Robust Distribution Network Reconfiguration

Also available from

Abstract

We propose a two-stage robust optimization model for the distribution network reconfiguration problem with load uncertainty. The first-stage decision is to configure the radial distribution network and the second-stage decision is to find the optimal a/c power flow of the reconfigured network for given demand realization. We solve the two-stage robust model by using a column-and-constraint generation algorithm, where the master problem and subproblem are formulated as mixed-integer second-order cone programs. Computational results for 16, 33, 70, and 94-bus test cases are reported. We find that the configuration from the robust model does not compromise much the power loss under the nominal load scenario compared to the configuration from the deterministic model, yet it provides the reliability of the distribution system for all scenarios in the uncertainty set.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Lee, Changhyeok, Liu, Cong, Mehrotra, Sanjay, Bie, Zhaohong. 2015-03-01. Robust Distribution Network Reconfiguration. https://doi.org/10.1109/tsg.2014.2375160

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Attention Enabled Multi-Agent DRL for Decentralized Volt-VAR Control of Active Distribution System Using PV Inverters and SVCs

This paper proposes attention enabled multi-agent deep reinforcement learning (MADRL) framework for active distribution network decentralized Volt-VAR control. Using the unsupervised clustering, the whole distribution system can be decomposed into several sub-networks according to the voltage and reactive power sensitivity relationships. Then, the distributed control problem of each sub-network is modeled as Markov games and solved by the improved MADRL algorithm, where each sub-network is modeled as an adaptive agent. An attention mechanism is developed to help each agent focus on specific information that is mostly related to the reward. All agents are centrally trained offline to learn the optimal coordinated Volt-VAR control strategy and executed in a decentralized manner to make online decisions with only local information. Compared with other distributed control approaches, the proposed method can effectively deal with uncertainties, achieve fast decision makings, and significantly reduce the communication requirements. Comparison results with model-based and other data-driven methods on IEEE 33-bus and 123-bus systems demonstrate the benefits of the proposed approach.

distribution network↗

Hierarchical, Grid-Aware, and Economically Optimal Coordination of Distributed Energy Resources in Realistic Distribution Systems

Renewable portfolio standards are targeting high levels of variable solar photovoltaics (PV) in electric distribution systems, which makes reliability more challenging to maintain for distribution system operators (DSOs). Distributed energy resources (DERs), including smart, connected appliances and PV inverters, represent responsive grid resources that can provide flexibility to support the DSO in actively managing their networks to facilitate reliability under extreme levels of solar PV. This flexibility can also be used to optimize system operations with respect to economic signals from wholesale energy and ancillary service markets. Here, we present a novel hierarchical scheme that actively controls behind-the-meter DERs to reliably manage each unbalanced distribution feeder and exploits the available flexibility to ensure reliable operation and economically optimizes the entire distribution network. Each layer of the scheme employs advanced optimization methods at different timescales to ensure that the system operates within both grid and device limits. The hierarchy is validated in a large-scale realistic simulation based on data from the industry. Simulation results show that coordination of flexibility improves both system reliability and economics, and enables greater penetration of solar PV. Discussion is also provided on the practical viability of the required communications and controls to implement the presented scheme within a large DSO.

distribution network↗