry, Karen Lynne. 2010-06-01. Integrated work management system.. https://www.osti.gov/biblio/1020477

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Fire Protection Design

The purpose of this project is to design the demolition and installation of a deluge valve swap from a DV-5 to a DV-5A valve.

99 GENERAL AND MISCELLANEOUS↗