DOE OSTI · 1873124
Surplus Plutonium Disposition Sphincter Seal Development & Testing
Abstract
The Surplus Plutonium Disposition Project (SPD, Project Y744) requested the Savannah River National Laboratory (SRNL) to perform a series of leak and durability tests on sphincter seals that were designed to process blend cans and shield cans into an SPD glovebox. Each sphincter seal assembly consisted of a stainless-steel outer sleeve weldment that was bolted onto the test enclosure and an aluminum inner sleeve that housed seven to nine Neoprene seals. All tests were executed to determine long term effects from processing approximately a year’s worth of blend and shield cans through the sphincter seals.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Krementz, Daniel, Lawson, R. J., Simoes-Ponce, T.. 2021-04-01. Surplus Plutonium Disposition Sphincter Seal Development & Testing. https://doi.org/10.2172/1873124
Cite the original work for its findings. Save a collection to share your selection of sources.