DOE OSTI · 1244193
Hydropower Baseline Cost Modeling, Version 2
Abstract
Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gaps in publically available hydropower cost estimating tools that can support the national-scale evaluation of hydropower resources.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
O'Connor, Patrick W.. 2015-09-01. Hydropower Baseline Cost Modeling, Version 2. https://doi.org/10.2172/1244193
Cite the original work for its findings. Save a collection to share your selection of sources.