Search NASA⌕ Search

DOE OSTI · 1774956

Vacuum system design, construction, and operation for the Cornell High Energy Synchrotron Source upgrade

Abstract

During the summer and fall 2018, the Cornell High Energy Synchrotron Source (CHESS), underwent an upgrade that recast the facility as primarily a low emittance X-ray source. The upgrade replaced one sixth of the Cornell Electron Storage Ring (CESR) with six double-bend achromats, featuring four novel CHESS Compact Undulator (CCU) insertion devices, and switched CESR to single particle beam operation. At the time of this writing, the upgraded storage ring has achieved the CHESS-U design goal of operating with 200 mA of positron current at 6.0 GeV beam energy. Additionally, seven out of eleven CHESS-U beamlines are currently in X-ray user operation. The construction and the commissioning of the new section of the CESR accelerator required novel solutions to design, fabrication, and vacuum system operations. Significant design considerations and efforts were made to minimize X-ray ‘dark-time’, returning to operation less than 1 year. This paper describes the important milestones of the process, the solutions implemented, and the present status of CHESS-U.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Lushtak, Yevgeniy, Burke, David, Li, Yulin, Lyndaker, Aaron, Liu, Xianghong, Ying, Laurel. 2021-01-13. Vacuum system design, construction, and operation for the Cornell High Energy Synchrotron Source upgrade. https://doi.org/10.1016/j.vacuum.2021.110064

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Design and Integration of High Precision Superconducting Magnet Power Supply Systems

This paper reviews the design and integration approach being taken to power more than 400 superconducting magnets in Electron Ion Collider (EIC) by power supplies ranging from 20V to 400V and 100A to 18kA. A major challenge is to integrate existing legacy power supplies with new high current systems and maximize performance and reduce costs. Successful implementation requires coordinated integration of power convertors, current regulation, quench protection, energy extraction, machine protection, controls and existing accelerator infrastructure.

43 PARTICLE ACCELERATORS↗

Searching for the Most Harmful Field Errors in the HSR IR Superconducting Magnets

In this project, we improve beam stability for the Electron-Ion Collider. Magnetic field errors can reduce beam stability, making it essential to identify the field errors that have the greatest impact on accelerator performance. However, this is particularly challenging because beam stability depends on the complex interactions of many magnetic field errors, resulting in a high-dimensional and nonlinear optimization problem. We determine which field errors are the most influential for the large physical aperture superconducting magnet B2PF, a critical magnet in the Interaction Region (IR) in the Hadron Storage Ring (HSR). We complete and analyze nearly 30,000 simulations on the Brookhaven National Laboratory Linux Cluster by varying 18 nonlinear magnetic field errors. We evaluate beam stability using the dynamic aperture and the tune diffusion. We identify the field errors that most strongly influence beam stability and establish quantitative field error tolerances that improve accelerator performance.

43 PARTICLE ACCELERATORS↗