Search NASA⌕ Search

DOE OSTI · 1885025

Synchronous High-frequency Distributed Readout For Edge Processing At The Fermilab Main Injector And Recycler

Abstract

The Main Injector (MI) was commissioned using data acquisition systems developed for the Fermilab Main Ring in the 1980s. New VME-based instrumentation was commissioned in 2006 for beam loss monitors (BLM)[2], which provided a more systematic study of the machine and improved displays of routine operation. However, current projects are demanding more data and at a faster rate from this aging hardware. One such project, Real-time Edge AI for Distributed Systems (READS), requires the high-frequency, low-latency collection of synchronized BLM readings from around the approximately two-mile accelerator complex. Significant work has been done to develop new hardware to monitor the VME backplane and broadcast BLM measurements over Ethernet, while not disrupting the existing operations critical functions of the BLM system. This paper will detail the design, implementation, and testing of this parallel data pathway.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Berlioz, J. R., Austin, M. R., Arnold, J. M., Hazelwood, K. J. (ORCID:0000000222119227), Hanlet, P., Ibrahim, M. A., Narayanan, A., Nicklaus, D. J., Praudhan, G., Saewert, A. L., Schupbach, B. A., Seiya, K., Thurman-Keup, R. M. (ORCID:0000000253243335), Tran, N. V. (ORCID:0000000284406854), Jang, J., Liu, H. (ORCID:0000000166581993), Memik, S., Shi, R., Thieme, M., Ulusel, D.. 2022-08-31. Synchronous High-frequency Distributed Readout For Edge Processing At The Fermilab Main Injector And Recycler. https://www.osti.gov/biblio/1885025

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Design and Integration of High Precision Superconducting Magnet Power Supply Systems

This paper reviews the design and integration approach being taken to power more than 400 superconducting magnets in Electron Ion Collider (EIC) by power supplies ranging from 20V to 400V and 100A to 18kA. A major challenge is to integrate existing legacy power supplies with new high current systems and maximize performance and reduce costs. Successful implementation requires coordinated integration of power convertors, current regulation, quench protection, energy extraction, machine protection, controls and existing accelerator infrastructure.

43 PARTICLE ACCELERATORS↗

Searching for the Most Harmful Field Errors in the HSR IR Superconducting Magnets

In this project, we improve beam stability for the Electron-Ion Collider. Magnetic field errors can reduce beam stability, making it essential to identify the field errors that have the greatest impact on accelerator performance. However, this is particularly challenging because beam stability depends on the complex interactions of many magnetic field errors, resulting in a high-dimensional and nonlinear optimization problem. We determine which field errors are the most influential for the large physical aperture superconducting magnet B2PF, a critical magnet in the Interaction Region (IR) in the Hadron Storage Ring (HSR). We complete and analyze nearly 30,000 simulations on the Brookhaven National Laboratory Linux Cluster by varying 18 nonlinear magnetic field errors. We evaluate beam stability using the dynamic aperture and the tune diffusion. We identify the field errors that most strongly influence beam stability and establish quantitative field error tolerances that improve accelerator performance.

43 PARTICLE ACCELERATORS↗