Search NASA⌕ Search

DOE OSTI · 1659816

Least-Cost Pathways for India's Electric Power Sector

Abstract

The Government of India has a target of deploying 175 GW from renewable energy by 2022 and 40% of electricity capacity from renewable energy by 2030 and has indicated that ambitions for 2030 could be higher. Rapid changes in technology costs and performance could drive further deployment of wind and solar capacity beyond these policy targets. Increased deployment of variable renewable energy (VRE) raises new questions for power system planning regarding the optimal siting of generation capacity, trade-offs between generation and transmission infrastructure, and system flexibility needs. This study aims to evaluate least-cost pathways for India's electric power system over the period 2017-2047. Uniquely, this work considers an expanded planning horizon and range of scenarios not previously analyzed in national planning studies in India. The data collection and model design processes undertaken for this study provides a framework for recurring planning studies. This study finds anticipated changes in electricity demand and component costs can drive a significant shift in India's future electricity supply and how this system will be operated. In the Base scenario, the share of generation from VRE reaches 54% by 2047. Reducing the capital cost of wind has a larger impact on VRE penetration than reducing the capital cost of solar PV or battery storage. In the lowest wind cost scenario (40% capital cost decline by 2047 relative to the Base scenario), the penetration of VRE in the generation mix reaches 722%, exceeding the penetration levels achieved when the cost of battery storage or solar PV are reduced by an even greater 50%. In a future system with high penetrations of RE, capacity additions are driven by the coincidence of demand and RE generation rather than peak demand alone. This study finds the system could have surplus capacity during the peak demand months of July–September because this period corresponds to periods with high wind speeds and more wind generation available to meet peak demand. By contrast, new capacity is needed to meet demand during moderate demand months of October–November when output from wind plants falls more than 75% nationally compared to the previous two months. Finally, the success for gas for electricity production may depend on cost competitiveness rather than fuel availability. Increasing the amount of gas available for electricity production had no significant impact on the capacity or generation mix by 2047, as determined from a scenario that significantly increases fuel availability throughout the planning horizon. In fact, over 80% of new gas fuel available for the power sector remains unused. This suggests the high cost of gas plant operations relative to other technologies may constrain the expansion of gas generation in India more than fuel availability.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Rose, Amy, Chernyakhovskiy, Ilya, Palchak, Joseph, Koebrich, Samuel, Joshi, Mohit. 2020-05-01. Least-Cost Pathways for India's Electric Power Sector. https://doi.org/10.2172/1659816

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Heliostat sizing methodology for concentrating solar thermal industrial process heat projects

This study presents a method to obtain a heliostat size that minimizes the levelized cost of heat (LCOH) of a heliostat-based concentrating solar thermal system for applications of solar heating for industrial processes at operating temperatures from 565 to 1550°C. The method extends prior work by embedding a routine for system design that obtains near-optimal subsystem sizes, increasing the fidelity of drive cost functions, and adding an optical performance model to supplement the previously developed cost models, which we update to reflect current pricing trends. An illustrative business case is developed for Daggett, California, targeting specified annual thermal energy outputs of 50 to 400 GWh th . Optical performance is modeled using verified estimates from the literature. A surrogate heliostat cost model, derived from commercial heliostat designs and scaled for production volume, installation, and operations and maintenance costs, is used to develop cost functions. Results show that heliostat size strongly affects the LCOH, producing a characteristic U-shaped trend with a robust near-optimal window of 7-20 m 2 ; the heliostat size producing the lowest project cost in our study grows slightly as the project size increases, and is reduced as the operating temperature increases. The findings in this study are consistent with the general trend of smaller heliostats being deployed at existing projects for high-temperature industrial process heat and reflect the significant reduction in power electronics and other per-heliostat costs. The methodology we propose is general and can be tailored to revised cost curves as the technology continues to evolve.

14 SOLAR ENERGY↗

A Sensitivity-driven Wide Area Protection (SWAP) Coordination Tool for High Penetration of Inverter-based Resources (IBR)

Traditionally, power system generation sources have been composed of synchronous generators, of which the fault current behavior is understood with minimal differences between generation size and types due to the physics of their construction. Present protection schemes and modeling methods are based upon these understood characteristics. Most renewable generation is composed of inverter-based resources (IBR), in which fault current is determined by switching control software and hardware limitations, each of which can vary between manufacturers and even between models of the same manufacturer. The resulting fault current is low in magnitude, low in negative-sequence current, unpredictable phase angles, and is a challenge to model. These characteristics also result in a challenge to traditional protection schemes and fault simulation software. To address several of these concerns, the project has the following goals: 1. Improve IBR models: Improve IBR models used in short circuit (SC) programs to accurately capture the response of IBRs at the bulk power system (BPS) level for fault and protection studies. 2. Develop automation tool: Develop an automation tool that allows engineers to identify protection coordination and sensitivity issues by performing SC and protection coordination studies in a high IBR-penetrated grid by applying variations to the IBR models, faults, contingencies, etc. 3. Develop schemes: Develop new protection mitigation solution schemes that complement the existing protection systems to ensure safe operation of the BPS with higher IBR penetration levels. The project team did not achieve this final goal, as the Department of Energy (DOE) stopped the project early due to changes in DOE funding priorities. The termination notice came at the beginning of the final project phase, while the team was identifying and beginning to investigate protection issues. It should be noted that the team discussed a 100% penetration scenario. However, this scenario would require the use of grid-forming IBR models that are not presently available. Since developing these models requires additional effort, the 100% penetration scenario was not pursued during this project. In the future, developing the methodology and models for the 100% scenario could benefit the industry.

14 SOLAR ENERGY↗

Technoeconomic Analysis Round Robin of a Retrofit of the Ivanpah Concentrating Solar Plant with a Molten-Salt System with Thermal Energy Storage

While the fidelity of technoeconomic analysis (TEA) models for concentrating solar thermal systems has improved in recent years, there is a lack of consensus on the specific inputs used to forecast performance of a newly built tower system due to a lack of validations and post-mortems available to the public. This effort is a joint initiative between multiple international organizations to validate and compare their TEA models. The specific case study is a proposed retrofit of one unit of the Ivanpah Solar Energy Generating System to include molten-salt storage, replacing the steam generation system with a molten-salt receiver, salt-to-steam heat exchanger train, and new balance of plant while keeping the existing steam turbine, solar field, and interconnection in place, using plant data for calibration. This manuscript discusses several of the agreed-upon assumptions for this study as well as a preliminary analysis from prior work that motivates the study.

14 SOLAR ENERGY↗